Skip to main content
PermitBase

Sign Permit in Greeley, Colorado

Greeley regulates signage under Municipal Code Title 24 (Development Code), Chapter 17 (Signs). All signs require a permit unless specifically exempted; it is unlawful to erect, place, enlarge, alter, repair, or convert a sign in the city except in accordance with Chapter 17's provisions. Sign permits and planner assistance are available at 1100 10th Street, Monday through Friday, 8:00 a.m. to 5:00 p.m.; appointments can be scheduled by calling 970-350-9780.

Reviewed 2026-08-13 · Source

When you need this permit

  • All signs require a permit unless specifically exempted under Municipal Code Title 24, Chapter 17 (Signs)
  • It is unlawful for any person to erect, place, enlarge, alter, repair, or convert a sign in the city except in accordance with Chapter 17's provisions
  • Certain signs listed in the Code do not require a sign permit if the sign complies with the applicable exemption provisions
  • Sign permits and planner assistance are available at 1100 10th Street, Monday-Friday 8:00 a.m.-5:00 p.m.; call 970-350-9780 to schedule an appointment
  • No numeric sign-permit fee schedule or review-timeline figure was found published specific to signs — confirm with Planning staff (970-350-9780)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit FeeContact Greeley Planning staff (970-350-9780) for a current fee quote
Not published as a numeric figure specific to signs

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Greeley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Greeley inspection guide — scheduling & re-inspection fees →

    Tips

    • Sign permits in Greeley are handled by Planning staff, not the Fire Prevention Bureau or general Building Permits and Inspections division — call 970-350-9780 to schedule an appointment rather than going through the Building Division.

    Frequently asked questions

    Yes, for most signs — all signs require a permit unless specifically exempted under Municipal Code Title 24, Chapter 17. It is unlawful to erect, place, enlarge, alter, repair, or convert a sign except in accordance with that chapter.

    In Greeley, the published Sign Permit Fee is: Not published as a numeric figure specific to signs. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Greeley does not publish a plan-review timeline for this permit. Contact City of Greeley Building Inspection (Community Development) at (970) 350-9830 for current turnaround.

    You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Greeley Building Inspection (Community Development) at 1100 10th Street, Greeley, CO 80631. Phone: (970) 350-9830, email: Building.Inspection@greeleygov.com. Office hours: Monday - Friday, 7:00 AM - 5:00 PM; appointments strongly recommended (Building Inspections, 1100 10th Street, Greeley, CO 80631). Official information: https://greeleyco.gov/business/construction-and-growth/building-permits-and-inspections.

    Greeley, Colorado has adopted: Colorado is a home-rule state: there is no single mandatory statewide building code edition — each municipality adopts and amends its own codes. The only statewide floors are the building energy code (HB22-1362, effective 7/1/2023, requiring local governments that adopt an energy code to meet or exceed a specified electric- and solar-ready code baseline) and specific state statutes (e.g., ADU enabling legislation). Confirm your city's own adopted edition; this file documents Greeley's own program, verified directly from the Greeley Municipal Code (Title 22) via library.municode.com/co/greeley.; City of Greeley runs its own Building Inspection Division (part of Community Development) and administers its own permitting within Greeley city limits — it is not a Weld County program. Source: City of Greeley Building Permits and Inspections page.; 2021 International Building Code (IBC) — adopted by reference, Greeley Municipal Code Sec. 22-31, effective 1-1-2023 per Ord. No. 25, 2022; 2021 International Residential Code (IRC) — adopted by reference, Sec. 22-76, effective 1-1-2023 per Ord. No. 25, 2022; governs detached one- and two-family dwellings and townhouses up to 3 stories; 2021 International Existing Building Code (IEBC) — adopted by reference, Sec. 22-236, effective 1-1-2023; 2021 International Property Maintenance Code (IPMC) — adopted by reference, Sec. 22-192, effective 1-1-2023; 2021 International Mechanical Code (IMC) — adopted by reference, Sec. 22-161, effective 1-1-2023; 2021 International Plumbing Code (IPC) — adopted by reference, Sec. 22-306, effective 1-1-2023 (Greeley uses the International Plumbing Code, NOT the Uniform Plumbing Code); 2021 International Fuel Gas Code (IFGC) — adopted by reference, Sec. 22-347, effective 1-1-2023; 2021 International Energy Conservation Code (IECC) — adopted by reference, Sec. 22-286, effective 1-1-2023; 2021 International Fire Code (IFC) — adopted by reference, Sec. 22-454, effective 1-1-2023, with local amendments including NFPA 855-20 (stationary energy storage systems) and added Appendices B and C (fire-flow requirements, hydrant locations); 2023 National Electrical Code (NEC/NFPA 70) — adopted by reference, Sec. 22-377, per Ord. No. 37, 2023 (9-19-2023); superseded the previously adopted 2020 NEC; 2017 ICC A117.1 Accessibility Code — referenced on the City's Building Inspection Resources / Code Information page; All codes amended per Greeley Municipal Code Title 22 (Buildings and Construction), Chapters 2-12; consolidated under Ord. No. 25, 2022 (adoptions effective 1-1-2023) with the electrical code separately updated to the 2023 NEC by Ord. No. 37, 2023; Source: Greeley Municipal Code, Title 22, via library.municode.com/co/greeley (Chapters 2-12), cross-verified against the City's Building Permits and Inspections page 'Code Information' list. Local amendments apply — see the Greeley overview page for the full list.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-08-13.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Greeley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.