Ketchum building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Ketchum, Idaho.
Verified 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 191 5th St. West (P.O. Box 2315), Ketchum, ID 83340
- Phone
- (208) 726-7801
- Office hours
- Mon–Fri 8:30 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- The City's building department now uses CommunityConnect for permit applications, tracking, and inspection scheduling. (Residential Building Permit (New Construction / Additions))
- 24-hour advance notice is required to schedule any city building inspection; call (208) 727-5079 or use CommunityConnect. (Residential Building Permit (New Construction / Additions))
- Schedule state inspections online via eTRAKiT or by calling (208) 332-4700; 'This permit application is not an inspection request' — inspections must be requested separately. (Electrical Permit (State of Idaho))
Inspection sequence
Applies to: Residential Building Permit (New Construction / Additions)
- 1
Footings / Foundation
Before concrete pour — forms, rebar, and foundation elements verified
- 2
Framing
Structural framing verified before insulation or wall cover
- 3
Insulation
Insulation and energy code compliance verified before drywall
- 4
Masonry / Concrete
Masonry and concrete work verified as applicable to the project
- 5
Roofing
Roof assembly and covering verified
- 6
Pre-Final
Pre-final inspection required on all permits (except re-roofs) before departmental finals commence
- 7
Final Building Inspection
Last inspection before Certificate of Occupancy/Certificate of Completion, after Fire, Planning, and Engineering finals are complete
Applies to: Residential Remodel / Repair Permit
- 1
Framing / Structural (as applicable)
Required for remodels/repairs involving structural or framing changes
- 2
Pre-Final
Required on all permits except re-roofs, before departmental finals commence
- 3
Final Building Inspection
Final inspection after all applicable departmental finals (Fire, Planning, Engineering) are complete
Applies to: Electric Vehicle (EV) Charger / EVSE Permit (State of Idaho)
- 1
Rough-In
Circuit and conduit verified by a State of Idaho inspector before concealment, if applicable
- 2
Final
Charger mounted, circuit labeled, and installation verified by DOPL; scheduled via eTRAKiT or (208) 332-4700
Applies to: Electrical Permit (State of Idaho)
- 1
Rough-In
Wiring and rough-in verified by a State of Idaho inspector before walls are closed
- 2
Final
Completed installation verified; scheduled via eTRAKiT or (208) 332-4700
Applies to: Plumbing Permit (State of Idaho)
- 1
Underground / Rough-In
Pipe slope, materials, and rough-in verified before concealment
- 2
Final
All fixtures connected, no leaks, proper venting verified by a State of Idaho inspector
Applies to: Solar Photovoltaic (PV) Permit
- 1
Final — Building/Structural (City)
Panel mounting and racking attachment verified by the City of Ketchum
- 2
Electrical Inspection (State of Idaho)
Wiring, inverter, and interconnection inspected by DBS/DOPL — scheduled separately via eTRAKiT or (208) 332-4700
Final inspection only: Demolition Permit, Re-Roof Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ketchum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Ketchum building permits
Get alerts for Ketchum
We'll email you when Ketchum's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.