EV Charger / Electric Vehicle Charging Station Permit in Greeley, Colorado
Installing a Level 2 (240V) EV charger circuit in Greeley requires a standard City of Greeley Electrical Permit, governed by Greeley Municipal Code Sec. 22-424(7). No dedicated EV-charger/EVSE fee line, application, or checklist is published -- an EV charger circuit is billed under the same valuation-based Building Permit Fee Schedule (Table 1-A) used for all electrical work, per the identical mechanism already documented in this corpus's electrical-permit and solar-pv-permit entries for Greeley. Unlike solar, EV chargers are NOT covered by Colorado's statewide $500 solar-permit fee cap (C.R.S. 24-48.5-113), which by its own terms applies only to solar energy systems.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit Application submitted through eTRAKiT (trakit.greeleygov.com/etrakit/) for the EV charger circuit
- Fee is calculated from the total declared valuation of the electrical work against the same Table 1-A schedule used for building permits, per Greeley Municipal Code Sec. 22-424(7) — Greeley does not publish a separate electrical-only fee table
- A Homeowner Affidavit may substitute for a licensed electrician if the homeowner personally performs the work on their own residence Owner-builderContractor
- Governed by the 2023 NEC (NFPA 70) as locally adopted (Greeley Municipal Code Sec. 22-377), including NEC Article 625 (Electric Vehicle Power Transfer System)
- No statutory fee cap applies to EV chargers the way C.R.S. 24-48.5-113 caps solar permit fees at $500 -- that statute is scoped specifically to solar energy systems and does not extend to EV charging equipment
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
City inspector verifies the new circuit, breaker sizing, and disconnect (if required) before the charger is energized
See the full Greeley inspection guide — scheduling & re-inspection fees →
Tips
- Greeley has no dedicated EV-charger permit application, checklist, or fee line -- an EV charger circuit is processed as a standard Electrical Permit, billed off the same general valuation-based fee table used for any other electrical work.
- Unlike solar, which is capped statewide at $500 in local fees (C.R.S. 24-48.5-113), EV charger permits have no statutory fee cap in Colorado -- the full valuation-based fee schedule applies.
- DORA's separate statewide SolarAPP+ program (covering electrical plan review for 200+ Colorado jurisdictions including Greeley) is limited to residential solar and storage systems -- it does not extend to EV charger permitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Greeley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Greeley
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Greeley project checklist
Describe your project once and get every permit, document, and fee it triggers in Greeley — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.