Skip to main content
PermitBase

EV Charger / Electric Vehicle Charging Station Permit in Greeley, Colorado

Installing a Level 2 (240V) EV charger circuit in Greeley requires a standard City of Greeley Electrical Permit, governed by Greeley Municipal Code Sec. 22-424(7). No dedicated EV-charger/EVSE fee line, application, or checklist is published -- an EV charger circuit is billed under the same valuation-based Building Permit Fee Schedule (Table 1-A) used for all electrical work, per the identical mechanism already documented in this corpus's electrical-permit and solar-pv-permit entries for Greeley. Unlike solar, EV chargers are NOT covered by Colorado's statewide $500 solar-permit fee cap (C.R.S. 24-48.5-113), which by its own terms applies only to solar energy systems.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit Application submitted through eTRAKiT (trakit.greeleygov.com/etrakit/) for the EV charger circuit
  • Fee is calculated from the total declared valuation of the electrical work against the same Table 1-A schedule used for building permits, per Greeley Municipal Code Sec. 22-424(7) — Greeley does not publish a separate electrical-only fee table
  • A Homeowner Affidavit may substitute for a licensed electrician if the homeowner personally performs the work on their own residence Owner-builderContractor
  • Governed by the 2023 NEC (NFPA 70) as locally adopted (Greeley Municipal Code Sec. 22-377), including NEC Article 625 (Electric Vehicle Power Transfer System)
  • No statutory fee cap applies to EV chargers the way C.R.S. 24-48.5-113 caps solar permit fees at $500 -- that statute is scoped specifically to solar energy systems and does not extend to EV charging equipment

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee — valuation-based (same schedule as building permits)Greeley Municipal Code Sec. 22-424(7) adopts the Sec. 22-33 fee schedule for all electrical permits, including EV chargers; no separate electrical-only or EV-specific fee table is published, and no statutory fee cap applies (unlike solar's C.R.S. 24-48.5-113 $500 cap).
$23.50 minimum ($1-$500 valuation), scaling per the City's 2024 Building Permit Fee Schedule Table 1-A
Building Permit Fee — valuation $2,001 to $25,000 (typical range if bundled with a service/panel upgrade)City of Greeley 2024 Building Permit Fee Schedule (Table 1-A) — applies if the EV charger installation is bundled with other valuation-triggering work
$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof
Working without permit penaltyGreeley Municipal Code Sec. 22-424(3); exception for demonstrated emergency electrical work
200% of the regular permit fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Greeley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    City inspector verifies the new circuit, breaker sizing, and disconnect (if required) before the charger is energized

See the full Greeley inspection guide — scheduling & re-inspection fees →

Tips

  • Greeley has no dedicated EV-charger permit application, checklist, or fee line -- an EV charger circuit is processed as a standard Electrical Permit, billed off the same general valuation-based fee table used for any other electrical work.
  • Unlike solar, which is capped statewide at $500 in local fees (C.R.S. 24-48.5-113), EV charger permits have no statutory fee cap in Colorado -- the full valuation-based fee schedule applies.
  • DORA's separate statewide SolarAPP+ program (covering electrical plan review for 200+ Colorado jurisdictions including Greeley) is limited to residential solar and storage systems -- it does not extend to EV charger permitting.

Frequently asked questions

Greeley requires an ev charger / electric vehicle charging station permit for: Electrical Permit Application submitted through eTRAKiT (trakit.greeleygov.com/etrakit/) for the EV charger circuit; Fee is calculated from the total declared valuation of the electrical work against the same Table 1-A schedule used for building permits, per Greeley Municipal Code Sec. 22-424(7) — Greeley does not publish a separate electrical-only fee table; A Homeowner Affidavit may substitute for a licensed electrician if the homeowner personally performs the work on their own residence; Governed by the 2023 NEC (NFPA 70) as locally adopted (Greeley Municipal Code Sec. 22-377), including NEC Article 625 (Electric Vehicle Power Transfer System); No statutory fee cap applies to EV chargers the way C.R.S. 24-48.5-113 caps solar permit fees at $500 -- that statute is scoped specifically to solar energy systems and does not extend to EV charging equipment. If your project isn't listed, confirm with City of Greeley Building Inspection (Community Development) at (970) 350-9830 before starting work.

No. Colorado's statewide fee cap for residential solar installations (C.R.S. 24-48.5-113, $500) is scoped specifically to solar energy systems and does not extend to EV charging equipment. EV charger permits are billed under the full valuation-based fee schedule with no statutory cap.

Greeley does not publish a plan-review timeline for this permit. Contact City of Greeley Building Inspection (Community Development) at (970) 350-9830 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Greeley requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Electrical Inspection. Schedule each through City of Greeley Building Inspection (Community Development) ((970) 350-9830).

Apply through City of Greeley Building Inspection (Community Development) at 1100 10th Street, Greeley, CO 80631. Phone: (970) 350-9830, email: Building.Inspection@greeleygov.com. Office hours: Monday - Friday, 7:00 AM - 5:00 PM; appointments strongly recommended (Building Inspections, 1100 10th Street, Greeley, CO 80631). Official information: https://greeleyco.gov/business/construction-and-growth/building-permits-and-inspections.

Greeley, Colorado has adopted: Colorado is a home-rule state: there is no single mandatory statewide building code edition — each municipality adopts and amends its own codes. The only statewide floors are the building energy code (HB22-1362, effective 7/1/2023, requiring local governments that adopt an energy code to meet or exceed a specified electric- and solar-ready code baseline) and specific state statutes (e.g., ADU enabling legislation). Confirm your city's own adopted edition; this file documents Greeley's own program, verified directly from the Greeley Municipal Code (Title 22) via library.municode.com/co/greeley.; City of Greeley runs its own Building Inspection Division (part of Community Development) and administers its own permitting within Greeley city limits — it is not a Weld County program. Source: City of Greeley Building Permits and Inspections page.; 2021 International Building Code (IBC) — adopted by reference, Greeley Municipal Code Sec. 22-31, effective 1-1-2023 per Ord. No. 25, 2022; 2021 International Residential Code (IRC) — adopted by reference, Sec. 22-76, effective 1-1-2023 per Ord. No. 25, 2022; governs detached one- and two-family dwellings and townhouses up to 3 stories; 2021 International Existing Building Code (IEBC) — adopted by reference, Sec. 22-236, effective 1-1-2023; 2021 International Property Maintenance Code (IPMC) — adopted by reference, Sec. 22-192, effective 1-1-2023; 2021 International Mechanical Code (IMC) — adopted by reference, Sec. 22-161, effective 1-1-2023; 2021 International Plumbing Code (IPC) — adopted by reference, Sec. 22-306, effective 1-1-2023 (Greeley uses the International Plumbing Code, NOT the Uniform Plumbing Code); 2021 International Fuel Gas Code (IFGC) — adopted by reference, Sec. 22-347, effective 1-1-2023; 2021 International Energy Conservation Code (IECC) — adopted by reference, Sec. 22-286, effective 1-1-2023; 2021 International Fire Code (IFC) — adopted by reference, Sec. 22-454, effective 1-1-2023, with local amendments including NFPA 855-20 (stationary energy storage systems) and added Appendices B and C (fire-flow requirements, hydrant locations); 2023 National Electrical Code (NEC/NFPA 70) — adopted by reference, Sec. 22-377, per Ord. No. 37, 2023 (9-19-2023); superseded the previously adopted 2020 NEC; 2017 ICC A117.1 Accessibility Code — referenced on the City's Building Inspection Resources / Code Information page; All codes amended per Greeley Municipal Code Title 22 (Buildings and Construction), Chapters 2-12; consolidated under Ord. No. 25, 2022 (adoptions effective 1-1-2023) with the electrical code separately updated to the 2023 NEC by Ord. No. 37, 2023; Source: Greeley Municipal Code, Title 22, via library.municode.com/co/greeley (Chapters 2-12), cross-verified against the City's Building Permits and Inspections page 'Code Information' list. Local amendments apply — see the Greeley overview page for the full list.

No. The City has no dedicated EV-charger/EVSE permit form, checklist, or fee line. An EV charger circuit requires a standard Electrical Permit, submitted via eTRAKiT and billed under the same valuation-based Building Permit Fee Schedule used for any other electrical work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Greeley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.