Tenant Improvement / Interior Remodel Permit (Tenant Finish) — Loveland, Colorado · Requirements sheet
Verified 2026-08-02 · Source: https://www.lovgov.org/services/development-services/building-division/forms-and-applications/non-residential-and-multi-family-forms
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Tenant Improvement / Interior Remodel Permit (Tenant Finish) in Loveland, Colorado
Required for interior remodel/build-out of existing non-residential (commercial, industrial, institutional) tenant spaces in Loveland, using the City's 'Non-Residential Building Permit Application - Existing Building Interior Remodel/Tenant Finish' form. Distinct from, and required in addition to, a core-and-shell new-construction building permit — the City does not allow partial tenant build-outs under a new-building permit. Submit electronically to eplan-building@cityofloveland.org.
Verified 2026-08-02 · Source
When you need this permit
- Building permit required for Interior Remodel/Tenant Finish, explicitly listed as a 'Non-Residential' project type requiring a building permit on the City's Permitting FAQ's page
- A separate Tenant Finish permit is required for EACH tenant space in a building; a core-and-shell (new construction) permit cannot be used to build out any tenant space
- For tenant finish/interior alteration projects, provide a layout showing the tenant space within the entire building, plus the maximum number of tenants (Addressing Division requirement)
- Wastewater Discharge Survey required for tenant finishes on City water/sewer (the Non-Residential Checklist's use-category list is explicitly noted to include Tenant Finishes)
- Cross-Connection/Backflow Prevention Questionnaire required if serviced by City water, for tenant finishes and interior alterations
- Alcohol Beverage Manufacturing Survey Form required if alcohol will be produced within the tenant space
- Food Service Establishment Application required if food will be prepared or served within the tenant space
- Application captures tenant finish occupancy group(s), occupant load, per-floor/mezzanine finished and unfinished square footage, use category, drive-thru status, and number of units being finished
- A valid City of Loveland Contractor's License is required for structural, mechanical, electrical, or plumbing work; the self-perform homeowner exemption does not apply to non-residential buildings Owner-builderContractor
- Water-Resistive Barrier inspection requirements applicable to commercial buildings under the City's Building FAQs apply where exterior envelope work is part of the tenant finish scope
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical / Rough Mechanical / Rough Plumbing
Where the tenant finish scope includes new wiring, ductwork, or piping, before walls/ceiling are closed (Inspection Type Codes 3305 / 4405 / 5505)
- 2
Above Ceiling Electrical / Mechanical / Plumbing
For tenant finishes with new ceiling-plenum work, before ceiling grid/tile installation (Inspection Type Codes 3335 / 4435 / 5535)
- 3
Fire-Rough/Hydro
Where the scope modifies fire alarm, sprinkler, or hood suppression systems, scheduled separately with Loveland Fire Rescue Authority (Inspection Type Code 8840)
- 4
Final Electrical / Final Mechanical / Final Plumbing / Final Building
All tenant finish work complete per approved plans (Inspection Type Codes 3350 / 4450 / 5550 / 2250)
- 5
Certificate of Occupancy Issuance
Final step; tenant finish permits with an identified and approved occupancy receive a Certificate of Occupancy or Temporary Certificate of Occupancy (Inspection Type Code 6690)
See the full Loveland inspection guide — scheduling & re-inspection fees →
Tips
- A Tenant Finish permit is always a SEPARATE permit from the core-and-shell new-building permit — even for a brand-new building, the shell and each tenant's build-out are permitted independently.
- If food will be prepared or served in the tenant space, a Food Service Establishment Application is required; if alcohol will be produced, an Alcohol Beverage Manufacturing Survey is required.
- Provide a layout showing the tenant space within the ENTIRE building (not just the suite being finished) and the maximum number of tenants, for the Addressing Division.
- All permit submittals are processed electronically by email to eplan-building@cityofloveland.org; the City's Accela online portal is stated as 'Coming in 2026.'
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Loveland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Loveland
Tenant Improvement / Interior Remodel Permit (Tenant Finish) in other cities
Compare tenant improvement / interior remodel permit (tenant finish) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Loveland project checklist
Describe your project once and get every permit, document, and fee it triggers in Loveland — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →