Skip to main content
PermitBase

Building Permit (New Construction, Additions, Remodels) in Shelley, Idaho

Required for any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repour, remove, or convert anything structural within the City of Shelley. Covers new single-family and multi-family residential construction, additions, remodels, garages, basements, foundations, and agricultural buildings. Electrical, plumbing, and HVAC permits are obtained separately through the State of Idaho. Shelley does not publish a distinct commercial-building-permit or tenant-improvement-permit application, fee schedule, or review process: the Building & Safety Department webpage states its purpose is inspecting and monitoring 'all new and existing structures, both residential and commercial,' City Code 7-1-4 extends the City's new-construction requirements to 'residential homes (including manufactured homes), businesses, schools, churches, apartment buildings,' and the City of Shelley Building Permit Fee Schedule / Building Permit Valuation Schedule use one generic valuation-based fee table — with an explicit 'Remodel' per-square-foot line item — for every building type, commercial included. This SAME Building Permit Application, process, and fee table is what a commercial new-construction or tenant-improvement/remodel project in Shelley uses; see the tips and gotchas entries for full sourcing.

Verified 2026-07-07 · Source

When you need this permit

  • New construction (single-family residential, multi-family residential, commercial, or agricultural building) — Shelley uses this one Building Permit product for all occupancy types, per the Building & Safety Department webpage ('both residential and commercial') and City Code 7-1-4, whose new-construction requirements expressly cover 'businesses, schools, churches, apartment buildings'
  • Additions, remodels (including commercial tenant-improvement/remodel work, billed under the fee schedule's 'Remodel' valuation line), and finished/unfinished basement conversions
  • Garages and foundations
  • Manufactured/mobile homes and moved-on houses (additional flat fee plus foundation fee)
  • Paved driveway to garage per City Code 7-1-6 for new single-family construction (minimum 24' x 24' garage, driveway width the greater of garage width or 24 feet)
  • Street-side improvements (sidewalks, curbs, gutters) per City Code 7-1-4, unless waived by City Council
  • Certificate of Occupancy required before use or occupancy (City Code 7-1-5)
  • Commercial projects follow the 2018 IBC (adopted per the Building & Safety Department webpage, with local amendments) rather than the 2018 IRC used for one- and two-family residential work; both are administered through this same Building Permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit — valuation $1.00 to $500.00City of Shelley Building Permit Fee Schedule (document last modified 2025-03-06)
$21.00
Building Permit — valuation $2,000.00
City of Shelley Building Permit Fee Schedule; Show full citationCity of Shelley Building Permit Fee Schedule; the schedule provides a full $100–$50,000 valuation-to-fee table in $100/$1,000 increments. The published $62.52 breaks the table's own $2.75-per-$100 progression across the surrounding brackets ($54.00 at $1,700, $56.75 at $1,800, $59.50 at $1,900), which would give $62.25; the City's figure is carried here as printed
$62.52 (base fee at the $2,000 valuation bracket)
Building Permit — valuation $50,001.00 to $100,000.00City of Shelley Building Permit Fee Schedule
$574.75 for the first $50,000.00, plus $6.25 for each additional $1,000.00 or fraction thereof
Building Permit — valuation $100,001.00 to $500,000.00City of Shelley Building Permit Fee Schedule
$887.25 for the first $100,000.00, plus $5.00 for each additional $1,000.00 or fraction thereof
Building Permit — valuation $500,001.00 to $1,000,000.00City of Shelley Building Permit Fee Schedule
$2,887.25 for the first $500,000.00, plus $4.25 for each additional $1,000.00 or fraction thereof
Building Permit — valuation $1,000,000.00 and upCity of Shelley Building Permit Fee Schedule
$5,012.25 for the first $1,000,000.00, plus $2.75 for each additional $1,000.00 or fraction thereof
Building Permit Valuation Schedule — price per square foot (Main Floor)City of Shelley Building Permit Valuation Schedule; changes every 6 months per ICC Table, effective March 2025; same $169.09/sq ft rate applies to Additional Floor and Finished Basement
$169.09 per sq ft
Building Permit Valuation Schedule — Unfinished BasementCity of Shelley Building Permit Valuation Schedule, effective March 2025
$31.50 per sq ft
Building Permit Valuation Schedule — Garage / Foundation / Agricultural BuildingCity of Shelley Building Permit Valuation Schedule, effective March 2025
$10.00 per sq ft each
Building Permit Valuation Schedule — AdditionCity of Shelley Building Permit Valuation Schedule, effective March 2025
$65.00 per sq ft
Move-on House / Manufactured Home / Mobile HomeCity of Shelley Building Permit Fee Schedule
$50.00 flat (manufactured home fee is plus a separate foundation fee)
Non-Commercial Potato CellarCity of Shelley Building Permit Fee Schedule
$100.00 flat

Review timeline

Plan reviewShelley’s published plan-review target
10–20 business days

How long did your Building Permit (New Construction, Additions, Remodels) permit actually take in Shelley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footings

    Verify forms, rebar, and frost depth (30-inch minimum per City of Shelley Design Loads Table)

  2. 2

    Framing

    After framing and rough-in trades, before insulation or wall cover

  3. 3

    Final

    Completed work verified against approved plans; required before Certificate of Occupancy is issued

See the full Shelley inspection guide — scheduling & re-inspection fees →

Tips

  • Idaho Code 39-4117 (effective 2025) requires the City to determine whether a residential building permit application is complete within 10 business days of receipt (20 business days for commercial); this is a statewide statutory completeness-review timeframe, not a guarantee of full plan approval within that window. Shelley has not published its own separate full plan-review-to-issuance turnaround time beyond this state law.
  • Electrical, plumbing, and HVAC permits/inspections are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, not the City — call 208-334-3233.
  • Proof of Eastern Idaho Regional Sewer District (EIRSD) connection fee payment must be submitted when the building permit is purchased; separate city sewer and water connection fees also apply, and a utility account must be set up at permit issuance (monthly billing begins the first of the month after connection fees are paid, whether utilities are used or not).
  • New single-family construction requires a paved driveway (minimum 2 inches compacted asphalt, cement, or approved permanent covering) sized to the greater of the garage width or 24 feet, with a minimum 24' x 24' garage (City Code 7-1-6).
  • If permitted work is started before the permit is obtained, the City doubles the permit fee (City Code 7-1-2(B)).

Frequently asked questions

Yes. The City of Shelley requires a permit for any construction, enlargement, alteration, repair, moving, demolition, or occupancy change of a building or structure. The Building Permit Application is submitted online through the City's Zipflow portal.

In Shelley, the published Building Permit — valuation $1.00 to $500.00 is: $21.00. Additional published fees: Building Permit — valuation $2,000.00 — $62.52 (base fee at the $2,000 valuation bracket); Building Permit — valuation $50,001.00 to $100,000.00 — $574.75 for the first $50,000.00, plus $6.25 for each additional $1,000.00 or fraction thereof; Building Permit — valuation $100,001.00 to $500,000.00 — $887.25 for the first $100,000.00, plus $5.00 for each additional $1,000.00 or fraction thereof; Building Permit — valuation $500,001.00 to $1,000,000.00 — $2,887.25 for the first $500,000.00, plus $4.25 for each additional $1,000.00 or fraction thereof; Building Permit — valuation $1,000,000.00 and up — $5,012.25 for the first $1,000,000.00, plus $2.75 for each additional $1,000.00 or fraction thereof; Building Permit Valuation Schedule — price per square foot (Main Floor) — $169.09 per sq ft; Building Permit Valuation Schedule — Unfinished Basement — $31.50 per sq ft; Building Permit Valuation Schedule — Garage / Foundation / Agricultural Building — $10.00 per sq ft each; Building Permit Valuation Schedule — Addition — $65.00 per sq ft; Move-on House / Manufactured Home / Mobile Home — $50.00 flat (manufactured home fee is plus a separate foundation fee); Non-Commercial Potato Cellar — $100.00 flat. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Idaho Code 39-4117 requires the City to determine whether a residential application is complete within 10 business days of submission (20 business days for commercial). The City of Shelley has not published a separate full review-to-approval timeframe beyond this statutory completeness-review requirement.

You'll need: Building Permit Application; New Construction Packet; Proof of Regional Sewer Connection Fee Payment; Construction Drawings. See the required-documents checklist on this page for details on each.

Shelley requires 3 inspection(s) for a building permit (new construction, additions, remodels), in order: Foundation / Footings, Framing, Final. Schedule each through City of Shelley Building & Safety Department ((208) 681-3391).

Apply through City of Shelley Building & Safety Department at 155 E. Pine Street, Shelley, ID 83274. Phone: (208) 681-3391. Office hours: Building Inspector's Office: Monday–Thursday 7:00 a.m. – 5:30 p.m. (City Hall administrative offices: Mon–Thu 8:00 a.m.–5:30 p.m., Fri 8:00 a.m.–noon). Official information: https://cityofshelley.org/city-departments/building-safety-department/.

Shelley, Idaho has adopted: City Code Title 7, Chapter 1 (Uniform Building Code) still codifies the Uniform Building Code, 1991 Edition, published by the International Conference of Building Officials, 'and such later supplements and additions as may hereafter be published' (Title 7-1-1) — this is the codified text on file with the City Clerk; The City of Shelley Building & Safety Department's official department webpage states the department currently administers and enforces the 2018 International Residential Code (IRC) and 2018 International Building Code (IBC), with local amendments; contact the department directly for the specific amendment list, as the department page notes without itemizing each amendment beyond the published Design Loads Table; City of Shelley Design Loads Table R301.2(1) (department-published amendment document) sets Idaho Building Code Board-style climatic/geographic design criteria for the city; City Code Title 7, Chapter 2 — Uniform Code for the Abatement of Dangerous Buildings, Chapters 4 through 7, 1979 Edition (unsafe/dangerous building abatement, separate from routine demolition permits); City Code Title 7, Chapter 4 — Uniform Fire Code (enforcement excluded from the Planning and Building Division's duties per Title 3-8-2(A); administered separately); City Code Title 7, Chapter 5 — Uniform Sign Code; City Code Title 7, Chapter 6 — Electrical Code (administered by the State of Idaho, not the City, per the Building & Safety Department page); City Code Title 7, Chapter 7 — Plumbing Code (administered by the State of Idaho, not the City); City Code Title 7, Chapter 8 — Uniform Mechanical Code (HVAC administered by the State of Idaho, not the City); City Code Title 7, Chapter 9 — Americans with Disabilities Act provisions; Electrical, plumbing, and HVAC permits and inspections in Shelley are obtained through the State of Idaho Division of Occupational and Professional Licenses (DOPL) / Division of Building Safety, not the City — confirmed on both the Building & Safety Department webpage and the New Construction Packet (DOPL contact: 208-334-3233). Local amendments apply — see the Shelley overview page for the full list.

No. Shelley uses this same general Building Permit for commercial new construction and for tenant-improvement/remodel work in existing commercial space — there is no dedicated commercial-building-permit or TI-permit application, fee schedule, or process. The Building & Safety Department webpage says its scope covers 'all new and existing structures, both residential and commercial,' and the City's Building Permit Fee Schedule and Valuation Schedule apply one generic valuation-based fee table (including a 'Remodel' per-square-foot line) to every building type. The one confirmed commercial-specific difference is procedural, not a separate permit product: Idaho Code 39-4117 gives the City 20 business days to determine a commercial application is complete, versus 10 business days for residential.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shelley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Shelley's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Shelley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Shelley lands. Privacy.