Required for re-roofing work within the joint Winter Park/Fraser/Granby jurisdiction. Governed by 2021 IBC/IRC ice-barrier, snow-shed-barrier, and drip-edge/underlayment amendments (Town Code 6-1-2/6-1-3). Winter Park is additionally subject to the new statewide 2025 Colorado Wildfire Resiliency Code (statutory compliance deadline July 1, 2026), but the Town had not published its own locally-amended Wildfire Resiliency Code section text as of this extraction — see note below.

Verified 2026-07-06 · Source

When you need this permit

  • An ice barrier of approved self-adhering polymer-modified bitumen sheet is required on all sloped roofs in lieu of normal underlayment, extending from the eaves to a point 6 feet inside the exterior wall line and 24 inches from the center line of all valleys, fully adhered to the substrate (roofs under 4:12 pitch require double underlayment with 100% base-layer coverage); detached accessory structures with no conditioned floor area are exempt (Town Code 6-1-2, Section 1507.1.1/1507.2.8.2; 6-1-3, Section R905.1.2)
  • Roofs must be designed with snow-shed barriers preventing accumulation from shedding onto exterior balconies, decks, exits, stairways, sidewalks, streets, alleys, or gas/electric utility meters — mechanical snow-retention devices must be secured to framing per manufacturer instructions, installed in at least two rows (first row within 24 inches of the eave), staggered at 24-inch centers, with continuous barriers at 48-inch centers (Town Code 6-1-2, Section 1503.6/1507.4/1507.5; 6-1-3, Section R905.1.3/R905.4.7/R905.10.5.1)
  • A drip edge is required at eave and rake edges of all pitched roofs, minimum 1-inch vertical leg, lapped not less than 1 inch, extended back on the deck not less than 2 inches, mechanically fastened at intervals not exceeding 18 inches (Town Code 6-1-2, Section 1507.2.8.3)
  • New roof coverings must not be installed over existing layers where the existing roof is water-soaked/deteriorated, is wood shake/slate/clay/cement/asbestos-cement tile, or already has more than one existing layer (Town Code 6-1-3, amending IRC R907.3)
  • On all metal roofs, vent pipes/stacks must terminate within 3 feet of the ridge or use a snow splitter/cricket (Town Code 6-1-2, Section 1503.5)
  • Changing roofing materials/coverings to something other than like materials may require a roof evaluation from a licensed Colorado design professional (Town Code 6-1-2, Section 1608.1)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based Table 1-11-2B)Town Code Title 1, Chapter 11
$54.00 minimum, scaling per valuation tiers
Plan Review Fee
65% of the permit fee
Reinspection Fee
$47.00/hour (1-hour minimum)

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Winter Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underlayment / Ice Barrier Inspection

    Ice barrier and drip-edge installation verified before roof covering is completed

  2. 2

    Final Building Inspection

See the full Winter Park inspection guide — scheduling & re-inspection fees →

Tips

  • Winter Park's ice-barrier rule (6 feet inside the exterior wall line, 24 inches from valley centerlines, full double-underlayment on low-slope roofs) is a mountain-specific requirement distinct from a stock IRC reading — confirm your roofer is quoting to this exact Town Code amendment.
  • Winter Park is subject to Colorado's new statewide Wildfire Resiliency Code (statutory compliance deadline July 1, 2026 for WUI-mapped jurisdictions), but this file does not carry Winter Park-specific numeric WUI requirements (e.g., a Class A roofing mandate) because the Town had not yet published its own local amendment text for that code as of this extraction — confirm current WUI-specific roofing requirements directly with the Building Department or the Colorado Division of Fire Prevention and Control before assuming a specific class rating applies.

Frequently asked questions

Winter Park requires a roofing permit (re-roof) for: An ice barrier of approved self-adhering polymer-modified bitumen sheet is required on all sloped roofs in lieu of normal underlayment, extending from the eaves to a point 6 feet inside the exterior wall line and 24 inches from the center line of all valleys, fully adhered to the substrate (roofs under 4:12 pitch require double underlayment with 100% base-layer coverage); detached accessory structures with no conditioned floor area are exempt (Town Code 6-1-2, Section 1507.1.1/1507.2.8.2; 6-1-3, Section R905.1.2); Roofs must be designed with snow-shed barriers preventing accumulation from shedding onto exterior balconies, decks, exits, stairways, sidewalks, streets, alleys, or gas/electric utility meters — mechanical snow-retention devices must be secured to framing per manufacturer instructions, installed in at least two rows (first row within 24 inches of the eave), staggered at 24-inch centers, with continuous barriers at 48-inch centers (Town Code 6-1-2, Section 1503.6/1507.4/1507.5; 6-1-3, Section R905.1.3/R905.4.7/R905.10.5.1); A drip edge is required at eave and rake edges of all pitched roofs, minimum 1-inch vertical leg, lapped not less than 1 inch, extended back on the deck not less than 2 inches, mechanically fastened at intervals not exceeding 18 inches (Town Code 6-1-2, Section 1507.2.8.3); New roof coverings must not be installed over existing layers where the existing roof is water-soaked/deteriorated, is wood shake/slate/clay/cement/asbestos-cement tile, or already has more than one existing layer (Town Code 6-1-3, amending IRC R907.3); On all metal roofs, vent pipes/stacks must terminate within 3 feet of the ridge or use a snow splitter/cricket (Town Code 6-1-2, Section 1503.5); Changing roofing materials/coverings to something other than like materials may require a roof evaluation from a licensed Colorado design professional (Town Code 6-1-2, Section 1608.1). If your project isn't listed, confirm with Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) at (970) 726-8081 before starting work.

In Winter Park, the published Building Permit Fee (same valuation-based Table 1-11-2B) is: $54.00 minimum, scaling per valuation tiers. Additional published fees: Plan Review Fee — 65% of the permit fee; Reinspection Fee — $47.00/hour (1-hour minimum). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Winter Park does not publish a plan-review timeline for this permit. Contact Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) at (970) 726-8081 for current turnaround.

You'll need: Building Permit Application (Towns of Winter Park, Fraser and Granby) — Roofing scope. See the required-documents checklist on this page for details on each.

Winter Park requires 2 inspection(s) for a roofing permit (re-roof), in order: Underlayment / Ice Barrier Inspection, Final Building Inspection. Schedule each through Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) ((970) 726-8081).

Apply through Winter Park/Fraser/Granby Building Department (Town of Winter Park Community Development Department — Building Division) at 50 Vasquez Road, Suite B, P.O. Box 3327, Winter Park, CO 80482. Phone: (970) 726-8081, email: permits@wpgov.com. Office hours: Monday-Friday, 8:00am-5:00pm. Official information: https://wpgov.com/our-government/departments/building/.

Yes — Town Code amendments to both the IBC and IRC require an ice barrier of self-adhering polymer-modified bitumen sheet on all sloped roofs, extending 6 feet inside the exterior wall line and 24 inches from valley centerlines, in lieu of normal underlayment.

Yes, per the statewide statutory requirement for jurisdictions with mapped Wildland-Urban Interface area (adoption required by April 1, 2026, full compliance by July 1, 2026), and the Town's own website carries an active notice about this code. However, the Town had not yet published its own locally-amended code text specific to this new code as of this extraction, so this file does not state Winter-Park-specific numeric WUI roofing requirements.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winter Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.