Residential Building Permit (New Construction / Addition / Remodel / Accessory Structure) in Wilder, Idaho
Required for new single-family residences, residential additions (including attached garages/carports), residential remodels, and detached accessory structures within Wilder city limits. Issued by the City of Wilder Building Department and reviewed by the city's appointed Building Official.
Verified 2026-07-23 · Source
When you need this permit
- Building permit required to construct or install a single-family residence, residential addition, residential remodel, or detached accessory structure within city limits
- Two complete sets of plans and specifications drawn to scale required for new construction and additions
- Site plan showing lot lines, private and public utilities, drainage, easements, and North arrow
- Foundation plan (reinforcement, ventilation, frost walls for stoops/overhangs)
- Floor plan (window/door sizes, ventilation, required exits)
- Roof, wall, and floor framing plan (wall bracing, header and beam sizes) — required for new construction, additions, and detached accessory structures
- Elevations (roof slopes, attic ventilation, chimney and building heights) — required for new construction, additions, and detached accessory structures
- Building section (foundation to roof)
- Energy code compliance form (REScheck) — required for new construction, additions, and remodels
- Projects within 100 feet of the Golden Gate Canal require Boise Project Board of Control approval before the city will approve the permit
- Idaho Contractor Registration Number required on the application if a licensed contractor is performing the work Contractor
- Call Idaho 811 (DIGLINE) before digging
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Inspector Approval
Final sign-off by the Building Inspector is recorded directly on the permit application form; the form does not itemize a separate multi-stage inspection sequence (e.g., foundation/framing/final) the way larger jurisdictions' public materials do
See the full Wilder inspection guide — scheduling & re-inspection fees →
Tips
- Wilder's Residential Building Permit Application covers four project types on a single form — Single Family Residence, Residential Addition, Residential Remodel, and Detached Accessory Structure — check the applicable box and provide the matching plan set.
- The application's 'Office Use Only' fee block lists Sewer Fee ($3,800), Sewer Inspection ($200), Water Hookup ($1,800), Water Inspection ($200), and Water Meter fees (5/8" meter $582.80, 1" meter $954.00, 2" meter $1,600.00) as fixed utility-connection fees; the Permit Fee and Plan Review lines are left blank on the form itself, but city staff calculate them from the valuation-based fee table codified at Wilder City Code section 3-1-11 (found 2026-07-23 on the city's own municipal code portal) — Plan Review is 50% of the Building Permit Fee.
- A Wildland Fire Rural District (WFRD) Impact Fee applies at $825 per dwelling unit or $0.41 per sq ft of non-residential space, per the application form.
- Electrical, plumbing, and HVAC/mechanical permits are NOT issued by the City of Wilder — apply directly through the Idaho Division of Occupational and Professional Licenses (dopl.idaho.gov).
- Projects within 100 feet of the Golden Gate Canal need Boise Project Board of Control sign-off on the permit application itself before the city will approve it — budget extra lead time if your parcel is canal-adjacent.
- Call 811 (Idaho DIGLINE) before any digging — printed directly on the city's permit form as a legal requirement.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wilder building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Wilder
Residential Building Permit (New Construction / Addition / Remodel / Accessory Structure) in other cities
Look up this fee in a different city →
Now live
Build your Wilder project checklist
Describe your project once and get every permit, document, and fee it triggers in Wilder — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →