Skip to main content
PermitBase

Fire Sprinkler / Fire Alarm System Permit in Keenesburg, Colorado

Fire protection for Keenesburg is provided by the Southeast Weld Fire Protection District (SEWFPD, 95 W. Broadway Avenue, Keenesburg, CO 80643, non-emergency 303-732-4203), which publishes a dedicated 'Application for Plan Review' form (Fire Marshal Services) with explicit checkboxes for Fire Alarm System and Fire Sprinkler System reviews, alongside Site Development, Building and Floor Plans, and Kitchen Hood System reviews. The Town's own Fire Department page confirms: 'All Commercial New Builds, Alterations/Remodels and Additions must be approved by the Fire District prior to issuing a Building Permit.'

Verified 2026-08-14 · Source

When you need this permit

  • Confirmed via the Town's own Fire Department page: 'All Commercial New Builds, Alterations/Remodels and Additions must be approved by the Fire District prior to issuing a Building Permit'
  • SEWFPD's own 'Application for Plan Review' form includes dedicated checkboxes for 'Fire Alarm System' and 'Fire Sprinkler System' plan review, distinct from Site Development, Building and Floor Plans, and Kitchen Hood System reviews
  • Application must identify the Owner, General Contractor, and Fire Systems Contractor, including a Building Permit number if one has been issued
  • Fee is not itemized on the plan review application itself; SEWFPD also publishes a separate Impact Fee Form for new construction
  • Contact SEWFPD (720-250-7254, weven@3efms.com) or the Town Building Department (303-732-4281 ext. 2) for current submittal requirements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Sprinkler/Alarm Plan Review & Permit FeeSEWFPD also publishes a separate Impact Fee Form and a 'Required Documents and Forms for Construction' PDF; specific dollar figures were not extracted from those documents during this review. Contact SEWFPD (720-250-7254, weven@3efms.com) for a current fee quote.
Not itemized on the Application for Plan Review form itself

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler / Fire Alarm System Permit permit actually take in Keenesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Keenesburg inspection guide — scheduling & re-inspection fees →

    Tips

    • Keenesburg's own Fire Department page is explicit that commercial fire-district approval must happen BEFORE the Town issues a Building Permit for new builds, alterations/remodels, and additions — sequence your fire sprinkler/alarm plan review with SEWFPD early, not after the Building Permit is already in hand.
    • SEWFPD's Application for Plan Review form separately checkboxes Fire Alarm System vs. Fire Sprinkler System vs. Kitchen Hood System — use the correct box(es) for your project's scope.

    Frequently asked questions

    Keenesburg requires a fire sprinkler / fire alarm system permit for: Confirmed via the Town's own Fire Department page: 'All Commercial New Builds, Alterations/Remodels and Additions must be approved by the Fire District prior to issuing a Building Permit'; SEWFPD's own 'Application for Plan Review' form includes dedicated checkboxes for 'Fire Alarm System' and 'Fire Sprinkler System' plan review, distinct from Site Development, Building and Floor Plans, and Kitchen Hood System reviews; Application must identify the Owner, General Contractor, and Fire Systems Contractor, including a Building Permit number if one has been issued; Fee is not itemized on the plan review application itself; SEWFPD also publishes a separate Impact Fee Form for new construction; Contact SEWFPD (720-250-7254, weven@3efms.com) or the Town Building Department (303-732-4281 ext. 2) for current submittal requirements. If your project isn't listed, confirm with Town of Keenesburg Building Department at 303-732-4281 ext. 2 before starting work.

    In Keenesburg, the published Fire Sprinkler/Alarm Plan Review & Permit Fee is: Not itemized on the Application for Plan Review form itself. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Keenesburg does not publish a plan-review timeline for this permit. Contact Town of Keenesburg Building Department at 303-732-4281 ext. 2 for current turnaround.

    You'll need: Southeast Weld Fire Protection District — Application for Plan Review. See the required-documents checklist on this page for details on each.

    Apply through Town of Keenesburg Building Department at 91 W. Broadway Avenue, Keenesburg, CO 80643. Phone: 303-732-4281 ext. 2, email: stevejones@caa.inc. Office hours: As of 6/11/2026, permits are processed and issued on Wednesday and Friday only. Building Official Steve Jones is a contract official with Charles Abbott Associates (CAA), a third-party municipal building-department staffing firm; direct line 720-810-5751. Inspections are usually performed the next business day if the inspection request is submitted by 3:00 p.m., via the Town's online Google Forms-based 'Request an Inspection' portal.. Official information: https://www.townofkeenesburg.com/departments/building_department/index.php.

    Keenesburg, Colorado has adopted: 2018 International Building Code (IBC) — Town of Keenesburg Building Department page ('Keenesburg Adopted Building Codes' list); 2018 International Residential Code (IRC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code; 2018 International Swimming Pool and Spa Code; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities; 2023 National Electrical Code (NEC) — the only code on the list not on the 2018 cycle; the live Building Department webpage lists 2023 NEC specifically, though the Town's own 'Solar Submittal Requirements' PDF (a separate, older document) still references 2020 NEC in its REFERENCE section — the actively-maintained Building Department webpage's 2023 NEC citation is treated as current per this corpus's policy of preferring the department's live page over a static, undated-revision handout.; Note on HB22-1362 (Colorado's statewide 2021 IECC energy-code floor, phased in via a jurisdiction's next code-adoption cycle rather than a blanket calendar deadline): Keenesburg's actively-maintained Building Department page still lists 2018 IECC as the adopted energy code, with no visible update to 2021 IECC or later. HB22-1362 requires jurisdictions to adopt a qualifying energy code (2021 IECC or equivalent, with electric/EV-ready/solar-ready provisions) only when the jurisdiction next updates ANY of its building codes — it does not retroactively force an update on a fixed date for towns that have not re-adopted since the law passed. No Town of Keenesburg ordinance updating its I-codes past the 2018 cycle (except the NEC swap to 2023) was found on the Town's Ordinances or Resolutions pages after direct review, so 2018 IECC is reported here as the honestly-current adopted code, with this note flagging the HB22-1362 gap rather than assuming compliance or silently upgrading the figure.. Local amendments apply — see the Keenesburg overview page for the full list.

    The Southeast Weld Fire Protection District (SEWFPD, 95 W. Broadway Avenue, Keenesburg, non-emergency 303-732-4203), which uses a dedicated Application for Plan Review form with explicit Fire Alarm System and Fire Sprinkler System checkboxes. The Town's own Fire Department page confirms commercial projects need Fire District approval before a Building Permit is issued. Contact SEWFPD at 720-250-7254 or weven@3efms.com.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Keenesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.