EV Charger Installation Permit (State-Issued Electrical Permit) in Wilder, Idaho
Electrical work for an EV charging station (EVSE) within Wilder city limits is NOT reviewed by the City of Wilder — it is a State of Idaho electrical permit issued by the Division of Occupational and Professional Licenses (DOPL), the same statewide arrangement documented in the solar-pv-permit entry. DOPL's Electrical Permit Worksheet (Fee Schedule) has no distinct 'EV charger' line item; a charger circuit added to an existing residence is billed under the Residential 'Existing Residence' branch-circuit fee ($65 flat, covering one circuit — the EV charger circuit itself). Any structural/canopy component (rare for a standard wall/pedestal charger) would separately route to the City of Wilder Building Department, the same as the solar-pv-permit entry's structural component.
Verified 2026-07-20 · Source
When you need this permit
- State of Idaho DOPL electrical permit required for the EV charger circuit and connection — purchased through dbs.idaho.gov; NOT issued by the City of Wilder, which does not run its own electrical program
- Homeowner permit available only for work the property owner personally performs on their own residence; otherwise a licensed electrical contractor must pull the permit via the DOPL Contractor Electrical Permit Application
- The DOPL Electrical Permit Worksheet's 'Existing Residence' fee line applies: $65 base fee includes one branch circuit (the charger circuit itself); $10 per additional branch circuit if the project adds more than one circuit
- A structural/canopy component (if any) would require a City of Wilder Residential Building Permit Application, the same combined form covering Single Family Residence, Addition, Remodel, and Detached Accessory Structure project types — confirm with City Hall (208-482-6204) whether your specific installation triggers this
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
DOPL Electrical Permit Worksheet (Fee Schedule, Revised 8/17/2022), 'RESIDENTIAL — Existing Residence' section: '$65 fee plus $10 per additional branch circuit, up to the maximum of the corresponding sq. Show full citationHide
DOPL Electrical Permit Worksheet (Fee Schedule, Revised 8/17/2022), 'RESIDENTIAL — Existing Residence' section: '$65 fee plus $10 per additional branch circuit, up to the maximum of the corresponding sq. of the building (one circuit is included in the $65.00).' There is no distinct 'EV charger' line item on the DOPL worksheet — a charger circuit added to an existing residence falls under this general new-branch-circuit fee, not the separate 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY' tiered-percentage schedule (which is scoped to power generation/production/storage systems, not EV charging loads).Review timeline
Inspection process
- 1
DOPL Electrical Final
All electrical work performed under a DOPL permit must be inspected by the Division of Occupational and Professional Licensing
See the full Wilder inspection guide — scheduling & re-inspection fees →
Tips
- EV charger installations in Wilder involve the State of Idaho DOPL for the electrical permit (dbs.idaho.gov, not the City) — the same agency documented for all other electrical work and for the solar-pv-permit entry in this record.
- There is no dedicated 'EV charger' fee line on the DOPL worksheet — a standard wall/pedestal charger circuit added to an existing home is billed as a new branch circuit under the Existing Residence fee ($65 flat for the first circuit), not the higher percentage-of-cost Solar/Renewable Energy formula (which is scoped to generation/storage systems).
- If your installation includes a new canopy or structural mounting, confirm with Wilder City Hall (208-482-6204) whether a separate City building permit is also required.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wilder building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Wilder's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Wilder yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Wilder lands. Privacy.
Other permits in Wilder
EV Charger Installation Permit (State-Issued Electrical Permit) in other cities
Compare ev charger installation permit (state-issued electrical permit) fees across Idaho →
Look up this fee in a different city →