Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within the City of Pueblo, permitted the same way as any other electrical work under the 2023 NEC as amended by Pueblo City Code Title IV, Chapter 3, and issued by the Southern Colorado Building Department (SoCoBD). Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act) designates the City of Pueblo a 'covered municipality' (population over 10,000) and Pueblo County a 'covered county' (population over 20,000), requiring both to have adopted, by 12/31/2025, either the Colorado Energy Office's EV Charger Permitting Model Code, an equivalent locally-adopted objective standard, or a resolution affirming continued use of their existing permitting review process — this file could not independently confirm which of the three compliance options SoCoBD/the City selected.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the new/upgraded circuit and EVSE connection, the same as any other electrical work per Pueblo City Code Title IV, Chapter 3 (2023 NEC as amended)
  • Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System); GFCI protection applies per NEC 625 where the EVSE is cord-and-plug connected
  • Apply via the SoCoBD E-Gov Dashboard, email (permits@socobd.com), or fax, the same intake channels used for the file's general electrical-permit entry
  • If the charger install requires a panel/service upgrade, that scope is included in the same electrical permit application
  • No dedicated EV/EVSE fee line item exists in SoCoBD's Fee Table Table C (Residential Electrical Only Permits) -- confirmed by reading the full table, which lists exactly three fixed-fee residential electrical categories (Upgrade/Replace Service, Solar PV Systems, A/C Hook Up) and no others; a standalone EV charger circuit addition with no service upgrade does not match any of the three
  • Because a plain EV charger circuit addition is not one of Table C's fixed-fee categories, it falls back to SoCoBD's general valuation-based permit fee (Table B), applied to the contractor's declared job value for the electrical work -- the same mechanism Table C's own instructions specify for any permit type not itemized as a fixed fee
  • If the installation instead requires a service/panel upgrade to support the charger, it is billed under Table C's fixed 'Upgrade/Replace Service' fee ($55.13) instead of the valuation-based Table B calculation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

General valuation-based permit fee (Table B) — applies to a standalone EV charger circuit addition (not a Table C fixed-fee category)SoCoBD Fee Table (PDF), Table B — the full table was read directly; Table C (Residential Electrical Only Permits, fixed-fee) lists only three categories (Upgrade/Replace Service $55.13, Solar PV Systems $319.73, A/C Hook Up $44.10) and none covers a plain EV charger/EVSE circuit addition, so it defaults to Table B's declared-valuation sliding scale per the fee table's own stated logic. A typical Level 2 EVSE circuit install (materials + labor in the roughly $1,500-$3,000 range) would fall in the $501-$2,000 or $2,001-$25,000 bracket depending on declared job value. Verified directly against the current SoCoBD Fee Table PDF as of 2026-07-20.
Up to $500 valuation: $33.08 flat. $501-$2,000: $33.08 for the first $500 plus $2.21 per additional $100 or fraction thereof. $2,001-$25,000: $66.15 for the first $2,000 plus $9.92 per additional $1,000 or fraction thereof.
SoCoBD Residential Electrical Only Permit (Table C) — Upgrade/Replace Service (if the charger install requires a service/panel upgrade)SoCoBD Fee Table (PDF), Table C, Residential Electrical Only Permits — confirmed as one of only three fixed-fee residential electrical categories, applicable if the EVSE installation includes a service or panel upgrade rather than just a new branch circuit
$55.13 flat

Review timeline

Plan reviewTypical estimate — confirm current times with the Pueblo building department
~5–7 business days

How long did your EV Charging Station Permit (Electrical Permit) permit actually take in Pueblo?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In (if applicable)

    Wiring, box placement, and service connections before walls are closed

  2. 2

    Final

    EVSE breaker sizing, GFCI protection (where applicable), panel labeling, and NEC Article 625 compliance verified

See the full Pueblo inspection guide — scheduling & re-inspection fees →

Tips

  • SoCoBD's published Fee Table has no dedicated EV charger/EVSE line item -- confirmed against the full table, which lists only three fixed-fee residential electrical categories (Upgrade/Replace Service, Solar PV Systems, A/C Hook Up). A plain EVSE circuit addition instead falls back to the general valuation-based Table B fee schedule; only an installation that includes a service/panel upgrade would use the fixed $55.13 Upgrade/Replace Service fee.
  • Pueblo is a 'covered municipality' and Pueblo County a 'covered county' under Colorado's HB24-1173, which required an EV charger permitting process decision (model code adoption, an equivalent local standard, or continuing the existing process) by 12/31/2025 with a compliance report due to the Colorado Energy Office by 3/1/2026 — confirm with SoCoBD/the City of Pueblo which option was selected if an expedited/administrative review process is expected.
  • Electrical inspectors are available by phone (719-543-0002) 7:30-9:00 a.m. Monday-Friday, the same contact used for the file's general electrical-permit entry.

Frequently asked questions

Pueblo requires an ev charging station permit (electrical permit) for: Electrical permit required for the new/upgraded circuit and EVSE connection, the same as any other electrical work per Pueblo City Code Title IV, Chapter 3 (2023 NEC as amended); Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System); GFCI protection applies per NEC 625 where the EVSE is cord-and-plug connected; Apply via the SoCoBD E-Gov Dashboard, email (permits@socobd.com), or fax, the same intake channels used for the file's general electrical-permit entry; If the charger install requires a panel/service upgrade, that scope is included in the same electrical permit application; No dedicated EV/EVSE fee line item exists in SoCoBD's Fee Table Table C (Residential Electrical Only Permits) -- confirmed by reading the full table, which lists exactly three fixed-fee residential electrical categories (Upgrade/Replace Service, Solar PV Systems, A/C Hook Up) and no others; a standalone EV charger circuit addition with no service upgrade does not match any of the three; Because a plain EV charger circuit addition is not one of Table C's fixed-fee categories, it falls back to SoCoBD's general valuation-based permit fee (Table B), applied to the contractor's declared job value for the electrical work -- the same mechanism Table C's own instructions specify for any permit type not itemized as a fixed fee; If the installation instead requires a service/panel upgrade to support the charger, it is billed under Table C's fixed 'Upgrade/Replace Service' fee ($55.13) instead of the valuation-based Table B calculation. If your project isn't listed, confirm with Southern Colorado Building Department (SoCoBD) at 719-543-0002 before starting work.

In Pueblo, the published General valuation-based permit fee (Table B) — applies to a standalone EV charger circuit addition (not a Table C fixed-fee category) is: Up to $500 valuation: $33.08 flat. $501-$2,000: $33.08 for the first $500 plus $2.21 per additional $100 or fraction thereof. $2,001-$25,000: $66.15 for the first $2,000 plus $9.92 per additional $1,000 or fraction thereof.. Additional published fees: SoCoBD Residential Electrical Only Permit (Table C) — Upgrade/Replace Service (if the charger install requires a service/panel upgrade) — $55.13 flat. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an ev charging station permit (electrical permit) in Pueblo typically runs 5–7 business days. This is an estimate, not a published figure — confirm current review times with Southern Colorado Building Department (SoCoBD) at 719-543-0002.

You'll need: Contractor or Homeowner Permit Application. See the required-documents checklist on this page for details on each.

Pueblo requires 2 inspection(s) for an ev charging station permit (electrical permit), in order: Rough-In (if applicable), Final. Schedule each through Southern Colorado Building Department (SoCoBD) (719-543-0002).

Apply through Southern Colorado Building Department (SoCoBD) at 830 N Main St, Pueblo, CO 81003. Phone: 719-543-0002, email: permits@socobd.com. Office hours: Front counter open to the public 7:30 a.m.-4:30 p.m., Monday-Friday; online services available 24/7. Field inspectors are generally reachable in the office between 7:30 and 8:30 a.m. Homeowner/Contractor permit applications may also be emailed to permits@socobd.com or faxed to 719-543-0062.. Official information: https://www.socobd.com/.

Yes, an electrical permit through the Southern Colorado Building Department (SoCoBD), under the same 2023 NEC-based process as other electrical work. SoCoBD's Fee Table has no dedicated EV/EVSE line item -- its Table C (Residential Electrical Only Permits) lists only three fixed-fee categories (Upgrade/Replace Service $55.13, Solar PV Systems $319.73, A/C Hook Up $44.10). A standalone EVSE circuit addition instead falls back to the general valuation-based Table B fee schedule (e.g., $33.08 flat up to $500 declared job value, or $66.15 plus $9.92 per additional $1,000 for the $2,001-$25,000 bracket); only a service/panel upgrade would use the fixed Upgrade/Replace Service fee.

Yes. The City of Pueblo (population over 10,000) is a 'covered municipality' and Pueblo County (population over 20,000) is a 'covered county' under HB24-1173, both required to have adopted an EV charger permitting process decision by December 31, 2025. This file could not confirm which of the law's three compliance options (model code, equivalent local standard, or existing process) SoCoBD/the City selected.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pueblo building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.