Skip to main content
PermitBase

New Residential Home Building Permit in Keenesburg, Colorado

Required for construction of new single-family homes in the Town of Keenesburg. Requires full plan review under the New Residential Home Plan Review Checklist, reviewed under the locally-adopted 2018 IRC/IBC and the Town's published Design Criteria (30 PSF ground snow load, 115 mph ultimate wind speed, 30-inch frost depth, ice barrier underlayment required).

Verified 2026-07-06 · Source

When you need this permit

  • Geotech / Soils Report required for site assessment
  • Plot Plan showing property boundary lines and dimensions, distances between structures and property lines, north arrow/scale, property address, lot dimensions, and legal description
  • Architectural Plans designed and stamped by a Colorado Licensed Design Professional: floor plans, roof plans with ventilation calculations, elevation/section views with insulation values, fire-rating details, electrical layouts, mechanical systems documentation
  • Structural Plans stamped by a Colorado Licensed Engineer: foundation details, framing layouts, shear walls, hold-downs, design load information
  • Energy Code Compliance: ResCheck completion or energy rating report, plus Manual J, D & S calculations
  • Plans must meet the Town's Design Criteria: 30 PSF ground snow load, 115 mph ultimate / 90 mph nominal wind speed (Exposure C), Seismic Design Category B, 30-inch minimum frost line depth, ice barrier underlayment required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1 to $500Town of Keenesburg Building Permit Fee Schedule, Exhibit A, Table 1
$33.80
Building Permit Fee — valuation $501 to $2,000
$33.80 for the first $500, plus $3.44 for each additional $100 or fraction thereof, to and including $2,000
Building Permit Fee — valuation $2,001 to $25,000
$85.40 for the first $2,000, plus $15.77 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit Fee — valuation $25,001 to $50,000
$448.11 for the first $25,000, plus $11.49 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit Fee — valuation $50,001 to $100,000
$735.36 for the first $50,000, plus $7.88 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit Fee — valuation $100,001 to $500,000
$1,129.36 for the first $100,000, plus $6.30 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit Fee — valuation $500,001 to $1,000,000
$3,649.36 for the first $500,000, plus $5.35 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit Fee — valuation $1,000,001 and up
$6,324.36 for the first $1,000,000, plus $4.11 for each additional $1,000 or fraction thereof
Initial Plan Review Fee
65% of total permit fees
Use Tax
3% of gross purchase price of building materials
Parks Impact FeeEffective 1-1-2022, Municipal Code Sec. 4-7-40
$2,643 per lot (Single Family Residential)
Roadway Street Impact FeeEffective 1-1-2023
$4,727 per lot (Single Family Residential)
Town Hall Impact FeeEffective 1-1-2022
$1,844 per lot (Single Family Residential)
Police Impact FeeEffective 1-1-2022
$233 per lot (Single Family Residential)
Fair Contributions for Public School Sites Impact FeeEffective 6/10/2024, Ordinance 2024-02
$2,959.96 per unit (Single Family Dwellings)
Emergency Services Impact FeeEffective 6-22-2020
$1,835.00 per unit (Residential Dwelling)
Water Tap Fee (3/4in, Single Family)Effective 1-1-2022; scales up to $42,840 for a 2in tap
$7,139
Raw Water Acquisition Fee (3/4in, Single Family)Effective 1-1-2022; scales up to $72,000 for a 2in tap
$12,001
Sewer Tap Fee (3/4in, Single Family)Effective 1-1-2022; scales up to $49,035 for a 2in tap
$8,172
Drainage Impact FeeAssessed only in the Park and Ash Hollow Drainage Basins when on-site detention is not provided
$0.209 per square foot of impervious area, per lot (Single Family Residential)

Review timeline

Plan review
Not published — contact the department

How long did your New Residential Home Building Permit permit actually take in Keenesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost line depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes

See the full Keenesburg inspection guide — scheduling & re-inspection fees →

Tips

  • Keenesburg's impact fee stack (Water Tap, Raw Water Acquisition, Sewer Tap, Parks, Roadway, Town Hall, Police, School Sites, Emergency Services) can add well over $30,000 to a new single-family home's total cost before standard building-permit fees are even calculated — budget for these separately-ordinanced fees (Municipal Code Sec. 4-7-40) alongside the valuation-based permit fee.
  • The Town's Building Official operates under a professional-services contract with Charles Abbott Associates (CAA) rather than as a direct town employee — the stevejones@caa.inc email and 720-810-5751 direct line are the correct contacts for building-official-level questions.
  • As of 6/11/2026, permits are only processed and issued on Wednesdays and Fridays — plan submission timing around this two-day-per-week cadence rather than assuming daily processing.

Frequently asked questions

Keenesburg requires a new residential home building permit for: Geotech / Soils Report required for site assessment; Plot Plan showing property boundary lines and dimensions, distances between structures and property lines, north arrow/scale, property address, lot dimensions, and legal description; Architectural Plans designed and stamped by a Colorado Licensed Design Professional: floor plans, roof plans with ventilation calculations, elevation/section views with insulation values, fire-rating details, electrical layouts, mechanical systems documentation; Structural Plans stamped by a Colorado Licensed Engineer: foundation details, framing layouts, shear walls, hold-downs, design load information; Energy Code Compliance: ResCheck completion or energy rating report, plus Manual J, D & S calculations; Plans must meet the Town's Design Criteria: 30 PSF ground snow load, 115 mph ultimate / 90 mph nominal wind speed (Exposure C), Seismic Design Category B, 30-inch minimum frost line depth, ice barrier underlayment required. If your project isn't listed, confirm with Town of Keenesburg Building Department at 303-732-4281 ext. 2 before starting work.

In Keenesburg, the published Building Permit Fee — valuation $1 to $500 is: $33.80. Additional published fees: Building Permit Fee — valuation $501 to $2,000 — $33.80 for the first $500, plus $3.44 for each additional $100 or fraction thereof, to and including $2,000; Building Permit Fee — valuation $2,001 to $25,000 — $85.40 for the first $2,000, plus $15.77 for each additional $1,000 or fraction thereof, to and including $25,000; Building Permit Fee — valuation $25,001 to $50,000 — $448.11 for the first $25,000, plus $11.49 for each additional $1,000 or fraction thereof, to and including $50,000; Building Permit Fee — valuation $50,001 to $100,000 — $735.36 for the first $50,000, plus $7.88 for each additional $1,000 or fraction thereof, to and including $100,000; Building Permit Fee — valuation $100,001 to $500,000 — $1,129.36 for the first $100,000, plus $6.30 for each additional $1,000 or fraction thereof, to and including $500,000; Building Permit Fee — valuation $500,001 to $1,000,000 — $3,649.36 for the first $500,000, plus $5.35 for each additional $1,000 or fraction thereof, to and including $1,000,000; Building Permit Fee — valuation $1,000,001 and up — $6,324.36 for the first $1,000,000, plus $4.11 for each additional $1,000 or fraction thereof; Initial Plan Review Fee — 65% of total permit fees; Use Tax — 3% of gross purchase price of building materials; Parks Impact Fee — $2,643 per lot (Single Family Residential); Roadway Street Impact Fee — $4,727 per lot (Single Family Residential); Town Hall Impact Fee — $1,844 per lot (Single Family Residential); Police Impact Fee — $233 per lot (Single Family Residential); Fair Contributions for Public School Sites Impact Fee — $2,959.96 per unit (Single Family Dwellings); Emergency Services Impact Fee — $1,835.00 per unit (Residential Dwelling); Water Tap Fee (3/4in, Single Family) — $7,139; Raw Water Acquisition Fee (3/4in, Single Family) — $12,001; Sewer Tap Fee (3/4in, Single Family) — $8,172; Drainage Impact Fee — $0.209 per square foot of impervious area, per lot (Single Family Residential). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The Town does not publish a specific numeric turnaround time for new residential building permit plan review. Colorado is a home-rule state with no statewide review-time statute, and Keenesburg's Building Department page, permit checklists, and fee schedule do not state an SLA for this permit type.

You'll need: General Building Permit Application; Geotech / Soils Report; Plot Plan; Architectural Plans; Structural Plans; Energy Code Compliance Package. See the required-documents checklist on this page for details on each.

Keenesburg requires 4 inspection(s) for a new residential home building permit, in order: Foundation, Framing, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Town of Keenesburg Building Department (303-732-4281 ext. 2).

Apply through Town of Keenesburg Building Department at 91 W. Broadway Avenue, Keenesburg, CO 80643. Phone: 303-732-4281 ext. 2, email: stevejones@caa.inc. Office hours: As of 6/11/2026, permits are processed and issued on Wednesday and Friday only. Building Official Steve Jones is a contract official with Charles Abbott Associates (CAA), a third-party municipal building-department staffing firm; direct line 720-810-5751. Inspections are usually performed the next business day if the inspection request is submitted by 3:00 p.m., via the Town's online Google Forms-based 'Request an Inspection' portal.. Official information: https://www.townofkeenesburg.com/departments/building_department/index.php.

Keenesburg, Colorado has adopted: 2018 International Building Code (IBC) — Town of Keenesburg Building Department page ('Keenesburg Adopted Building Codes' list); 2018 International Residential Code (IRC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code; 2018 International Swimming Pool and Spa Code; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities; 2023 National Electrical Code (NEC) — the only code on the list not on the 2018 cycle; the live Building Department webpage lists 2023 NEC specifically, though the Town's own 'Solar Submittal Requirements' PDF (a separate, older document) still references 2020 NEC in its REFERENCE section — the actively-maintained Building Department webpage's 2023 NEC citation is treated as current per this corpus's policy of preferring the department's live page over a static, undated-revision handout.; Note on HB22-1362 (Colorado's statewide 2021 IECC energy-code floor, phased in via a jurisdiction's next code-adoption cycle rather than a blanket calendar deadline): Keenesburg's actively-maintained Building Department page still lists 2018 IECC as the adopted energy code, with no visible update to 2021 IECC or later. HB22-1362 requires jurisdictions to adopt a qualifying energy code (2021 IECC or equivalent, with electric/EV-ready/solar-ready provisions) only when the jurisdiction next updates ANY of its building codes — it does not retroactively force an update on a fixed date for towns that have not re-adopted since the law passed. No Town of Keenesburg ordinance updating its I-codes past the 2018 cycle (except the NEC swap to 2023) was found on the Town's Ordinances or Resolutions pages after direct review, so 2018 IECC is reported here as the honestly-current adopted code, with this note flagging the HB22-1362 gap rather than assuming compliance or silently upgrading the figure.. Local amendments apply — see the Keenesburg overview page for the full list.

The Town of Keenesburg Building Department issues its own building, electrical, mechanical, and plumbing permits for all work within town limits. The department is staffed under contract by Charles Abbott Associates (CAA), a municipal building-services firm; Steve Jones is the current Building Official.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Keenesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.