EV Charger / Electric Vehicle Charging Station Permit — Grangeville, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Contractor-Electrical-Permit-Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Grangeville, Idaho
Installing a Level 2 (240V) EV charger circuit at an existing residence in Grangeville is electrical work, and since Grangeville has no electrical-permit program of its own, it requires a State of Idaho DOPL Contractor (or Homeowner) Electrical Permit -- the same statewide authority that issues the electrical permit for solar installations. Idaho's DOPL Electrical Permit Worksheet (Fee Schedule, Rev. 8/17/2022) has no dedicated 'EV charger,' 'EVSE,' or 'electric vehicle' checkbox -- confirmed by direct text search of the current worksheet PDF, which does have a dedicated checkbox for 'Solar, Renewable Energy, power generation, power production, or energy storage systems' but none for EV charging. A standalone EV charger circuit added to an existing home is instead billed under the worksheet's general 'Existing Residence' branch-circuit line item, not the Other-Installations/Renewable-Energy valuation formula used for solar.
Verified 2026-07-20 · Source
When you need this permit
- Electrical work must be permitted through the State of Idaho DOPL, not the City of Grangeville -- the City issues only structural/building permits, and an EV charger circuit with no new structure does not require a City Building Permit at all
- On the DOPL Electrical Permit Worksheet, a new dedicated EV charger circuit added to an existing single-family residence falls under the 'Existing Residence -- Modular, Manufactured or Mobile Homes -- Detached Shop' line item: a $65 base fee plus $10 per additional branch circuit beyond the one included in the base fee
- There is no Solar/Renewable-Energy-style checkbox or valuation-based formula for EV chargers on the state worksheet -- do not check that box for a standalone EV charger installation, since EVSE is treated as ordinary branch-circuit wiring, not power generation/storage
- As of January 1, 2023, all DOPL permits must be purchased online at dbs.idaho.gov rather than by mailed paper application
- A homeowner installing their own EV charger circuit (not through a contractor) may instead use the DOPL Homeowner Electrical Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Performed by an Idaho DOPL inspector; new circuit, breaker sizing, and disconnect (if required) verified before the charger is energized
See the full Grangeville inspection guide — scheduling & re-inspection fees →
Tips
- Do not check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a standalone EV charger -- that box routes the job to a different valuation-based fee formula meant for generation/storage systems, not simple branch-circuit wiring.
- A single new EV charger circuit added to an existing Grangeville home is one of the cheapest state electrical permits available -- $75 total ($65 base + $10 for the one additional circuit) versus the percentage-of-cost formula used for solar.
- No City of Grangeville Building Permit is needed for a wall-mounted or pedestal EV charger with no new structure -- only pull a City permit as well if you're also constructing a new carport or similar structure to house it, mirroring the same rule already documented for solar racking.
- As of January 1, 2023, DOPL permits must be purchased online at dbs.idaho.gov rather than mailed in.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grangeville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Grangeville
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Grangeville project checklist
Describe your project once and get every permit, document, and fee it triggers in Grangeville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →