Electric Vehicle (EV) Charger / EVSE Permit in Keenesburg, Colorado

Keenesburg has no dedicated EV charger/EVSE fee line or standalone permit category. EV charger (Level 2 or DC fast charging equipment) circuit installation is electrical work governed by the 2023 NEC as adopted by the Town, billed under the same Commercial/All Other (valuation-based) or Residential (square-footage-based, if wired to enclosed living area) Electrical Permit fee tables used for other electrical work. If the specific installation is scoped as adding a new sub panel, or as an electrical service upgrade not exceeding 200A, it may qualify for the Town's 'Electrical Sub Panel' or 'Electrical Service Upgrade (≤200A)' One-Stop same-day categories (no plan review) — these are genuine Town-published fast-track categories, though the Town does not explicitly name EV chargers as falling within them.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for EV charger/EVSE circuit installation, governed by the 2023 NEC as adopted by the Town of Keenesburg, including NEC Article 625 (Electric Vehicle Charging System) provisions
  • If the installation is scoped as a new sub panel or a service upgrade not exceeding 200A, it may qualify for the Town's One-Stop same-day permit track (no plan review) — confirm with the Building Department whether your specific EV charger scope fits one of these named categories
  • Otherwise billed and reviewed under the standard Electrical Permit process (Residential square-footage-based, or Commercial/All Other valuation-based)
  • Contractor state electrical license status is verified at permit application per the Town's contemporaneous-review practice

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial/All Other Electrical Fee — $2,000 or less job valuationNo distinct EV charger/EVSE fee line exists; an EV charger circuit not wired to enclosed living area (e.g., a garage) is billed under the same valuation-based Commercial/All Other electrical fee table used for other electrical work. Town of Keenesburg Building Permit Fee Schedule, Exhibit A, Section E.
$129.95
Residential Electrical Fee — 1,000 sq ft or lessApplies if the EV charger circuit is billed under the square-footage-based residential schedule instead. Both figures re-verified 2026-07-20 by downloading the fee schedule PDF directly and confirming Section E (Electrical Permit Fees): Commercial 'Equal to or less than $2,000' = $129.95, and Residential 'Equal to or less than 1,000 square feet' = $129.95.
$129.95

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charger / EVSE Permit permit actually take in Keenesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Circuit, conduit, and disconnect placement before concealment, if applicable

  2. 2

    Final Inspection

    Charger mounted, circuit labeled, and installation verified per the adopted 2023 NEC

See the full Keenesburg inspection guide — scheduling & re-inspection fees →

Tips

  • Keenesburg does not price EV chargers separately from other electrical work — expect the standard valuation-based or square-footage-based Electrical Permit fee, not a flat EV-specific rate.
  • Ask the Building Department directly whether your EV charger installation (e.g., a new sub panel for the charging circuit, or a service upgrade to accommodate it) qualifies for the Town's same-day One-Stop 'Electrical Sub Panel' or 'Electrical Service Upgrade (≤200A)' categories — these are real fast-track categories that could plausibly cover a typical EV charger installation, though the Town has not explicitly confirmed this in writing.
  • A Colorado state electrical license is verified at the time of application per the Town's contemporaneous-review practice, consistent with the statewide model used elsewhere in Colorado.

Frequently asked questions

Keenesburg requires an electric vehicle (ev) charger / evse permit for: Electrical permit required for EV charger/EVSE circuit installation, governed by the 2023 NEC as adopted by the Town of Keenesburg, including NEC Article 625 (Electric Vehicle Charging System) provisions; If the installation is scoped as a new sub panel or a service upgrade not exceeding 200A, it may qualify for the Town's One-Stop same-day permit track (no plan review) — confirm with the Building Department whether your specific EV charger scope fits one of these named categories; Otherwise billed and reviewed under the standard Electrical Permit process (Residential square-footage-based, or Commercial/All Other valuation-based); Contractor state electrical license status is verified at permit application per the Town's contemporaneous-review practice. If your project isn't listed, confirm with Town of Keenesburg Building Department at 303-732-4281 ext. 2 before starting work.

No. Keenesburg has no dedicated EV charger/EVSE permit category or fee line. Installing a charger is billed under the Town's standard Electrical Permit fee schedule (valuation-based for commercial/non-living-area work, square-footage-based for residential living area), the same as any other electrical work. A simple sub-panel addition or service upgrade to 200A or less may qualify for same-day One-Stop issuance.

Keenesburg does not publish a plan-review timeline for this permit. Contact Town of Keenesburg Building Department at 303-732-4281 ext. 2 for current turnaround.

You'll need: General Building Permit Application. See the required-documents checklist on this page for details on each.

Keenesburg requires 2 inspection(s) for an electric vehicle (ev) charger / evse permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Keenesburg Building Department (303-732-4281 ext. 2).

Apply through Town of Keenesburg Building Department at 91 W. Broadway Avenue, Keenesburg, CO 80643. Phone: 303-732-4281 ext. 2, email: stevejones@caa.inc. Office hours: As of 6/11/2026, permits are processed and issued on Wednesday and Friday only. Building Official Steve Jones is a contract official with Charles Abbott Associates (CAA), a third-party municipal building-department staffing firm; direct line 720-810-5751. Inspections are usually performed the next business day if the inspection request is submitted by 3:00 p.m., via the Town's online Google Forms-based 'Request an Inspection' portal.. Official information: https://www.townofkeenesburg.com/departments/building_department/index.php.

Keenesburg, Colorado has adopted: 2018 International Building Code (IBC) — Town of Keenesburg Building Department page ('Keenesburg Adopted Building Codes' list); 2018 International Residential Code (IRC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code; 2018 International Swimming Pool and Spa Code; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities; 2023 National Electrical Code (NEC) — the only code on the list not on the 2018 cycle; the live Building Department webpage lists 2023 NEC specifically, though the Town's own 'Solar Submittal Requirements' PDF (a separate, older document) still references 2020 NEC in its REFERENCE section — the actively-maintained Building Department webpage's 2023 NEC citation is treated as current per this corpus's policy of preferring the department's live page over a static, undated-revision handout.; Note on HB22-1362 (Colorado's statewide 2021 IECC energy-code floor, phased in via a jurisdiction's next code-adoption cycle rather than a blanket calendar deadline): Keenesburg's actively-maintained Building Department page still lists 2018 IECC as the adopted energy code, with no visible update to 2021 IECC or later. HB22-1362 requires jurisdictions to adopt a qualifying energy code (2021 IECC or equivalent, with electric/EV-ready/solar-ready provisions) only when the jurisdiction next updates ANY of its building codes — it does not retroactively force an update on a fixed date for towns that have not re-adopted since the law passed. No Town of Keenesburg ordinance updating its I-codes past the 2018 cycle (except the NEC swap to 2023) was found on the Town's Ordinances or Resolutions pages after direct review, so 2018 IECC is reported here as the honestly-current adopted code, with this note flagging the HB22-1362 gap rather than assuming compliance or silently upgrading the figure.. Local amendments apply — see the Keenesburg overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Keenesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.