Required for installation of rooftop or ground-mount solar photovoltaic systems within Greeley city limits. No standalone solar/photovoltaic fee line, application, or checklist is published by the City; a solar installation is billed as a standard Building Permit (structural/racking) plus an Electrical Permit (wiring/interconnection), both using the same valuation-based Building Permit Fee Schedule (Table 1-A) under Greeley Municipal Code Sec. 22-33/22-424(7). Governed by the 2021 IBC/IRC and 2023 NEC as locally adopted.
Verified 2026-07-20 · Source
When you need this permit
- Building Permit Application (structural/racking scope) plus Electrical Permit Application (wiring/interconnection scope), both submitted through eTRAKiT (trakit.greeleygov.com/etrakit/)
- Electrical permit fee uses the same valuation-based Building Permit Fee Schedule as building permits, per Greeley Municipal Code Sec. 22-424(7) — Greeley does not publish a separate electrical-only fee table
- Colorado's statewide solar-permit fee cap (C.R.S. 24-48.5-113, enacted via HB21-1284) limits the aggregate building-permit-related fees a Colorado local government may charge for a residential solar installation to $500 (and $1,000 for commercial), regardless of the valuation-based table result
- Colorado HB25-1096 (Automated Permits for Clean Energy Technology) required municipalities with population over 5,000 — which includes Greeley (population approximately 110,000) — to adopt an automated residential solar permitting platform (e.g., SolarAPP+ or equivalent) capable of processing at least 75% of applications, by July 1, 2026; no City-published confirmation that Greeley itself has adopted SolarAPP+ or an equivalent platform for its own building-permit review was found as of the last verification (DORA's own SolarAPP+ program, announced October 2025, covers electrical plan review for 200+ Colorado jurisdictions statewide but is administered by the state electrical board, separate from Greeley's locally-run building/electrical permitting)
- Governed by the 2021 IBC/IRC (Greeley Municipal Code Sec. 22-76) and 2023 NEC (Sec. 22-377) as locally adopted
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before energizing
- 2
Final Inspection
Racking/roof-penetration attachment, electrical connections, and interconnection point verified
See the full Greeley inspection guide — scheduling & re-inspection fees →
Tips
- Greeley has no dedicated solar permit application, checklist, or fee line — a solar PV installation is processed as a standard Building Permit (structural) plus Electrical Permit (wiring), both billed off the same general valuation-based fee table.
- Colorado's statewide solar-fee cap (C.R.S. 24-48.5-113) limits total local government fees for a residential system to $500 — if Greeley's valuation-based calculation would exceed that, the statutory cap controls.
- As a city over 5,000 population, Greeley is covered by Colorado HB25-1096's July 1, 2026 automated-permitting mandate — ask Building Inspection directly whether an instant/automated review pathway (e.g., SolarAPP+) is now available for the building-permit portion, since the City has not published this online as of the last verification.
- Colorado's statewide solar-permit fee cap (C.R.S. 24-48.5-113, HB21-1284) — the $500 residential / $1,000 commercial aggregate fee cap, extended through December 31, 2029 per the enacted statute — is a real, currently-in-force governing dollar ceiling regardless of the local valuation-table result. This statutory cap plus the City's Building Permit Fee Schedule valuation table together constitute the citable governing fee mechanism.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Greeley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Greeley's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Greeley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Greeley lands. Privacy.
Other permits in Greeley
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Greeley project checklist
Describe your project once and get every permit, document, and fee it triggers in Greeley — in one checklist. Free, for any city and any number of projects.
Get started →