Electric Vehicle (EV) Charger / EVSE Permit (State of Idaho) in Ketchum, Idaho

The City of Ketchum does not issue electrical permits — like all other electrical work, EV charger/EVSE circuit installation is permitted and inspected directly by the State of Idaho Division of Building Safety (DBS)/DOPL, confirmed on the City's own Inspections page ('All mechanical, electrical and plumbing inspections are handled by the State of Idaho.'). No dedicated EV charger/EVSE fee category exists in IDAPA 24.39.10 (Rules of the Idaho Electrical Board) — a new EV charger circuit added to an existing residence is billed under the flat $65 Existing Residential Dwelling Unit Permit fee, confirmed directly against DOPL's currently published electrical board rules (the same statewide schedule verified for Idaho City, Jerome, and Kellogg, ID in this same research pass). A grid-connected renewable-energy Plan Check Fee line exists on DOPL's older Homeowner Electrical Permit Application & Fee Worksheet, but it is scoped to solar/renewable generation interconnection, not EV charging load.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permits are purchased online at dbs.idaho.gov (as of January 1, 2023, all permits must be purchased online)
  • Idaho state law allows a homeowner to pull their own electrical permit for EV charger installation on their primary or secondary residence and associated outbuildings not used commercially or rented to a tenant
  • Contractors must hold a valid Idaho electrical contractor license Contractor
  • Not administered by the City of Ketchum — apply directly with DOPL, not through CommunityConnect
  • Governed by the National Electrical Code edition currently adopted by the State of Idaho, including NEC Article 625 (Electric Vehicle Charging System) provisions

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Existing Residential Dwelling Unit PermitNo distinct EV charger/EVSE fee line exists; a new EV charger circuit added to an existing residence is billed under this general existing-dwelling-unit fee. IDAPA 24.39.10, Rules of the Idaho Electrical Board, Section 050.02 (Residential Permits, Existing Residential Dwelling Unit) -- current rule text. Note: the City-linked DOPL 'Homeowner Electrical Permit Application & Fee Worksheet' (rev. 8/17/2022) still shows an older formula ('$65 plus $10 per additional branch circuit'); that per-circuit add-on was dropped in a subsequent DOPL rulemaking and does not appear in the current IDAPA 24.39.10 rule text, confirmed 2026-07-20 directly against DOPL's currently published Idaho Electrical Board rules PDF. Use the flat $65/inspection figure, not the stale worksheet's formula.
$65 per inspection
New Single Family Dwelling — up to 1,500 sq ftApplies if the EV charger circuit is installed as part of new residential construction, billed under the same whole-house new-construction fee tier as other electrical work. IDAPA 24.39.10, Section 050.01.a; confirmed 2026-07-20 against DOPL's current rules PDF -- matches the 2022 worksheet's figure, so this one remains current.
$130

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charger / EVSE Permit (State of Idaho) permit actually take in Ketchum?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Circuit and conduit verified by a State of Idaho inspector before concealment, if applicable

  2. 2

    Final

    Charger mounted, circuit labeled, and installation verified by DOPL; scheduled via eTRAKiT or (208) 332-4700

See the full Ketchum inspection guide — scheduling & re-inspection fees →

Tips

  • Ketchum does not process EV charger electrical permits through CommunityConnect — apply and pay directly at dbs.idaho.gov, the same as for any other electrical work.
  • Idaho state law permits homeowners to pull their own electrical permit for EV charger installation on their primary or secondary residence without a contractor license, but all work must still pass state inspection. Contractor
  • A new EV charger circuit on an existing home is priced the same as any other existing-dwelling-unit electrical work: a flat $65 per inspection under the current IDAPA 24.39.10 rule — there is no EV-specific rate, and no per-additional-circuit surcharge under the currently effective rule (an older DOPL worksheet still shows a since-dropped +$10/circuit add-on).

Frequently asked questions

Ketchum requires an electric vehicle (ev) charger / evse permit (state of idaho) for: Electrical permits are purchased online at dbs.idaho.gov (as of January 1, 2023, all permits must be purchased online); Idaho state law allows a homeowner to pull their own electrical permit for EV charger installation on their primary or secondary residence and associated outbuildings not used commercially or rented to a tenant; Contractors must hold a valid Idaho electrical contractor license; Not administered by the City of Ketchum — apply directly with DOPL, not through CommunityConnect; Governed by the National Electrical Code edition currently adopted by the State of Idaho, including NEC Article 625 (Electric Vehicle Charging System) provisions. If your project isn't listed, confirm with City of Ketchum Planning & Building Department at (208) 726-7801 before starting work.

In Ketchum, the published Existing Residential Dwelling Unit Permit is: $65 per inspection. Additional published fees: New Single Family Dwelling — up to 1,500 sq ft — $130. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Ketchum does not publish a plan-review timeline for this permit. Contact City of Ketchum Planning & Building Department at (208) 726-7801 for current turnaround.

You'll need: Homeowner Electrical Permit Application (DOPL); Electrical Permit Worksheet (Fee Schedule). See the required-documents checklist on this page for details on each.

Ketchum requires 2 inspection(s) for an electric vehicle (ev) charger / evse permit (state of idaho), in order: Rough-In, Final. Schedule each through City of Ketchum Planning & Building Department ((208) 726-7801).

Apply through City of Ketchum Planning & Building Department at 191 5th St. West (P.O. Box 2315), Ketchum, ID 83340. Phone: (208) 726-7801, email: participate@ketchumidaho.org. Office hours: Mon–Fri 8:30 AM – 5:00 PM. Official information: https://www.ketchumidaho.org/planning-building/page/building-services.

Ketchum, Idaho has adopted: 2018 International Building Code (IBC) — as amended by the Idaho Building Code Board, with Appendix O; 2018 International Residential Code (IRC) — as amended by the Idaho Building Code Board, Parts I–III and IX, with Appendix F; 2018 International Energy Conservation Code (IECC) — as amended by the Idaho Building Code Board; 2018 International Existing Building Code (IEBC) — as amended by the Idaho Building Code Board; 2018 International Swimming Pool and Spa Code (ISPSC) — adopted by State and City without amendment; 2018 International Property Maintenance Code (IPMC) — adopted by City of Ketchum; 2018 International Fire Code (IFC) — with Appendix Chapters B, C, D, E, and F; ICC A117.1 — Accessible and Usable Buildings and Facilities (as referenced in the adopted IBC); Electrical, plumbing, and mechanical trade work is regulated and permitted by the State of Idaho Division of Building Safety (DBS) / Division of Occupational and Professional Licenses (DOPL) — Ketchum does not issue its own trade permits; Modular buildings and structures are regulated by the State of Idaho Division of Building Safety (DBS). Local amendments apply — see the Ketchum overview page for the full list.

The State of Idaho Division of Building Safety (DBS/DOPL), not the City of Ketchum — the same arrangement that covers all electrical, plumbing, and mechanical work in the city. Apply at dbs.idaho.gov; no dedicated EV charger fee line exists, so a new circuit on an existing residence is billed at the flat $65 Existing Residential Dwelling Unit Permit fee under IDAPA 24.39.10.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ketchum building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.