Single Family Dwelling (SFD) / New Residential Building Permit — Unincorporated Teller County, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.tellercounty.gov/234/Building-Permit-Applications
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Single Family Dwelling (SFD) / New Residential Building Permit in Unincorporated Teller County, Colorado
Required for construction of a new single-family dwelling in unincorporated Teller County, reviewed against the 2021 IRC as amended by the Teller County Building Code (Article III), plus the 2018 IECC (Article XII) and the county's own design criteria (57 psf ground snow load, 115 mph wind, Seismic Design Category B, 30-inch frost depth).
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for new single-family dwelling construction in unincorporated Teller County; issued and inspected directly by the Teller County Building Division
- Plans must comply with the 2021 IRC (Article III) plus the 2018 IECC (Article XII); must account for county design criteria: 57 psf ground snow load / 40 psf flat roof snow load (no ASCE 7 Chapter 7 reduction allowed), 115 mph ultimate wind speed with Exposure C, Seismic Design Category B, 30-inch minimum frost depth, and required ice-barrier underlayment
- Site-specific soils report and engineer/architect-stamped foundation design required for habitable structures per Article III Sections R401-R407
- Homeowner Builder permits limited to one new dwelling per owner in any 24-month period, and no more than two in any 10-year period, with primary-residency conditions on the second permit Owner-builder
- IECC (Energy Conservation) Application and a permanent Thermal Envelope Certificate required at final
- All contractors and sub-contractors working on the project must be licensed with Teller County (Board of Review-issued license) and insured per Article II Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing (Open Hole)
Before concrete pour; verify soils-report compliance, rebar, and 30-inch minimum frost depth
- 2
Framing
Structural framing per 2021 IRC and approved engineered plans
- 3
Final
All work complete per approved plans; Thermal Envelope Certificate posted
See the full Unincorporated Teller County inspection guide — scheduling & re-inspection fees →
Tips
- Homeowner Builder permits require ALL owners of record to sign the application; only one new-dwelling permit is allowed per owner in any 24-month period and no more than two in any 10-year period. Owner-builder
- A site-specific soils report with an open-hole inspection requirement remains valid for future projects on the same site; without that requirement, the report is valid for only one year after permit issuance.
- Property corners and setback points must be clearly marked and visible (even over snow/vegetation) and trash containment must be in place at the first inspection.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teller County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Teller County
Single Family Dwelling (SFD) / New Residential Building Permit in other cities
Compare single family dwelling (sfd) / new residential building permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Unincorporated Teller County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Teller County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →