Residential Building Permit — Plummer, Idaho · Requirements sheet
Verified 2026-07-08 · Source: https://cityofplummer.org/index.asp?DE=C376D68C-1460-4884-A361-C0D60F646E1F&SEC=DE4CCD55-99BF-4BC0-9F67-0D58D5A4482E&Type=B_BASIC
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Plummer, Idaho
Required for new single-family dwelling construction, additions, and structural alterations within the incorporated City of Plummer. Permits are issued through Plummer City Hall; the City retains its own Building Inspector for inspection services, and the Public Works Superintendent also has authority to view permits and building documents on site.
Verified 2026-07-08 · Source
When you need this permit
- Required for new residential construction, additions, remodels, and structural alterations within Plummer city limits
- Application submitted to and issued through Plummer City Hall (880 C Street)
- Completed application must be sent to rhi@cityofplummer.org
- Design must meet City-adopted design criteria: Seismic Zone C, 24-inch minimum frost depth, 90 mph basic wind speed, 60 PSF minimum roof snow load
- Separate permits are required for electrical, plumbing, HVAC, and sewer work (these trades are administered by Idaho DOPL, not the City, per the City's own permit application form)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Plummer Rate Book (March 2026), 1997 Uniform Building Code fee table, plus the City's 25% surcharge noted below. Show full citationHide
Plummer Rate Book (March 2026), 1997 Uniform Building Code fee table, plus the City's 25% surcharge noted below. Plummer follows Benewah County's building valuation fee schedule because the County currently provides the City's building inspector; the City then assesses an additional 25% fee on top of these amounts (per Rate Book note: 'The City of Plummer assesses a 25% fee in addition to these amounts').Review timeline
Inspection process
- 1
Footings / Poles
Before concrete pour or pole placement — foundation/footing verification
- 2
Framing
After framing complete, before insulation or wall cover
- 3
Insulation
Insulation installed before drywall/sheetrock
- 4
Drywall / Sheet Rock
Drywall/sheetrock stage inspection per the City's inspection log
- 5
Final Inspection
All work complete per approved plans
See the full Plummer inspection guide — scheduling & re-inspection fees →
Tips
- The City of Plummer follows Benewah County's building valuation fee schedule (the County currently provides Plummer's building inspector) and then adds a 25% City surcharge on top — budget for both components when estimating total permit cost.
- Separate permits are required for electrical, plumbing, HVAC, and sewer work. These trades are state-administered by the Idaho Division of Occupational and Professional Licenses (DOPL), not issued by City Hall — DOPL's regional inspector list assigns dedicated electrical, HVAC, and plumbing inspectors to the Plummer (83851) service area.
- This permit becomes null and void if work is not commenced within 180 days of issuance, or if construction is suspended/abandoned for 180 days at any point after work has commenced.
- Completed permit applications should be emailed to rhi@cityofplummer.org.
- Design criteria to build to: Seismic Zone C, 24-inch minimum frost depth, 90 mph basic wind speed, and a minimum 60 PSF roof snow load.
- The City of Plummer's Public Works Superintendent is also authorized to review permits and building documents on site, in addition to the Building Inspector.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Plummer building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Plummer's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Plummer yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Plummer lands. Privacy.
Other permits in Plummer
Residential Building Permit in other cities
Compare residential building permit fees across Idaho →
Look up this fee in a different city →