Plumbing Permit — Unincorporated Teller County, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.tellercounty.gov/234/Building-Permit-Applications
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Unincorporated Teller County, Colorado
Required for installation, replacement, or repair of plumbing systems in unincorporated Teller County. Governed by the 2021 International Plumbing Code (IPC) as amended by the State of Colorado (Article V), directly enforced by Teller County.
Verified 2026-07-06 · Source
When you need this permit
- Plumbing permit required for fixture installation, water supply/drain-waste piping, and related plumbing work
- Governed by the 2021 IPC as amended by the State of Colorado, per Article V of the Teller County Building Code; uses the International Plumbing Code, not the Uniform Plumbing Code
- Where Article V (Plumbing Code) conflicts with Article III (IRC) or Article IV (IBC), Article V governs
- Contractor/examinee must hold a current Colorado state plumbing license (Master Plumber or equivalent), registered with the county at no additional annual county fee for the registration itself
- Teller County performs its own plumbing inspections and posts a Plumbing Contemporaneous Review procedure per HB19-1086
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Underground/Rough-In
Before concealment -- verify pipe slope, materials, and cleanouts
- 2
Final
Fixtures connected, backflow protection verified where applicable, no leaks
See the full Unincorporated Teller County inspection guide — scheduling & re-inspection fees →
Tips
- Backflow prevention assemblies must be tested by a certified backflow assembly tester at the time of installation, repair, or relocation, per Article V Section 312.10.1.
- Polybutylene pipe is prohibited under all references in Article V Section 605.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teller County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Teller County
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Teller County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Teller County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →