Inspection sequence, scheduling, and re-inspection fees for building permits in Gilcrest, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
304 8th Street, Gilcrest, CO 80623
Phone
970-737-2426
Office hours
Monday-Friday 10:00 AM - 6:00 PM; Saturday 10:00 AM - 2:00 PM (Town Hall, 304 8th Street). Building inspection services are provided under contract by SAFEbuilt, Inc. (3755 Precision Drive, Suite 140, Loveland, CO 80538; main line 866-977-4111); inspection scheduling is handled via the inspection line printed on the issued permit card, not the Town's general office line.

Published scheduling rules

  • Because building inspection is contracted to SAFEbuilt, Inc., make sure to call the specific inspection line printed on your issued permit card (not the Town's general office line) to schedule any inspection. (Residential Building Permit (New Construction))
  • Gilcrest is a small statutory (non-home-rule) town of roughly 1,000-1,400 residents that nonetheless runs a genuine, independent building permit program — it is NOT folded into Weld County's unincorporated permitting process. Building inspection and plan review are contracted to SAFEbuilt, Inc., a private building-department-services firm also used by other Front Range Colorado jurisdictions; always call the inspection line printed on your specific permit card, not the Town's general office line, to schedule inspections. (General)

Inspection sequence

Applies to: Residential Addition / Home Improvement Permit

  1. 1

    Foundation & Foundation Wall

    After trenches excavated, reinforcement steel placed, forms erected, prior to concrete pour

  2. 2

    Underground

    Prior to covering piping or wiring and prior to placing concrete

  3. 3

    Rough Trade

    Plumbing, mechanical, and electrical rough-in complete prior to cover; may combine with rough framing

  4. 4

    Rough Frame

    After roof, framing, fire stopping, sheathing, draft stopping, bracing, and fasteners are in place

  5. 5

    Insulation

    After insulation placed, prior to covering walls

  6. 6

    Final

    After the addition is completed

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    After trenches excavated, reinforcement steel placed, forms erected, prior to concrete pour

  2. 2

    Underground

    Prior to covering any piping or wiring and prior to placing concrete

  3. 3

    Rough Trade (electrical/plumbing/mechanical)

    Performed once rough trade installation is complete, prior to covering; may be combined with rough framing

  4. 4

    Rough Framing

    After roof, framing, fire stopping, sheathing, draft stopping, bracing, and fasteners are in place

  5. 5

    Insulation

    After insulation is in place, prior to covering walls

  6. 6

    Final Inspection

    After construction is complete per approved plans

Applies to: Accessory Dwelling Unit / Accessory Structure Permit

  1. 1

    Footings

    After trenches excavated, forms erected, prior to placing concrete

  2. 2

    Slab

    Prior to placing concrete

  3. 3

    Frame/Rough Inspection

    After roof, framing, bracing, and fasteners are in place; includes utility inspections if installed

  4. 4

    Final Inspection

    After the structure is completed

Applies to: Deck / Patio Cover / Carport Permit

  1. 1

    Footings

    After holes dug, reinforcing steel placed/forms erected, prior to placing concrete

  2. 2

    Framing Inspection

    Roof, truss/ledger attachment, rafters/joists, beams, and hangers prior to any finished ceiling; if electric is installed, a rough electric inspection should be called concurrently

  3. 3

    Final

    After the patio cover/carport/deck is completed, including any final electrical

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment; wire splices and equipment grounding conductor make-up must be complete prior to this inspection

  2. 2

    Final Inspection

    All devices/fixtures installed, service equipment complete and labeled, wiring free from shorts/ground faults/open circuits with correct polarity

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    EVSE circuit wiring and disconnect installed before concealment; wire splices and equipment grounding conductor make-up must be complete prior to this inspection

  2. 2

    Final Inspection

    EVSE unit connections complete, service equipment labeled, wiring free from shorts/ground faults/open circuits with correct polarity

Applies to: Mechanical / HVAC Permit (Furnace, Air Conditioner)

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Re-Roof Permit

  1. 1

    Mid-Roof Inspection (if required)

    Required for some scopes at Building Department discretion; consult the department when the permit is issued

  2. 2

    Final Roof Inspection

    Required for all re-roof permits; the permit holder must call for this inspection

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement verified before energizing

  2. 2

    Final Inspection

    Racking/roof-penetration attachment, electrical connections, and interconnection point verified

Final inspection only: Demolition Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilcrest building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Gilcrest building permits

Get alerts for Gilcrest

We'll email you when Gilcrest's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.