Tenant Improvement / Tenant Finish Permit in Winter Park, Colorado

Required for interior build-out, finish, or alteration of a commercial tenant space within the joint Winter Park/Fraser/Granby jurisdiction. 'Tenant Finish' is an explicit, distinct checkbox under 'Class of Work' (Section 5) on the joint Building Permit Application — listed separately from New, Addition, Alteration, Repair, Move, and Remove — confirming the Building Department treats tenant-improvement work as its own recognized permit category. However, it flows through the SAME joint application form, the SAME 2021 IBC-based Town Code 6-1-2 review, and the SAME valuation-based Table 1-11-2B fee schedule as new commercial construction — there is no standalone TI-specific application, fee table, or published review-timeline SLA.

Reviewed 2026-08-02 · Source

When you need this permit

  • Same joint Building Permit Application (Towns of Winter Park, Fraser and Granby), with 'Tenant Finish' checked under Class of Work (Section 5) and 'Commercial' checked under Use of Building (Section 4)
  • Gross square footage of the tenant space/building portion being finished, plus Construction Type and Occupancy Type, per the application's 'All Other Buildings and Structures' fields
  • Valuation of the tenant finish work is captured via the application's 'Valuation of Alterations, Repairs and Remodels' field (actual cost to owner — materials and labor) for the 'All Other Buildings and Structures' column, feeding the same Table 1-11-2B fee schedule as every other Building Division permit type
  • Fire suppression/alarm system plans (if the tenant space has or will have one) must be separately reviewed by East Grand Fire Protection District No. 4's Fire Prevention Office — the District's own notice specifically instructs applicants to contact the District ASAP 'before any remodel work is started on any building that has an existing fire sprinkler system,' which is directly on point for finish work inside an already-sprinklered commercial shell
  • Buildings/spaces must meet the same IBC Chapter 11 accessibility requirements (Town Code 6-1-2, Section 1102.1) as new commercial construction
  • Licensed Colorado design professional's stamped documents required under the same structural triggers as other Building Division permits if the tenant finish involves structural work (non-conventional framing, load-bearing changes, etc.)
  • Contractor Insurance Affidavit and Notification of Sales Tax Liability Agreement required submittal items, same as other Building Division permits
  • Sales/Use Tax Audit Gate applies identically before final inspection/certificate of occupancy or completion (Town Code 6-1-2, Section 110.3.12)
  • Electrical work inside the tenant space is a SEPARATE permit filed directly with the Colorado State Electrical Board, not with this Building Division

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based Table 1-11-2B as every other Building Division permit type)Town Code Title 1, Chapter 11, Table 1-11-2B. Per the joint application form, tenant-finish valuation is captured as 'actual cost to owner' (materials and labor) for the 'All Other Buildings and Structures' Alterations/Repairs/Remodels field — the identical mechanism used for any other alteration/repair, not a separately published TI rate
$54.00 minimum, scaling per the same valuation tiers documented in the residential-building-permit entry
Plan Review Fee
65% of the Building Permit Fee
Reinspection Fee
$47.00/hour (1-hour minimum)

Review timeline

Plan review
Not published — contact the department

How long did your Tenant Improvement / Tenant Finish Permit permit actually take in Winter Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Framing / Rough Plumbing / Rough Mechanical (if applicable to scope)

  2. 2

    Fire Suppression / Fire Alarm Rough-In and Final

    Scheduled through East Grand Fire Protection District No. 4's Fire Prevention Office if the tenant space has, or the finish work affects, a sprinkler or alarm system

  3. 3

    Final Building Inspection

    Requires sales/use tax audit completion or waiver before certificate of occupancy/completion

See the full Winter Park inspection guide — scheduling & re-inspection fees →

Tips

  • 'Tenant Finish' is checked as its own distinct Class of Work on the same joint application used for every other Building Division permit — don't assume it requires a categorically different form or process from a general commercial building permit.
  • If the shell building already has a fire sprinkler system, contact East Grand Fire Protection District No. 4 ASAP before starting tenant-finish remodel work — this is called out specifically, by name, in the District's own applicant notice.
  • No separate TI fee schedule exists — valuation is set by actual documented cost of the finish work (materials and labor), run through the same Table 1-11-2B schedule as any other alteration or repair permit.

Frequently asked questions

Yes — East Grand Fire Protection District No. 4's own applicant notice specifically instructs applicants to contact the District as soon as possible before starting any remodel work on a building that already has a fire sprinkler system, separate from the Building Division's own permit review.

In Winter Park, the published Building Permit Fee (same valuation-based Table 1-11-2B as every other Building Division permit type) is: $54.00 minimum, scaling per the same valuation tiers documented in the residential-building-permit entry. Additional published fees: Plan Review Fee — 65% of the Building Permit Fee; Reinspection Fee — $47.00/hour (1-hour minimum). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Winter Park does not publish a plan-review timeline for this permit. Contact Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) at (970) 726-8081 for current turnaround.

You'll need: Building Permit Application (Towns of Winter Park, Fraser and Granby); Construction Drawings (existing shell + proposed tenant finish); Contractor Insurance Affidavit. Depending on your project, Winter Park may also ask for: Fire Suppression / Fire Alarm System Plans. See the required-documents checklist on this page for details on each.

Winter Park requires 3 inspection(s) for a tenant improvement / tenant finish permit, in order: Rough Framing / Rough Plumbing / Rough Mechanical (if applicable to scope), Fire Suppression / Fire Alarm Rough-In and Final, Final Building Inspection. Schedule each through Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) ((970) 726-8081).

Apply through Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) at 50 Vasquez Road, Suite B, P.O. Box 3327, Winter Park, CO 80482. Phone: (970) 726-8081, email: permits@wpgov.com. Office hours: Monday-Friday, 8:00am-5:00pm. Official information: https://wpgov.com/our-government/departments/building/.

Winter Park, Colorado has adopted: 2021 International Building Code (IBC), as amended by Town Code Title 6, Chapter 1, Section 2 (6-1-2) — codified currently through Ord. 619, Series of 2024; 2021 International Residential Code (IRC), as amended by Town Code 6-1-3; International Plumbing Code, most current edition as adopted by the State of Colorado (per Town Code 6-1-1/6-1-4 cross-reference; the Town's own Codes Adopted by Reference section lists 'International Plumbing Code, 2021 Edition'); 2021 International Mechanical Code (IMC), as amended by Town Code 6-1-5; 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC); 2021 International Fire Code (IFC), including all appendices; 2021 International Existing Building Code (IEBC), as amended by Town Code 6-1-9; National Electrical Code (NEC), 2020 Edition per the current Codes Adopted by Reference list, though Town Code 6-1-10 states the Town concurrently adopts whatever edition the State of Colorado has most recently adopted — electrical permitting itself is administered by the Colorado State Electrical Board, not the local Building Division (see localAmendments); 2023 Colorado Electric Ready and Solar Ready Code, as amended by Town Code 6-1-11 (Ord. 619, Series of 2024); 2025 Colorado Wildfire Resiliency Code — statutorily mandated statewide for jurisdictions with mapped Wildland-Urban Interface (WUI) area, adoption required by April 1, 2026 and full compliance by July 1, 2026 per the Colorado Division of Fire Prevention and Control; the Town's own website (wpgov.com Building Division page) carries a 'Wildfire Resiliency Code Update' notice confirming the Town is subject to this new statewide code, but the Town had not yet published its own locally-amended code text/section numbers for this specific code as of the date of this extraction — see localAmendments for what is and is not yet verifiable; Full adopted code text (Town Code Title 6, Chapter 1) hosted at codelibrary.amlegal.com/codes/winterparkco/latest/winterpark_co/0-0-0-2239. Local amendments apply — see the Winter Park overview page for the full list.

Not a categorically separate application or fee schedule — but 'Tenant Finish' is an explicit, distinct checkbox under Class of Work on the same joint Winter Park/Fraser/Granby Building Permit Application, and it goes through the same Table 1-11-2B valuation-based fee schedule and 2021 IBC-based Town Code 6-1-2 review as any other commercial building permit.