Commercial Building Permit in Unincorporated Teller County, Colorado

Required for new commercial building construction, additions to existing commercial buildings, and interior remodels in unincorporated Teller County. Reviewed against the 2021 International Building Code (IBC) as amended by the Teller County Building Code (Article IV), plus the 2018 IECC energy code (Article XII). Submitted via a dedicated Commercial Building Permit Application, entirely distinct from the county's residential application forms -- independently confirmed by downloading and reading both the application and its companion requirements handout directly, 2026-08-02.

Reviewed 2026-08-02 · Source

When you need this permit

  • Commercial Building Permit required for any new commercial building, addition to an existing commercial building, or interior remodel in unincorporated Teller County (application form's 'Type of Construction' checkboxes: New Build / Addition to existing building / Interior Remodel / Other); issued and inspected by the Teller County Building Division. Source: Commercial Building Permit Application (PDF)
  • Plans reviewed against the 2021 IBC (Article IV) as amended by the Teller County Building Code, plus the 2018 IECC (Article XII); the seal of a design professional licensed by the State of Colorado is required on each sheet of the commercial plans submittal, and electronic stamps must not lock the file from markups. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
  • Commercial building structures and all portions must be designed by a licensed Colorado engineer or architect -- explicitly including soils, footings, foundations, structural calculations/loads, energy, mechanical, plumbing, elevators, and electrical; electrical/mechanical/plumbing plans must bear the stamp and signature of the appropriate Colorado-licensed engineer except as provided in NEC Article 27. Source: Teller County Building Code (PDF), Article IV Section 1604.1
  • One complete plan set required, submitted electronically and NOT password-protected; incomplete submittals will not be accepted for review. Required items (per the Commercial Building - Required Documents checklist): site plan (by a professional surveyor/engineer/architect per Teller County Land Use Regulations Chapter 7, Table 7.1), driveway information, septic/wastewater information, well permit or water-district letter of service, site-specific soils report, foundation plans, elevation views, floor plans, cross-section details, floor framing plans, electrical/mechanical/plumbing plans, elevator plans (if applicable), roof framing plans, truss engineering, and an IECC energy-code compliance form. Source: Commercial Building Permit Application (PDF), page 2
  • All subcontractors must be individually listed by name on the application (Foundation, Excavator, Framing, HVAC, Electrical, Plumbing, Elevator, Roofing, Inside Gas, Outside Gas, Fire Sprinkler/Suppression, Fireplace/Woodstove) and must be licensed and insured per Article II of the Building Code. Source: Commercial Building Permit Application (PDF) Contractor
  • Change Orders (plan modifications submitted after the permit is issued) require a completed Change Order Request Form and carry a non-refundable $100 processing fee; additional inspections triggered by the change may require a separate inspection fee. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023)
  • Contractor must hold the applicable Teller County Building Contractor license for commercial work -- Building Contractor A (General, any type/size/occupancy) or Building Contractor B (General-Limited, excludes Type I/II fire-resistive construction and E/H/I-1/I-2/I-3 occupancies) for new commercial construction; Building Contractor B-1 (Remodel) for remodel/interior-remodel work, with similar occupancy and size exclusions -- in addition to any Colorado DORA trade licenses required for electrical/plumbing/mechanical subcontractors. Source: Teller County Building Code (PDF), Article II Sections 105.a, 105.b, 105.c Contractor
  • The Building Department will not issue a commercial permit on a property in violation of Teller County Land Use (zoning) Regulations, lacking demonstrated legal access, in violation of Sewage Disposal Regulations, or with an existing unresolved building-code violation. Source: Teller County Building Code (PDF), Article IV Section 105.8
  • Fire Department AHJ (Authority Having Jurisdiction) review and approval, and potentially other departments/entities (planning and zoning, floodplain, roads and bridges, environmental health, water, and wastewater), may require their own separate review in addition to the Building Division's plan review. Source: Commercial Building Permit Requirements handout

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Change Order (post-issuance plan modification) processing feePlus an additional inspection fee if the change order requires extra inspections. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023); consistent with the same $100 Change Order fee published county-wide in Teller County Building Code (PDF) Article III Section R108.2 (Fees).
$100.00 (non-refundable)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Unincorporated Teller County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour; verifies soils-report compliance and the engineer/architect-stamped foundation design required under Article IV Section 1604.1

  2. 2

    Framing

    Structural framing per approved 2021 IBC engineered plans; coordinated with rough-in inspections under the separate electrical, mechanical, and plumbing permits for the same project

  3. 3

    Final

    All work complete per approved plans; precedes issuance of the Certificate of Occupancy, at which point the contractor/subcontractor listing on file must be accurate per Article III Section R105.3.3

See the full Unincorporated Teller County inspection guide — scheduling & re-inspection fees →

Tips

  • Teller County maintains a fully separate 'Commercial Application Forms' table on its Building Permit Applications page (Commercial Building Permit Application + Commercial Building Permit Requirements handout), distinct from every residential application category -- confirmed by reading both documents directly, 2026-08-02.
  • There is NO separate Tenant Improvement or 'TI' permit application or category. Interior remodel / tenant-improvement work in an existing commercial building is submitted on this SAME Commercial Building Permit Application by checking 'Interior Remodel' under Type of Construction -- see the tenant-improvement-permit entry in this file for the confirmed-absence detail.
  • Fire Department AHJ review, plus planning/zoning, floodplain, roads and bridges, environmental health, water, and wastewater department review may run in parallel with the Building Division's own plan review -- budget time for these external reviews when scoping a project timeline, since none of them have a published turnaround either.

Frequently asked questions

Unincorporated Teller County requires a commercial building permit for: Commercial Building Permit required for any new commercial building, addition to an existing commercial building, or interior remodel in unincorporated Teller County (application form's 'Type of Construction' checkboxes: New Build / Addition to existing building / Interior Remodel / Other); issued and inspected by the Teller County Building Division. Source: Commercial Building Permit Application (PDF); Plans reviewed against the 2021 IBC (Article IV) as amended by the Teller County Building Code, plus the 2018 IECC (Article XII); the seal of a design professional licensed by the State of Colorado is required on each sheet of the commercial plans submittal, and electronic stamps must not lock the file from markups. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023); Commercial building structures and all portions must be designed by a licensed Colorado engineer or architect -- explicitly including soils, footings, foundations, structural calculations/loads, energy, mechanical, plumbing, elevators, and electrical; electrical/mechanical/plumbing plans must bear the stamp and signature of the appropriate Colorado-licensed engineer except as provided in NEC Article 27. Source: Teller County Building Code (PDF), Article IV Section 1604.1; One complete plan set required, submitted electronically and NOT password-protected; incomplete submittals will not be accepted for review. Required items (per the Commercial Building - Required Documents checklist): site plan (by a professional surveyor/engineer/architect per Teller County Land Use Regulations Chapter 7, Table 7.1), driveway information, septic/wastewater information, well permit or water-district letter of service, site-specific soils report, foundation plans, elevation views, floor plans, cross-section details, floor framing plans, electrical/mechanical/plumbing plans, elevator plans (if applicable), roof framing plans, truss engineering, and an IECC energy-code compliance form. Source: Commercial Building Permit Application (PDF), page 2; All subcontractors must be individually listed by name on the application (Foundation, Excavator, Framing, HVAC, Electrical, Plumbing, Elevator, Roofing, Inside Gas, Outside Gas, Fire Sprinkler/Suppression, Fireplace/Woodstove) and must be licensed and insured per Article II of the Building Code. Source: Commercial Building Permit Application (PDF); Change Orders (plan modifications submitted after the permit is issued) require a completed Change Order Request Form and carry a non-refundable $100 processing fee; additional inspections triggered by the change may require a separate inspection fee. Source: Commercial Building Permit Requirements handout (COM HAND 11/2023); Contractor must hold the applicable Teller County Building Contractor license for commercial work -- Building Contractor A (General, any type/size/occupancy) or Building Contractor B (General-Limited, excludes Type I/II fire-resistive construction and E/H/I-1/I-2/I-3 occupancies) for new commercial construction; Building Contractor B-1 (Remodel) for remodel/interior-remodel work, with similar occupancy and size exclusions -- in addition to any Colorado DORA trade licenses required for electrical/plumbing/mechanical subcontractors. Source: Teller County Building Code (PDF), Article II Sections 105.a, 105.b, 105.c; The Building Department will not issue a commercial permit on a property in violation of Teller County Land Use (zoning) Regulations, lacking demonstrated legal access, in violation of Sewage Disposal Regulations, or with an existing unresolved building-code violation. Source: Teller County Building Code (PDF), Article IV Section 105.8; Fire Department AHJ (Authority Having Jurisdiction) review and approval, and potentially other departments/entities (planning and zoning, floodplain, roads and bridges, environmental health, water, and wastewater), may require their own separate review in addition to the Building Division's plan review. Source: Commercial Building Permit Requirements handout. If your project isn't listed, confirm with Teller County Building Division (Community Development Department) at 719-687-3048 before starting work.

In Unincorporated Teller County, the published Change Order (post-issuance plan modification) processing fee is: $100.00 (non-refundable). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Teller County does not publish a plan-review timeline for this permit. Contact Teller County Building Division (Community Development Department) at 719-687-3048 for current turnaround.

You'll need: Commercial Building Permit Application (PDF). Depending on your project, Unincorporated Teller County may also ask for: Commercial Building Permit Requirements (PDF); Change Order Request Form. See the required-documents checklist on this page for details on each.

Unincorporated Teller County requires 3 inspection(s) for a commercial building permit, in order: Foundation/Footing, Framing, Final. Schedule each through Teller County Building Division (Community Development Department) (719-687-3048).

Apply through Teller County Building Division (Community Development Department) at 800 Research Drive, Suite 100-B, Tamarac Business Center, Woodland Park, CO 80863. Phone: 719-687-3048. Office hours: Monday through Friday (except holidays), 7:30 a.m. to 4:00 p.m., closed 11:30 a.m. to 12:30 p.m. for lunch. Building Inspectors answer Building Code questions by phone or in person 7:30-8:30 a.m. Monday-Friday at 719-687-3048; the Plans Examiner is available by appointment only, scheduled by calling 719-686-5405. Source: https://www.tellercounty.gov/Building-Division. Official information: https://www.tellercounty.gov/Building-Division.

Unincorporated Teller County, Colorado has adopted: AUTHORITY MODEL: The Teller County Building Division is responsible for regulating building activities to ensure residential and commercial structures comply with applicable codes, and 'issues Permits and Inspects all land/property located within unincorporated Teller County.' Woodland Park, Cripple Creek, and Victor all have their own separate Building Departments for issuing permits and performing inspections within their own municipal jurisdictions. This is a direct, affirmative statement of first-party permit issuance to unincorporated-area residents (not a records/coordination-only office), independently confirmed live 2026-07-06. Source: https://www.tellercounty.gov/Building-Division; Colorado has no statewide mandatory building code for most jurisdictions (home-rule/county-adoption authority under C.R.S. Title 30, Article 28); Teller County adopts and amends its own construction codes for the unincorporated area via the Teller County Building Code, administered by a Board of Review created under C.R.S. 30-28-206 and 207.; Teller County Building Code, as adopted by the Board of County Commissioners, effective 07/01/2023 (Resolution 06-22-2023 (21)), with subsequent amendment Resolution 11-09-2023 affecting contractor-license definitions and fees (Article II). This is the county's own current, in-force code compilation (58-page consolidated document), independently downloaded and read in full 2026-07-06. Source: Teller County Building Code (PDF), https://www.tellercounty.gov/DocumentCenter/View/242/Teller-County-Building-Code-PDF; Article III - 2021 International Residential Code (IRC), including Appendix Chapters AA, AB, AC, AG, AH, AJ, and AN, with numerous county-specific amendments (see localAmendments). Source: Teller County Building Code (PDF), Article III; Article IV - 2021 International Building Code (IBC), including Appendix Chapters G, H, and I, and the 'Building Safety Journal.' Source: Teller County Building Code (PDF), Article IV; Article V - 2021 International Plumbing Code (IPC) as amended by the State of Colorado, including Appendices B, E, and G. Colorado uses the International Plumbing Code (not the Uniform Plumbing Code) for this jurisdiction. Where Article V conflicts with Article III (IRC) or Article IV (IBC), Article V (the Plumbing Code) governs. Source: Teller County Building Code (PDF), Article V, Section 102.1; Article VI - 2021 International Mechanical Code (IMC), including Appendix Chapter A. Source: Teller County Building Code (PDF), Article VI; Article VII - 2021 International Fuel Gas Code (IFGC), including Appendix Chapter A. Source: Teller County Building Code (PDF), Article VII; Article VIII - Mobile/Factory Built/Manufactured Housing Code, with county-specific definitions of Manufactured Home, Factory Built Home (Modular/IRC Code Compliant Unit, per 8 CCR 1302-3), and Mobile Home; a building permit is required for the permanent foundation and all utility connections. Source: Teller County Building Code (PDF), Article VIII; Article IX - 2023 National Electrical Code (NEC/NFPA 70), adopted directly by Teller County (not merely deferred to a state board), governing all electrical alterations, repairs, replacements, equipment, appliances, fixtures, fittings, and appurtenances; where the 2021 IRC/IBC conflict with the NEC, the NEC (Article IX) prevails as the more restrictive code. Source: Teller County Building Code (PDF), Article IX; Article X - 2003 International Fire Code, adopted as the Teller County Fire Code for the unincorporated area by Teller County Ordinance #16. Source: Teller County Building Code (PDF), Article X; Article XII - 2018 International Energy Conservation Code (IECC), including the IECC Appendix for reference only. This is the county's own current adopted edition as of this review (2026-07-06) -- it is the 2018 edition, not the 2021 or 2024 edition. Colorado's HB22-1362 (statewide 'model' energy code adoption requirements for larger/home-rule jurisdictions with updates on a rolling schedule) was checked for applicability: Teller County's own code text does not reference HB22-1362 or a more recent IECC edition anywhere in the 58-page Building Code document, and no separate county page or resolution updating the energy code to a post-2018 edition was found. This is reported honestly as the genuinely current adopted edition rather than assumed to have been superseded. Source: Teller County Building Code (PDF), Article XII; Article XIII - Safety Code for Elevators and Escalators (ASME A17.1-2019, A17.3-2011, A18.1-2011, ASME QEI-2013, ANSI/ASSE A10.4-2007); all inspections performed by a State of Colorado-designated ANSI Certified Inspector with results submitted to the Building Department. Source: Teller County Building Code (PDF), Article XIII; Article XIV - 2021 International Existing Building Code (IEBC). Source: Teller County Building Code (PDF), Article XIV; Article XV - Uniform Code for the Abatement of Dangerous Buildings, 1997 edition. Source: Teller County Building Code (PDF), Article XV; Article XVII - Penalties: violations of the Teller County Building Code are unlawful and punishable per C.R.S. 30-28-209 and 30-28-210. Source: Teller County Building Code (PDF), Article XVII. Local amendments apply — see the Unincorporated Teller County overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teller County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Teller County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.