Demolition Permit in Keenesburg, Colorado

Required for structure demolition in Keenesburg. Commercial demolition additionally requires Fire District approval before a building permit can be obtained. CDPHE asbestos materials are provided as a resource for demolition projects.

Reviewed 2026-07-06 · Source

When you need this permit

  • Commercial demolition requires SE Weld Fire Protection District approval BEFORE obtaining a building permit
  • CDPHE Asbestos Renovation and Demolition guidance provided as a resource; applicants should confirm testing/abatement requirements directly given Colorado's statewide asbestos regulations
  • General Building Permit Application required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

DemolitionTown of Keenesburg Building Permit Fee Schedule, Exhibit A, Section C, item 3
$85.00

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Keenesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Site cleared, utilities properly capped/disconnected

See the full Keenesburg inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial demolition requires Fire District approval from the SE Weld Fire Protection District BEFORE the Town will issue a building permit — budget calendar time for this separate approval, which is not run by the Building Department.
  • Confirm asbestos testing requirements directly with the Building Department; the Town provides CDPHE resource documents but its own page does not state a blanket mandatory-testing rule for every demolition project the way some peer Colorado jurisdictions in this corpus do.

Frequently asked questions

Keenesburg requires a demolition permit for: Commercial demolition requires SE Weld Fire Protection District approval BEFORE obtaining a building permit; CDPHE Asbestos Renovation and Demolition guidance provided as a resource; applicants should confirm testing/abatement requirements directly given Colorado's statewide asbestos regulations; General Building Permit Application required. If your project isn't listed, confirm with Town of Keenesburg Building Department at 303-732-4281 ext. 2 before starting work.

In Keenesburg, the published Demolition is: $85.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Keenesburg does not publish a plan-review timeline for this permit. Contact Town of Keenesburg Building Department at 303-732-4281 ext. 2 for current turnaround.

You'll need: General Building Permit Application. Depending on your project, Keenesburg may also ask for: Fire District Approval (commercial demolition only); CDPHE Asbestos Renovation and Demolition Guidance. See the required-documents checklist on this page for details on each.

Keenesburg requires 1 inspection(s) for a demolition permit, in order: Final Inspection. Schedule each through Town of Keenesburg Building Department (303-732-4281 ext. 2).

Apply through Town of Keenesburg Building Department at 91 W. Broadway Avenue, Keenesburg, CO 80643. Phone: 303-732-4281 ext. 2, email: stevejones@caa.inc. Office hours: As of 6/11/2026, permits are processed and issued on Wednesday and Friday only. Building Official Steve Jones is a contract official with Charles Abbott Associates (CAA), a third-party municipal building-department staffing firm; direct line 720-810-5751. Inspections are usually performed the next business day if the inspection request is submitted by 3:00 p.m., via the Town's online Google Forms-based 'Request an Inspection' portal.. Official information: https://www.townofkeenesburg.com/departments/building_department/index.php.

Keenesburg, Colorado has adopted: 2018 International Building Code (IBC) — Town of Keenesburg Building Department page ('Keenesburg Adopted Building Codes' list); 2018 International Residential Code (IRC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Existing Building Code (IEBC); 2018 International Property Maintenance Code; 2018 International Swimming Pool and Spa Code; 2009 ICC A117.1 Accessible and Usable Buildings and Facilities; 2023 National Electrical Code (NEC) — the only code on the list not on the 2018 cycle; the live Building Department webpage lists 2023 NEC specifically, though the Town's own 'Solar Submittal Requirements' PDF (a separate, older document) still references 2020 NEC in its REFERENCE section — the actively-maintained Building Department webpage's 2023 NEC citation is treated as current per this corpus's policy of preferring the department's live page over a static, undated-revision handout.; Note on HB22-1362 (Colorado's statewide 2021 IECC energy-code floor, phased in via a jurisdiction's next code-adoption cycle rather than a blanket calendar deadline): Keenesburg's actively-maintained Building Department page still lists 2018 IECC as the adopted energy code, with no visible update to 2021 IECC or later. HB22-1362 requires jurisdictions to adopt a qualifying energy code (2021 IECC or equivalent, with electric/EV-ready/solar-ready provisions) only when the jurisdiction next updates ANY of its building codes — it does not retroactively force an update on a fixed date for towns that have not re-adopted since the law passed. No Town of Keenesburg ordinance updating its I-codes past the 2018 cycle (except the NEC swap to 2023) was found on the Town's Ordinances or Resolutions pages after direct review, so 2018 IECC is reported here as the honestly-current adopted code, with this note flagging the HB22-1362 gap rather than assuming compliance or silently upgrading the figure.. Local amendments apply — see the Keenesburg overview page for the full list.

Yes. All commercial demolition, new builds, additions, and remodels require approval from the Southeast Weld Fire Protection District before a building permit can be obtained from the Town.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Keenesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.