Commercial Building Permit (New Construction, Additions & Remodels) — Harrison, Idaho · Requirements sheet
Verified 2026-08-25 · Source: https://cityofharrisonid.com/building-department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Additions & Remodels) in Harrison, Idaho
Required for new commercial construction, commercial additions, and commercial remodels/tenant-improvement work within Harrison city limits. Harrison has no dedicated commercial application, review track, or fee schedule: City Code 8-1-3(A) requires a building permit for every structure erected, enlarged, altered, or converted in use, and City Code 9-13-2(A) applies the same requirement to 'any person or business.' Commercial work is submitted on the same one-page City of Harrison Application for Building Permit used for residential and agricultural projects, checking 'Commercial,' 'Industrial,' or 'Church' under Type of Building and/or 'Remodel Existing,' and is reviewed against the 2018 IBC ('Building Code 2018 of Idaho') together with the 2018 International Existing Building Code and 2020 Idaho Energy Conservation Code, all adopted with Idaho amendments under City Code 8-1-2(A)(1). Plan review is performed by the city's own Building Official under Harrison's building-permit program (City Code 9-13-1) rather than through a neighboring city or Kootenai County.
Verified 2026-08-25 · Source
When you need this permit
- Building permit required for new construction, additions, repair, renovation, alteration, moving, demolition, occupancy, and change of occupancy of every commercial building or structure, the same standard City Code 8-1-3(A) applies to any structure in the city; City Code 9-13-2(A) separately states that 'any person or business' erecting, adding to, or structurally altering a building must obtain the proper permit from the building official
- Plans must comply with the 2018 IBC (named the Building Code 2018 of Idaho), the 2018 International Existing Building Code, and the 2020 Idaho Energy Conservation Code, all as adopted and amended by the Idaho Building Code Board under City Code 8-1-2(A)(1)
- Same permit-issuance prerequisites apply as for any other structure under City Code 8-1-3(B): final approval of any required variance, special-use permit, subdivision plat, or zone change; access-approach or encroachment approval from the applicable highway jurisdiction; for pole barns, log homes, steel structures, or other alternate systems not evaluated by a recognized evaluation service, plans stamped by an Idaho-licensed design professional; an elevation certificate if the parcel is in a special flood hazard area; a recorded survey with visible property pins; and a city-maintenance-department-approved site plan
- The City's Application for Building Permit is a single form for all project types; under 'Type of Building' it offers Commercial, Industrial, and Church checkboxes alongside Single/Two/Multi Family and Accessory Building, and a separate 'Remodel Existing' checkbox (alongside New Construction and Manufactured/Modular Home Set) covers tenant-improvement/remodel work -- there is no distinct commercial application
- The application form asks for No. of Rooms, No. of Stories, No. of Parking Spaces, and Principal Structure Type (masonry, structural steel, wood, or reinforced concrete), the same fields for every Type of Building checked; it does not include an occupancy-group or occupant-load field
- Two (2) sets of plans drawn to scale required, showing lot location, elevations, floor plan, cross section, and truss drawings, plus International Energy Conservation Code details if applicable
- For Electrical, Mechanical, and Plumbing work, obtain separate permits from Idaho DOPL -- not issued by the City of Harrison
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City Code 8-1-4 and the City's FY 25/26 Fee Schedule, Table 2 ('Building Permit -- 1997 Uniform Building Code Fee Schedule'). Show full citationHide
City Code 8-1-4 and the City's FY 25/26 Fee Schedule, Table 2 ('Building Permit -- 1997 Uniform Building Code Fee Schedule'). Table 2 lists one undifferentiated Building Permit fee line with no residential/commercial split and no separate commercial valuation method, unlike the split residential/commercial rates published for water, sewer, and garbage service in Table 4.City's FY 25/26 Fee Schedule, Table 2, and stated directly on the Building Permit application form ('Plan Review Fee (65% of Building Permit fee)'). Show full citationHide
City's FY 25/26 Fee Schedule, Table 2, and stated directly on the Building Permit application form ('Plan Review Fee (65% of Building Permit fee)'). The same 65% rate applies to every project type; Harrison does not publish a higher commercial plan-review percentage the way some other Idaho cities do. Table 2 also notes that if additional inspections or other professional pass-through fees are required during the building process, the applicant is informed and is responsible for any and all additional costs.City of Harrison FY 25/26 Fee Schedule, Table 4 ('Utility Application And Connection Fees'), Sewer Rates & Fees: Hook-Up Fee (Capitalization) $4,256, Installation Deposit $2,680, Permit for… Show full citationHide
City of Harrison FY 25/26 Fee Schedule, Table 4 ('Utility Application And Connection Fees'), Sewer Rates & Fees: Hook-Up Fee (Capitalization) $4,256, Installation Deposit $2,680, Permit for Connection $301, Reconnection Fee $301, Monthly Sewer and Water Capitalization Fee $9. Harrison City Code Title 7, Chapter 3 ('Water And Sewer Connection Fees,' Ord. 410, 7-11-2006), 7-3-6(A) requires an installation fee for any connection to the city water or sewer system based on the city's cost of connecting the applicant, with the dollar amount 'set by resolution of the city council' -- the Fee Schedule is that resolution's current published rate, not a separate unpublished per-project figure.City of Harrison FY 25/26 Fee Schedule, Table 4 ('Utility Application And Connection Fees'), Water Rates & Fees: Hook-Up (Capitalization Fee) $4,067, Installation Deposit $2,680, Permit for… Show full citationHide
City of Harrison FY 25/26 Fee Schedule, Table 4 ('Utility Application And Connection Fees'), Water Rates & Fees: Hook-Up (Capitalization Fee) $4,067, Installation Deposit $2,680, Permit for Connection $301, Reconnection Fee $301. Harrison City Code 7-1-6 ('Tapping And Connection Permit') requires an application fee for any tap or connection to a city water main 'in an amount to be set by resolution of the city council,' and City Code 7-3-6(A) (Chapter 3, 'Water And Sewer Connection Fees,' Ord. 410, 7-11-2006) applies the same council-resolution-set installation fee to water connections -- the Fee Schedule is that resolution's current published rate.Harrison has not adopted a fire code: City Code 8-1-2(A)(1)'s full enumerated list of adopted building codes -- International Building Code 2018, International Existing Building Code 2018,… Show full citationHide
Harrison has not adopted a fire code: City Code 8-1-2(A)(1)'s full enumerated list of adopted building codes -- International Building Code 2018, International Existing Building Code 2018, International Fuel Gas Code 2018, International Mechanical Code 2018, National Electrical Code 2017, Uniform Plumbing Code 2017, and the Uniform Code of Abatement of Dangerous Buildings 1997 -- contains no International Fire Code or equivalent, so no fire-code-based plan-review step is codified into the building-permit process. Idaho's State Fire Marshal plan-review program (Idaho Department of Insurance) is limited to state-owned and state-leased buildings, not private commercial construction, per its own program page. East Side Fire Protection District (208-769-4269), the volunteer district headquartered in Harrison confirmed via the Kootenai County business directory, has no official website of its own and publishes no fee schedule or plan-review process anywhere online; whether it performs any informal review of commercial projects outside the codified permit process was not confirmed and would require contacting the district directly.Review timeline
Inspection process
- 1
Foundation / Footings
Before concrete pour -- verify forms, rebar, and 24-inch minimum frost depth per City Code 8-1-2-1(A)(2)
- 2
Framing
After framing and rough-in trades, before insulation or wall cover
- 3
Final
All work complete per approved plans; required before Certificate of Occupancy is issued (City Code 8-1-5; 9-13-2(C))
See the full Harrison inspection guide — scheduling & re-inspection fees →
Tips
- Harrison has no separate commercial building permit, application, or fee schedule. New commercial construction and commercial remodels/tenant-improvement work go through the same one-page Building Permit application and the same 1997 UBC Table 1-A valuation-based fee formula as a house or an agricultural building.
- The application form has no occupancy-group or occupant-load field -- it asks for No. of Rooms, No. of Stories, No. of Parking Spaces, and Principal Structure Type regardless of what box is checked under Type of Building.
- Plan review is performed by Harrison's own Building Official under the city's building-permit program (City Code 9-13-1) rather than being funneled through Kootenai County or a neighboring city's building department.
- Idaho Code 39-4117 gives the City twenty (20) business days to determine whether a commercial application is complete -- longer than the ten (10) business days for residential -- but that clock covers completeness review only, not the time it takes to complete plan review itself.
- Harrison has not adopted an International Fire Code or any fire code -- City Code 8-1-2(A)(1)'s enumerated list of adopted building codes has no fire-code entry -- so no fire-code-based plan-review step or fee applies to a commercial building permit; East Side Fire Protection District, the volunteer district serving the area, publishes no plan-review process or fee of its own.
- A recorded survey with visible property pins and a city-maintenance-department-approved site plan are hard prerequisites for permit issuance, the same as for residential work -- budget time for the survey step before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-25.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Harrison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Harrison.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Harrison
Commercial Building Permit (New Construction, Additions & Remodels) in other cities
Compare commercial building permit (new construction, additions & remodels) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Harrison project checklist
Describe your project once and get every permit, document, and fee it triggers in Harrison — in one checklist. Free, for any city and any number of projects.
Get started →