EV Charger / EVSE Permit in Plummer, Idaho
The City of Plummer has no EV-charger-specific permit type or fee, and the Plummer Rate Book (March 2026) has no dedicated Electrical Permit fee line item at all, unlike its detailed Building Permits section — the City's own Residential Building Permit Application confirms electrical work is not City-issued. Electrical permitting authority defers to the State of Idaho Division of Occupational and Professional Licenses (DOPL), which issues and inspects electrical permits in jurisdictions (like Plummer) that have not assumed their own electrical inspection program. DOPL's published Electrical Permit Worksheet (Fee Schedule) governs: an EV charger circuit added to an existing residence falls under the 'Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop' category — a flat $65 fee that includes the first (new) branch circuit, plus $10 for each additional branch circuit.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit is issued by the State of Idaho DOPL, not the City of Plummer — the Rate Book has no dedicated electrical permit fee line, and the City's building permit application itself defers electrical/plumbing/HVAC/sewer trades to state administration
- Apply/pay online at dbs.idaho.gov (all DOPL permits have been online-only since January 1, 2023), or submit the Contractor Electrical Permit Application (or Homeowner Electrical Permit Application for owner-installed work) by mail/email to DOPL, Boise
- EV charger circuit added to an existing dwelling is billed under DOPL's 'Existing Residence' electrical fee category: $65 flat (covers one branch circuit) plus $10 per additional branch circuit
- If the EV charger is installed as part of new single-family dwelling construction, it is instead covered under DOPL's 'New Residential' electrical fee (based on living-space square footage), not a separate line item
- Building-only scope (mounting a wall-mount charger with no new circuit) would still fall under the City/Benewah County valuation-based Building Permit fee table plus the City's 25% surcharge, per the City's own Rate Book
- No dedicated EV-charger permit application, checklist, or expedited review track is published by the City of Plummer or DOPL as of 2026-07-20
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Plummer inspection guide — scheduling & re-inspection fees →
Tips
- Plummer's Rate Book has no dedicated Electrical Permit fee line item because electrical permitting for Plummer is handled entirely by the State of Idaho DOPL, not the City or Benewah County. Apply and pay online at dbs.idaho.gov.
- This is the same jurisdictional mechanism that applies to Plummer's solar-pv-permit entry — both are electrical interconnection work billed under the same DOPL fee schedule.
- If only a wall-mount charger unit is being attached to an existing structure with no new circuit, confirm with DOPL whether any permit is triggered at all — the $65 fee is specifically for a new/altered branch circuit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Plummer building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Plummer
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →