EV Charger / Electric Vehicle Charging Station Permit in Shelley, Idaho
Installing an EV charger in Shelley is electrical work, and since the City of Shelley does not issue its own electrical permits (electrical, plumbing, and HVAC permits are obtained separately through the State of Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, not the City -- the same routing already documented on this file's solar-pv-permit entry), the EV charging circuit is permitted directly by DOPL. DOPL's Electrical Permit Worksheet (Fee Schedule) has no dedicated 'EV charger' or 'EVSE' line item (unlike its explicit Solar/Renewable Energy formula); a new EV charger branch circuit added to an existing residence falls under the worksheet's general 'Existing Residence' fee category. A City of Shelley Building Permit is required in addition only if the installation includes new structural work (e.g., a carport or garage built to house the charger), billed under the City's general valuation-based Building Permit Fee Schedule, the same mechanism documented for solar's structural/roof-mount scope.
Verified 2026-07-20 · Source
When you need this permit
- The EV charger circuit itself must be permitted through the State of Idaho DOPL (purchased online at dbs.idaho.gov, redirecting to dopl.idaho.gov) -- not through the City of Shelley Building & Safety Department, which does not issue electrical permits
- On the DOPL Electrical Permit Worksheet, a new EV charger branch circuit at an existing residence falls under the 'Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop' category: $65 base fee plus $10 per additional branch circuit beyond the first (one circuit is included in the $65 base)
- Homeowner permits are limited to work personally performed by the property owner on a primary or secondary residence not rented or used commercially; contractor-installed work uses the standard DOPL contractor electrical permit process instead
- A City of Shelley Building Permit is required only if new structural work (e.g., a carport or garage) is built to house the charger, per the City's general valuation-based Building Permit Fee Schedule
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
DOPL Electrical Inspection
New circuit wiring, breaker, and disconnect verified, performed under the state-issued Electrical Permit
See the full Shelley inspection guide — scheduling & re-inspection fees →
Tips
- Do not contact the City of Shelley Building & Safety Department to obtain the EV charger electrical permit -- electrical work anywhere in Shelley is permitted directly by DOPL, purchased online at dbs.idaho.gov.
- A single new EV charger circuit at an existing home fits DOPL's 'Existing Residence' category: $65 base fee (which includes the first branch circuit), so a straightforward single-circuit EV charger install is typically just the $65 base fee.
- Unlike solar (which gets an explicit percentage-of-cost formula on the DOPL worksheet), EV chargers have no dedicated line item -- they're billed as an ordinary new branch circuit under the Existing Residence category.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Shelley
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Idaho →
Look up this fee in a different city →