Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) in Grangeville, Idaho

Required for new commercial construction, commercial additions, and commercial remodel or tenant-improvement work within the City of Grangeville and its Area of Impact. Grangeville has no separate commercial building permit application, valuation method, or plan-review rate -- this permit uses the same Building Permit & Plan Review Application, plan-set submission process, and citywide valuation-based fee schedule as residential construction, per Grangeville City Code Section 4-1-1 and the current Master Fee Schedule (Resolution #309, Exhibit A). The one substantive difference is that commercial occupancies are reviewed against the adopted International Building Code (IBC) rather than the International Residential Code that applies to one- and two-family dwellings. Plan review and inspections for both are performed under contract by a Nez Perce County building official.

Verified 2026-08-25 · Source

When you need this permit

  • New commercial construction, and commercial additions, alterations, repairs, or tenant-improvement remodels within City limits or the Grangeville Area of Impact, require a building permit
  • Submit a completed Building Permit & Plan Review Application to the City Clerk at City Hall, 225 West North Street -- the same application form and intake process used for residential work, noting the project as commercial in the description of work
  • Provide two sets of plans (18" x 24" or 24" x 36") for review, including a plot/site plan drawn to scale; the City does not publish a commercial-specific plan checklist comparable to its Residential Construction plans-for-review checklist, so applicants should confirm expected plan content with City Hall before submitting
  • Commercial occupancies are reviewed under the adopted International Building Code rather than the International Residential Code. Grangeville City Code Section 4-1-1 adopts the International Building Code, the Idaho residential code, the International Energy Conservation Code, and related codes by reference "as adopted by the state of Idaho or the Idaho building code board," with adopted versions automatically superseded as the Idaho Building Code Board approves successive editions -- the currently adopted edition is the 2018 IBC. Idaho Code Section 39-4116 requires local governments to enforce the International Building Code edition set by the Idaho Building Code Board through its rulemaking process
  • The Master Fee Schedule's Building Permit Fee Schedule table uses one valuation-based column for all building types, with no separate or higher commercial tier -- the same schedule and the same 40% Plan Review Fee apply to a commercial project as to a residential one
  • Idaho Code Section 39-4117 requires a local government to determine whether a commercial building permit application is complete within 20 business days of submission (10 business days for a residential application), and to give written notice of any missing information within that window. This is a statewide completeness-review deadline, not a Grangeville-specific policy, and it governs only the completeness determination -- it does not set a deadline for finishing plan review itself
  • If a bathroom or other plumbing is part of the project, a separate Idaho DOPL state plumbing permit is required (plumbing is not city-issued); electrical work likewise requires a state-administered Idaho DOPL permit rather than a City permit
  • Permit becomes null and void if work is not commenced within 180 days, or is suspended/abandoned for 180 days after commencement
  • A change in the use of land or an existing structure -- for example, a tenant improvement that changes occupancy, such as retail space converting to a restaurant -- may separately require an Application for Certificate of Compliance under City Ordinance No. 685, reviewed and signed by the Building Inspector, in addition to any building permit needed for the physical remodel work
  • No published requirement was found for a mandatory fire-district or state fire marshal plan review of private commercial construction in Grangeville. The City's Fire Department page describes a volunteer department and community events, with no plan-review role listed, and the Idaho State Fire Marshal's Plan Reviews program (Idaho Department of Insurance) is limited to new construction, alterations, and renovations on state-owned and state-leased buildings, not private commercial projects. A standalone Fire Inspection Application to the Fire Chief is available for a business/commercial occupancy, but the City's published materials do not describe it as a prerequisite for building-permit issuance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee -- valuation under $1,201City of Grangeville Master Fee Schedule (Resolution #309, Exhibit A), effective 10/21/2025, Building Permit Fee Schedule table -- the same table applies to commercial and residential construction alike
$15.00
Building Permit Fee -- valuation $100,001-$500,000Master Fee Schedule, Building Permit Fee Schedule table, effective 10/21/2025
$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof
Building Permit Fee -- valuation $1,000,001 and upMaster Fee Schedule, effective 10/21/2025
$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof
Plan Review Fee
Master Fee Schedule, Building Permit Fee Schedule table, effective 10/21/2025. Show full citationMaster Fee Schedule, Building Permit Fee Schedule table, effective 10/21/2025. The City does not publish a separate or higher plan-review percentage for commercial projects -- some other Idaho cities do (for example, a neighboring city charges 65% of the building permit fee for commercial plan review against 10% for residential), but Grangeville's Master Fee Schedule applies the same 40% rate to both
40% of the corresponding Building Permit Fee
Work started without a building permitMaster Fee Schedule, Building Permits section, effective 10/21/2025
Building permit fee is doubled
Fire Inspection (business/commercial occupancy)
Master Fee Schedule, 'Fire' section, effective 10/21/2025, matching the $50 checkboxes on the Fire Inspection Application form (Rev 1/2020) for the initial inspection and each additional inspection. Show full citationMaster Fee Schedule, 'Fire' section, effective 10/21/2025, matching the $50 checkboxes on the Fire Inspection Application form (Rev 1/2020) for the initial inspection and each additional inspection. Requested via a standalone Fire Inspection Application to the Fire Chief; the City's published materials do not state this is a mandatory prerequisite for building-permit issuance or for occupying a new or converted commercial tenant space
$50.00, plus $50.00 for each additional/follow-up inspection if non-compliance requires re-inspection
Application for Certificate of Compliance (change of land/structure use)Confirm current fee, if any, directly with City Hall at (208) 983-2851 before relying on this being free
Not published in the Master Fee Schedule -- no fee line for a Certificate of Compliance appears anywhere in the 7-page schedule

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) permit actually take in Grangeville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footings

    Before concrete pour -- footing depth and rebar placement verified

  2. 2

    Foundation

    Foundation and stem wall inspection

  3. 3

    Framing

    After framing complete, before insulation or interior covering installed

  4. 4

    Insulation

    Insulation installed before sheetrock/wall cover

  5. 5

    Sheetrock

    Sheetrock/drywall inspection

  6. 6

    Final

    All work complete -- electrical, plumbing, heating, and/or sheetrock finished; plans and permit must be on-site

See the full Grangeville inspection guide — scheduling & re-inspection fees →

Tips

  • The Building Permit & Plan Review Application prints one required-inspection checklist -- footings, foundation, framing, insulation, sheetrock, and final -- and the City does not publish a longer or separate inspection sequence for commercial work; the same checklist is printed on the one application form used for both residential and commercial permits.
  • There is no separate 'commercial building permit' application to look for -- use the same Building Permit & Plan Review Application used for residential work, and note 'commercial' in the description of work, since the structure will be reviewed under the adopted IBC instead of the IRC.
  • Grangeville's Plan Review Fee is 40% of the Building Permit Fee for both residential and commercial projects -- there is no separate, higher commercial plan-review rate to budget for, unlike in some neighboring Idaho cities.
  • Idaho Code Section 39-4117 gives the City 20 business days (rather than 10) to determine whether a commercial building permit application is complete, once submitted -- that clock covers completeness only, not full plan review.
  • If a tenant improvement changes how the space is used (e.g., retail to restaurant, office to retail), separately check with City Hall whether an Application for Certificate of Compliance (Ordinance No. 685) is needed -- reviewed independently of the building permit.
  • Building inspections for Grangeville, commercial included, are performed under an inter-jurisdictional contract by a Nez Perce County building official (contact: Kile Allen, (208) 790-0021, kilea@co.nezperce.id.us) -- call City Hall at (208) 983-2851 to schedule.
  • A separate Idaho DOPL state plumbing permit is required for any project involving a bathroom or other plumbing work, and electrical work requires a state-administered Idaho DOPL permit under the 2023 NEC -- neither is issued by the City.
  • If work starts before a permit is obtained, the City doubles the building permit fee.
  • Sidewalks, curbs, and gutters are required for any building permit project valued over $75,000.

Frequently asked questions

Grangeville requires a commercial building permit (new construction, additions, remodels & tenant improvements) for: New commercial construction, and commercial additions, alterations, repairs, or tenant-improvement remodels within City limits or the Grangeville Area of Impact, require a building permit; Submit a completed Building Permit & Plan Review Application to the City Clerk at City Hall, 225 West North Street -- the same application form and intake process used for residential work, noting the project as commercial in the description of work; Provide two sets of plans (18" x 24" or 24" x 36") for review, including a plot/site plan drawn to scale; the City does not publish a commercial-specific plan checklist comparable to its Residential Construction plans-for-review checklist, so applicants should confirm expected plan content with City Hall before submitting; Commercial occupancies are reviewed under the adopted International Building Code rather than the International Residential Code. Grangeville City Code Section 4-1-1 adopts the International Building Code, the Idaho residential code, the International Energy Conservation Code, and related codes by reference "as adopted by the state of Idaho or the Idaho building code board," with adopted versions automatically superseded as the Idaho Building Code Board approves successive editions -- the currently adopted edition is the 2018 IBC. Idaho Code Section 39-4116 requires local governments to enforce the International Building Code edition set by the Idaho Building Code Board through its rulemaking process; The Master Fee Schedule's Building Permit Fee Schedule table uses one valuation-based column for all building types, with no separate or higher commercial tier -- the same schedule and the same 40% Plan Review Fee apply to a commercial project as to a residential one; Idaho Code Section 39-4117 requires a local government to determine whether a commercial building permit application is complete within 20 business days of submission (10 business days for a residential application), and to give written notice of any missing information within that window. This is a statewide completeness-review deadline, not a Grangeville-specific policy, and it governs only the completeness determination -- it does not set a deadline for finishing plan review itself; If a bathroom or other plumbing is part of the project, a separate Idaho DOPL state plumbing permit is required (plumbing is not city-issued); electrical work likewise requires a state-administered Idaho DOPL permit rather than a City permit; Permit becomes null and void if work is not commenced within 180 days, or is suspended/abandoned for 180 days after commencement; A change in the use of land or an existing structure -- for example, a tenant improvement that changes occupancy, such as retail space converting to a restaurant -- may separately require an Application for Certificate of Compliance under City Ordinance No. 685, reviewed and signed by the Building Inspector, in addition to any building permit needed for the physical remodel work; No published requirement was found for a mandatory fire-district or state fire marshal plan review of private commercial construction in Grangeville. The City's Fire Department page describes a volunteer department and community events, with no plan-review role listed, and the Idaho State Fire Marshal's Plan Reviews program (Idaho Department of Insurance) is limited to new construction, alterations, and renovations on state-owned and state-leased buildings, not private commercial projects. A standalone Fire Inspection Application to the Fire Chief is available for a business/commercial occupancy, but the City's published materials do not describe it as a prerequisite for building-permit issuance. If your project isn't listed, confirm with City of Grangeville — City Hall (Building Permits) at (208) 983-2851 before starting work.

Commercial projects are billed on the same valuation-based Building Permit Fee Schedule as residential construction (starting at $15.00 for valuations under $1,201, and scaling up through the published table), plus a Plan Review Fee of 40% of the Building Permit Fee. The City does not charge a separate or higher plan-review rate for commercial work the way some neighboring Idaho cities do.

The City has not published a specific review-timeline commitment for commercial building permits. Idaho Code Section 39-4117 requires the City to determine whether a commercial application is complete within 20 business days of submission, but that covers completeness only, not the time needed to finish plan review. Applicants should contact City Hall at (208) 983-2851 for a current estimate.

You'll need: Building Permit & Plan Review Application (2024); Building Plot Plan. Depending on your project, Grangeville may also ask for: Application for Certificate of Compliance. See the required-documents checklist on this page for details on each.

Grangeville requires 6 inspection(s) for a commercial building permit (new construction, additions, remodels & tenant improvements), in order: Footings, Foundation, Framing, Insulation, Sheetrock, Final. Schedule each through City of Grangeville — City Hall (Building Permits) ((208) 983-2851).

Apply through City of Grangeville — City Hall (Building Permits) at 225 West North Street, Grangeville, ID 83530. Phone: (208) 983-2851. Office hours: Mon–Fri 8:00 AM – 5:00 PM (closed holidays). Official information: https://grangeville.us/forms-applications/.

No. Grangeville uses the same Building Permit & Plan Review Application, plan-set submission process, and citywide valuation-based fee schedule for commercial construction as for residential construction. The only substantive difference is that commercial occupancies are reviewed under the adopted International Building Code rather than the International Residential Code that applies to one- and two-family dwellings.

No published requirement for one was found. The City's Fire Department page describes a volunteer department with no plan-review role listed, and the Idaho State Fire Marshal's Plan Reviews program covers only state-owned and state-leased buildings, not private commercial construction. A $50 Fire Inspection Application is available for a business/commercial occupancy through the Fire Chief, but the City's published materials do not describe it as a building-permit prerequisite.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Grangeville.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) in other cities

Compare commercial building permit (new construction, additions, remodels & tenant improvements) fees across Idaho

Look up this fee in a different city →

Embed this data card →