Solar Photovoltaic (PV) Permit in Shelley, Idaho

Required for installing a rooftop or ground-mount photovoltaic system within Shelley city limits. TWO separate permits apply: a City of Shelley Building Permit for the structural/roof-mount work (valuation-based, no dedicated solar line item on the City's own Building Permit Fee Schedule) and a State of Idaho DOPL Electrical Permit for the PV electrical installation, since electrical work in Shelley is obtained separately through the State of Idaho, not the City.

Verified 2026-07-20 · Source

When you need this permit

  • City of Shelley Building Permit required for the structural/roof-mount component (racking, roof penetrations, or ground-mount foundation), reviewed under the City's general valuation-based fee schedule — no solar-specific fee line exists
  • State of Idaho DOPL Electrical Permit required separately for the PV system's electrical installation — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); NOT issued by the City of Shelley Building & Safety Department
  • Solar/Renewable Energy box must be checked on the DOPL Electrical Permit Worksheet, with total system cost entered as the Job Value Amount
  • Grid-Connected Renewable Energy systems require a plan-check permit number from DOPL FIRST (1-800-955-3044) before the installation permit can be purchased
  • Ground-mounted arrays are treated as accessory structures subject to City zoning setback, height, and lot-coverage requirements in addition to the building/electrical permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

City Building Permit — valuation $1.00 to $500.00City of Shelley Building Permit Fee Schedule (document last modified 2025-03-06); no solar-specific fee line
$21.00
City Building Permit — valuation $2,000.00 (base fee at bracket)Full $100-$50,000 valuation-to-fee table available in $100/$1,000 increments
$62.50
City Building Permit — valuation $50,001.00 to $100,000.00
$574.75 for the first $50,000.00, plus $6.25 for each additional $1,000.00 or fraction thereof
State of Idaho DOPL Electrical Permit — Solar/Renewable Energy (up to $10,000 system cost)DOPL Electrical Permit Worksheet (Fee Schedule), 'Other Installations including Solar/Renewable Energy' section — statewide formula used wherever DOPL (not the local jurisdiction) issues electrical permits, which applies to Shelley since electrical permits here are obtained separately through the State of Idaho
(Total cost of electrical system x 0.02) + $60
State of Idaho DOPL Electrical Permit — Solar/Renewable Energy ($10,001-$100,000 system cost)
((Total cost of electrical system - $10,000) x 0.01) + $260
State of Idaho DOPL Electrical Permit — Solar/Renewable Energy (over $100,001 system cost)
((Total cost of electrical system - $100,000) x 0.005) + $1,160

Review timeline

Plan review
Not published — contact the department

How long did your Solar Photovoltaic (PV) Permit permit actually take in Shelley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    City Building Inspection

    Structural/roof-mount racking, roof-penetration, or ground-mount foundation compliance

  2. 2

    DOPL Electrical Rough-In/Final

    State-inspected; project valuation verified against actual cost at Final inspection

See the full Shelley inspection guide — scheduling & re-inspection fees →

Tips

  • Solar in Shelley requires TWO separate permits from TWO separate agencies: a City of Shelley Building Permit for the structural component (no solar-specific fee line) and a State of Idaho DOPL Electrical Permit for the PV electrical work (which DOES have a dedicated Solar/Renewable Energy fee formula).
  • Ground-mounted solar arrays are treated as accessory structures — confirm setback, height, and lot-coverage compliance with the City in addition to the two permits.
  • A grid-connected system needs a DOPL plan-check permit number BEFORE you can purchase the state electrical installation permit — budget extra lead time for this step.

Frequently asked questions

Shelley requires a solar photovoltaic (pv) permit for: City of Shelley Building Permit required for the structural/roof-mount component (racking, roof penetrations, or ground-mount foundation), reviewed under the City's general valuation-based fee schedule — no solar-specific fee line exists; State of Idaho DOPL Electrical Permit required separately for the PV system's electrical installation — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); NOT issued by the City of Shelley Building & Safety Department; Solar/Renewable Energy box must be checked on the DOPL Electrical Permit Worksheet, with total system cost entered as the Job Value Amount; Grid-Connected Renewable Energy systems require a plan-check permit number from DOPL FIRST (1-800-955-3044) before the installation permit can be purchased; Ground-mounted arrays are treated as accessory structures subject to City zoning setback, height, and lot-coverage requirements in addition to the building/electrical permits. If your project isn't listed, confirm with City of Shelley Building & Safety Department at (208) 681-3391 before starting work.

No. The City of Shelley's own Building Permit Fee Schedule has no solar-specific line item — the structural component of a solar installation is billed under the same general valuation-based table used for all other building work.

Shelley does not publish a plan-review timeline for this permit. Contact City of Shelley Building & Safety Department at (208) 681-3391 for current turnaround.

You'll need: City of Shelley Building Permit Application; DOPL Homeowner or Contractor Electrical Permit Application and Worksheet. See the required-documents checklist on this page for details on each.

Shelley requires 2 inspection(s) for a solar photovoltaic (pv) permit, in order: City Building Inspection, DOPL Electrical Rough-In/Final. Schedule each through City of Shelley Building & Safety Department ((208) 681-3391).

Apply through City of Shelley Building & Safety Department at 155 E. Pine Street, Shelley, ID 83274. Phone: (208) 681-3391. Office hours: Building Inspector's Office: Monday–Thursday 7:00 a.m. – 5:30 p.m. (City Hall administrative offices: Mon–Thu 8:00 a.m.–5:30 p.m., Fri 8:00 a.m.–noon). Official information: https://cityofshelley.org/city-departments/building-safety-department/.

Shelley, Idaho has adopted: City Code Title 7, Chapter 1 (Uniform Building Code) still codifies the Uniform Building Code, 1991 Edition, published by the International Conference of Building Officials, 'and such later supplements and additions as may hereafter be published' (Title 7-1-1) — this is the codified text on file with the City Clerk; The City of Shelley Building & Safety Department's official department webpage states the department currently administers and enforces the 2018 International Residential Code (IRC) and 2018 International Building Code (IBC), with local amendments; contact the department directly for the specific amendment list, as the department page notes without itemizing each amendment beyond the published Design Loads Table; City of Shelley Design Loads Table R301.2(1) (department-published amendment document) sets Idaho Building Code Board-style climatic/geographic design criteria for the city; City Code Title 7, Chapter 2 — Uniform Code for the Abatement of Dangerous Buildings, Chapters 4 through 7, 1979 Edition (unsafe/dangerous building abatement, separate from routine demolition permits); City Code Title 7, Chapter 4 — Uniform Fire Code (enforcement excluded from the Planning and Building Division's duties per Title 3-8-2(A); administered separately); City Code Title 7, Chapter 5 — Uniform Sign Code; City Code Title 7, Chapter 6 — Electrical Code (administered by the State of Idaho, not the City, per the Building & Safety Department page); City Code Title 7, Chapter 7 — Plumbing Code (administered by the State of Idaho, not the City); City Code Title 7, Chapter 8 — Uniform Mechanical Code (HVAC administered by the State of Idaho, not the City); City Code Title 7, Chapter 9 — Americans with Disabilities Act provisions; Electrical, plumbing, and HVAC permits and inspections in Shelley are obtained through the State of Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, not the City — confirmed on both the Building & Safety Department webpage and the New Construction Packet (DOPL contact: 208-334-3233). Local amendments apply — see the Shelley overview page for the full list.

No. Per the City's own building-permit description, electrical, plumbing, and HVAC permits in Shelley are obtained separately through the State of Idaho (DOPL), not the City. The City still issues its own Building Permit for the structural/roof-mount or ground-mount component of a solar project.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.