EV Charger Installation Permit (State-Issued Electrical Permit) in Wilder, Idaho

Electrical work for an EV charging station (EVSE) within Wilder city limits is NOT reviewed by the City of Wilder — it is a State of Idaho electrical permit issued by the Division of Occupational and Professional Licenses (DOPL), the same statewide arrangement documented in this file's solar-pv-permit entry. DOPL's Electrical Permit Worksheet (Fee Schedule) has no distinct 'EV charger' line item; a charger circuit added to an existing residence is billed under the Residential 'Existing Residence' branch-circuit fee ($65 flat, covering one circuit — the EV charger circuit itself). Any structural/canopy component (rare for a standard wall/pedestal charger) would separately route to the City of Wilder Building Department, the same as this file's solar-pv-permit entry's structural component.

Verified 2026-07-20 · Source

When you need this permit

  • State of Idaho DOPL electrical permit required for the EV charger circuit and connection — purchased through dbs.idaho.gov; NOT issued by the City of Wilder, which does not run its own electrical program
  • Homeowner permit available only for work the property owner personally performs on their own residence; otherwise a licensed electrical contractor must pull the permit via the DOPL Contractor Electrical Permit Application
  • The DOPL Electrical Permit Worksheet's 'Existing Residence' fee line applies: $65 base fee includes one branch circuit (the charger circuit itself); $10 per additional branch circuit if the project adds more than one circuit
  • A structural/canopy component (if any) would require a City of Wilder Residential Building Permit Application, the same combined form covering Single Family Residence, Addition, Remodel, and Detached Accessory Structure project types — confirm with City Hall (208-482-6204) whether your specific installation triggers this

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State of Idaho DOPL Electrical Permit — Existing Residence, new branch circuit (EV charger)DOPL Electrical Permit Worksheet (Fee Schedule, Revised 8/17/2022), 'RESIDENTIAL — Existing Residence' section: '$65 fee plus $10 per additional branch circuit, up to the maximum of the corresponding sq. of the building (one circuit is included in the $65.00).' There is no distinct 'EV charger' line item on the DOPL worksheet — a charger circuit added to an existing residence falls under this general new-branch-circuit fee, not the separate 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY' tiered-percentage schedule (which is scoped to power generation/production/storage systems, not EV charging loads).
$65.00 flat (includes one branch circuit); $10.00 per additional branch circuit beyond the first
City of Wilder Building Permit Fee (structural/canopy, if triggered)UPDATE 2026-07-23: the fee table, previously reported as unlocatable, was found live on the city's own municipal code portal (Wilder City Code 3-1-11); same fee mechanism documented in this file's residential-building-permit and solar-pv-permit entries
Valuation-based per Wilder City Code section 3-1-11 (e.g. $24.00 for $1.00-$500.00 valuation, scaling up; Plan Review is a further 50% of the Building Permit Fee) — see the full valuation table in this file's residential-building-permit entry

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger Installation Permit (State-Issued Electrical Permit) permit actually take in Wilder?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    DOPL Electrical Final

    All electrical work performed under a DOPL permit must be inspected by the Division of Occupational and Professional Licensing

See the full Wilder inspection guide — scheduling & re-inspection fees →

Tips

  • EV charger installations in Wilder involve the State of Idaho DOPL for the electrical permit (dbs.idaho.gov, not the City) — the same agency documented for all other electrical work and for the solar-pv-permit entry in this file.
  • There is no dedicated 'EV charger' fee line on the DOPL worksheet — a standard wall/pedestal charger circuit added to an existing home is billed as a new branch circuit under the Existing Residence fee ($65 flat for the first circuit), not the higher percentage-of-cost Solar/Renewable Energy formula (which is scoped to generation/storage systems).
  • If your installation includes a new canopy or structural mounting, confirm with Wilder City Hall (208-482-6204) whether a separate City building permit is also required.

Frequently asked questions

Wilder requires an ev charger installation permit (state-issued electrical permit) for: State of Idaho DOPL electrical permit required for the EV charger circuit and connection — purchased through dbs.idaho.gov; NOT issued by the City of Wilder, which does not run its own electrical program; Homeowner permit available only for work the property owner personally performs on their own residence; otherwise a licensed electrical contractor must pull the permit via the DOPL Contractor Electrical Permit Application; The DOPL Electrical Permit Worksheet's 'Existing Residence' fee line applies: $65 base fee includes one branch circuit (the charger circuit itself); $10 per additional branch circuit if the project adds more than one circuit; A structural/canopy component (if any) would require a City of Wilder Residential Building Permit Application, the same combined form covering Single Family Residence, Addition, Remodel, and Detached Accessory Structure project types — confirm with City Hall (208-482-6204) whether your specific installation triggers this. If your project isn't listed, confirm with City of Wilder Building Department at (208) 482-6204 before starting work.

In Wilder, the published State of Idaho DOPL Electrical Permit — Existing Residence, new branch circuit (EV charger) is: $65.00 flat (includes one branch circuit); $10.00 per additional branch circuit beyond the first. Additional published fees: City of Wilder Building Permit Fee (structural/canopy, if triggered) — Valuation-based per Wilder City Code section 3-1-11 (e.g. $24.00 for $1.00-$500.00 valuation, scaling up; Plan Review is a further 50% of the Building Permit Fee) — see the full valuation table in this file's residential-building-permit entry. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Wilder does not publish a plan-review timeline for this permit. Contact City of Wilder Building Department at (208) 482-6204 for current turnaround.

You'll need: DOPL Homeowner or Contractor Electrical Permit Application. Depending on your project, Wilder may also ask for: City of Wilder Residential Building Permit Application. See the required-documents checklist on this page for details on each.

Wilder requires 1 inspection(s) for an ev charger installation permit (state-issued electrical permit), in order: DOPL Electrical Final. Schedule each through City of Wilder Building Department ((208) 482-6204).

Apply through City of Wilder Building Department at 107 4th Street, Wilder, ID 83676. Phone: (208) 482-6204, email: kbagley@cityofwilder.org. Office hours: Not published on the city website; office hours available by contacting City Hall at (208) 482-6204. Official information: https://cityofwilder.org/.

Wilder, Idaho has adopted: International Building Code (IBC), 2015 Edition, as adopted by the Idaho Building Code Board of the Division of Building Safety (IDAPA 07.03.01.004.01) — Wilder City Code section 3-1-5 'Adoption Of Building Codes'; International Residential Code (IRC), 2012 Edition, parts I-IV and IX — Wilder City Code section 3-1-5; International Energy Conservation Code (IECC), 2015 Edition, as adopted by the Idaho Building Code Board of the Division of Building Safety (IDAPA 07.03.01.004.04) — Wilder City Code section 3-1-5; UPDATE 2026-07-23: the building-code adoption ordinance (previously reported as unlocatable) was found live on the city's own municipal code portal — wilder.municipalcodeonline.com is reachable via direct chapter/section hash URLs (e.g. #name=3-1-5:_ADOPTION_OF_BUILDING_CODES), contrary to the prior finding that only the zoning title (Title 9) was accessible. Title 3, Chapter 3-1 'Building Codes And Regulations' (all 17 sections, chapter last amended by Ord. 619, 5/14/2019; code adoption history includes Ord. 613 9/5/2017, Ord. 577 2/7/2011, Ord. 474 enacted 12/17/2002) codifies the specific IBC/IRC/IECC editions above, local amendments (section 3-1-9), and the building-permit fee mechanism (section 3-1-11), which is now reflected in the residential-building-permit entry's fees array. Chapter 3-4 'Building Official And Building Permit Regulations' (Ord. 593, 12-11-2012; Ord. 327, enacted 1-13-1987) separately establishes the Building Official position and permit-issuance procedure.; Electrical, plumbing, and mechanical (HVAC) permits and inspections within Canyon County — including Wilder — are handled by the State of Idaho, Division of Occupational and Professional Licenses (DOPL), not the city, per Canyon County Building Department's published notice that 'all Mechanical, Electrical and Plumbing permits and inspections are handled by the State of Idaho' (Canyon County HVAC program transferred to DOPL 9/1/2023). Local amendments apply — see the Wilder overview page for the full list.

No. Electrical permits in Wilder, including for EV charging stations, are issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Wilder. A standard charger circuit added to an existing residence is billed under DOPL's Existing Residence branch-circuit fee ($65 flat for the first circuit, $10 per additional circuit) — there is no separate EV-charger fee category.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wilder building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare ev charger installation permit (state-issued electrical permit) fees across Idaho

Look up this fee in a different city →