EV Charger / EVSE Permit — Gilcrest, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://townofgilcrest.org/wp-content/uploads/2016-12-Resolution-Electrical-Permit.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Gilcrest, Colorado
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Gilcrest. As with all electrical work in this jurisdiction, the Town runs its own local electrical permitting program (via SAFEbuilt) rather than deferring to the Colorado State Electrical Board; fees are scaled at the maximum 15% surcharge above the State of Colorado's own fee schedule per CRS 12-23-117(3). No distinct EV-charger/EVSE fee line item is published anywhere in the Town's materials — a standalone EVSE circuit is billed under the same general Electrical Permit Fee schedule documented on this jurisdiction's electrical-permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Electrical work must be performed by, or under the supervision of, a licensed electrician listed on the permit application by name and Colorado DORA license number Contractor
- Per Resolution No. 2016-12 (implementing HB16-1073 / C.R.S. 12-23-116(10)): the Town (or SAFEbuilt on its behalf) verifies the listed electrician's active Colorado DORA license before the application will be processed
- If the electrician performing/overseeing the work changes during construction, the applicant must notify the Town of the new electrician's name/license number for re-verification
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
EVSE circuit wiring and disconnect installed before concealment; wire splices and equipment grounding conductor make-up must be complete prior to this inspection
- 2
Final Inspection
EVSE unit connections complete, service equipment labeled, wiring free from shorts/ground faults/open circuits with correct polarity
See the full Gilcrest inspection guide — scheduling & re-inspection fees →
Tips
- Gilcrest runs its own electrical permitting program (through SAFEbuilt) for EV chargers just as it does for all other electrical work — it does not defer electrical permits to the Colorado State Electrical Board.
- Have your electrician's Colorado DORA license number ready at time of application — the Town will not process the application until the license is verified active online, per Resolution 2016-12.
- No EV-specific fee is published — the Town's electrical fee is anchored to the state's own fee table plus the maximum 15% local surcharge CRS 12-23-117(3) allows; confirm the current state base rate with the Building Department or SAFEbuilt before budgeting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gilcrest building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gilcrest
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Gilcrest project checklist
Describe your project once and get every permit, document, and fee it triggers in Gilcrest — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →