Roof Replacement Permit in Keenesburg, Colorado

Required for re-roofing work in Keenesburg. Offered as a One-Stop same-day permit for straightforward replacements (no plan review), with a dedicated Re-Roof Guide and Re-Roof application form. Governed by the 2018 IRC/IBC as locally adopted, including the Town's Design Criteria requiring ice barrier underlayment.

Verified 2026-07-06 · Source

When you need this permit

  • Listed under the Town's One-Stop Permits category — usually issued same day, no plan review
  • Re-Roof application collects: project address, building use type, improvement type (new/repair), owner/contractor information, roofing material type (asphalt shingles, rolled roofing, tile/clay/concrete), re-sheathing/re-decking needs, total valuation, total material cost
  • Per the Town's Design Criteria chart, ice barrier underlayment is required
  • Non-structural re-roof has its own flat specialized fee separate from the valuation-based Building Permit Fee schedule

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Non-structural re-roofTown of Keenesburg Building Permit Fee Schedule, Exhibit A, Section C, item 7
$100.00
Re-inspection Fee
$80.00

Review timeline

Plan reviewKeenesburg’s published plan-review target
0–0 business days

How long did your Roof Replacement Permit permit actually take in Keenesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material, underlayment, and flashing/valley compliance verified

See the full Keenesburg inspection guide — scheduling & re-inspection fees →

Tips

  • Keenesburg's Design Criteria chart requires ice barrier underlayment — confirm your roofer is pricing this in, not a partial-coverage product.
  • The $100 non-structural re-roof fee is a flat specialized fee, not the valuation-based Building Permit Fee schedule — confirm with the Building Department whether your specific re-roof (e.g. one involving re-decking or structural changes) still qualifies for this flat fee or triggers the standard valuation-based schedule instead.

Frequently asked questions

Keenesburg requires a roof replacement permit for: Listed under the Town's One-Stop Permits category — usually issued same day, no plan review; Re-Roof application collects: project address, building use type, improvement type (new/repair), owner/contractor information, roofing material type (asphalt shingles, rolled roofing, tile/clay/concrete), re-sheathing/re-decking needs, total valuation, total material cost; Per the Town's Design Criteria chart, ice barrier underlayment is required; Non-structural re-roof has its own flat specialized fee separate from the valuation-based Building Permit Fee schedule. If your project isn't listed, confirm with Town of Keenesburg Building Department at 303-732-4281 ext. 2 before starting work.

In Keenesburg, the published Non-structural re-roof is: $100.00. Additional published fees: Re-inspection Fee — $80.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Keenesburg's published plan-review target for a roof replacement permit is 0–0 business days.

You'll need: Re-Roof Permit Application. Depending on your project, Keenesburg may also ask for: Re-Roof Guide. See the required-documents checklist on this page for details on each.

Keenesburg requires 1 inspection(s) for a roof replacement permit, in order: Final Inspection (roof). Schedule each through Town of Keenesburg Building Department (303-732-4281 ext. 2).

Apply through Town of Keenesburg Building Department at 91 W. Broadway Avenue, Keenesburg, CO 80643. Phone: 303-732-4281 ext. 2, email: stevejones@caa.inc. Office hours: As of 6/11/2026, permits are processed and issued on Wednesday and Friday only. Building Official Steve Jones is a contract official with Charles Abbott Associates (CAA), a third-party municipal building-department staffing firm; direct line 720-810-5751. Inspections are usually performed the next business day if the inspection request is submitted by 3:00 p.m., via the Town's online Google Forms-based 'Request an Inspection' portal.. Official information: https://www.townofkeenesburg.com/departments/building_department/index.php.

Keenesburg, Colorado has adopted: 2018 International Building Code (IBC) — Town of Keenesburg Building Department page ('Keenesburg Adopted Building Codes' list); 2018 International Residential Code (IRC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code; 2018 International Swimming Pool and Spa Code; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities; 2023 National Electrical Code (NEC) — the only code on the list not on the 2018 cycle; the live Building Department webpage lists 2023 NEC specifically, though the Town's own 'Solar Submittal Requirements' PDF (a separate, older document) still references 2020 NEC in its REFERENCE section — the actively-maintained Building Department webpage's 2023 NEC citation is treated as current per this corpus's policy of preferring the department's live page over a static, undated-revision handout.; Note on HB22-1362 (Colorado's statewide 2021 IECC energy-code floor, phased in via a jurisdiction's next code-adoption cycle rather than a blanket calendar deadline): Keenesburg's actively-maintained Building Department page still lists 2018 IECC as the adopted energy code, with no visible update to 2021 IECC or later. HB22-1362 requires jurisdictions to adopt a qualifying energy code (2021 IECC or equivalent, with electric/EV-ready/solar-ready provisions) only when the jurisdiction next updates ANY of its building codes — it does not retroactively force an update on a fixed date for towns that have not re-adopted since the law passed. No Town of Keenesburg ordinance updating its I-codes past the 2018 cycle (except the NEC swap to 2023) was found on the Town's Ordinances or Resolutions pages after direct review, so 2018 IECC is reported here as the honestly-current adopted code, with this note flagging the HB22-1362 gap rather than assuming compliance or silently upgrading the figure.. Local amendments apply — see the Keenesburg overview page for the full list.

Yes, for a straightforward non-structural re-roof, which is listed under the Town's One-Stop Permits category and usually issued the same day without plan review, for a flat $100 fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Keenesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.