Skip to main content
PermitBase

EV Charger / EVSE Permit in Harrison, Idaho

Harrison has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which require both a City structural Building Permit and a State electrical permit), a standard EV charger is not a power-generation or energy-storage system and involves no structural/racking work, so it does not trigger the City Building Permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, since Harrison has no electrical-permit program of its own -- using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

When you need this permit

  • No City of Harrison building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved, and Harrison's Building Permit fee (City Code 8-1-4) applies to structural/building work, not vehicle-charging circuits
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Harrison has no electrical-permit program of its own
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State DOPL Electrical Permit -- Other Installations, up to $10,000 system costIdaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form
(total cost of system x 0.02) + $60
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system costIdaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
((total cost of system - $10,000) x 0.01) + $260

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Harrison?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Performed by an Idaho DOPL inspector; charger circuit, disconnect, and GFCI/load-management compliance verified before energizing

See the full Harrison inspection guide — scheduling & re-inspection fees →

Tips

  • Harrison does not have an EV-specific permit or fee -- a home or business EV charger install is just a standard State of Idaho DOPL electrical permit, priced under the general 'Other Installations' valuation formula, since the City has no electrical program of its own.
  • No City of Harrison Building Permit is needed for a standard EV charger install since it is not a power-generation/energy-storage system and involves no structural/racking work (unlike rooftop solar, which does trigger the City's Building Permit for the structural scope).

Frequently asked questions

Harrison requires an ev charger / evse permit for: No City of Harrison building permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved, and Harrison's Building Permit fee (City Code 8-1-4) applies to structural/building work, not vehicle-charging circuits; Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City -- Harrison has no electrical-permit program of its own; On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all; Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- the fee formula is identical either way. If your project isn't listed, confirm with City of Harrison Building Department (City Hall) at (208) 689-3212 before starting work.

In Harrison, the published State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost is: (total cost of system x 0.02) + $60. Additional published fees: State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost — ((total cost of system - $10,000) x 0.01) + $260. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Harrison does not publish a plan-review timeline for this permit. Contact City of Harrison Building Department (City Hall) at (208) 689-3212 for current turnaround.

You'll need: Idaho DOPL Contractor (or Homeowner) Electrical Permit Application. See the required-documents checklist on this page for details on each.

Harrison requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection. Schedule each through City of Harrison Building Department (City Hall) ((208) 689-3212).

Apply through City of Harrison Building Department (City Hall) at 100 N Frederick Ave, P.O. Box 73, Harrison, ID 83833. Phone: (208) 689-3212, email: CityClerk@CityofHarrison.org. Office hours: Monday–Thursday 8:30 AM – 4:00 PM; Friday 9:00 AM – 3:00 PM (per City Hall Staff page); City's homepage hours widget separately lists Fri as closed — confirm same-day with City Hall at (208) 689-3212 before a Friday visit. Official information: https://cityofharrisonid.com/building-department.

Harrison, Idaho has adopted: International Existing Building Code, 2018 edition, with Idaho amendments — adopted as Harrison's official building code per City Code 8-1-2(A)(1). Source: https://codelibrary.amlegal.com/codes/harrisonid/latest/harrison_id/0-0-0-1633; International Building Code (IBC), 2018 edition, with Idaho amendments, collectively named the 'Building Code 2018 of Idaho' as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1); International Energy Conservation Code (IECC), 2018 edition, with amendments, collectively named the Idaho Energy Conservation Code (2020 edition) — City Code 8-1-2(A)(1); International Fuel Gas Code (IFGC), 2018 edition, as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1); International Mechanical Code (IMC), 2018 edition, as adopted/amended by the Idaho Building Code Board — City Code 8-1-2(A)(1); International Residential Code (IRC), 2018 edition (Parts I, II, III, and IX), with Idaho amendments, collectively named the Idaho Residential Code (2020 edition) — City Code 8-1-2(A)(1); National Electrical Code (NEC), 2017 edition, as adopted/amended by the State of Idaho / Idaho Building Code Board — City Code 8-1-2(A)(1). Note: electrical PERMITTING and INSPECTION in Harrison is administered by Idaho DOPL (state), not the city — see census.note; Uniform Code for the Abatement of Dangerous Buildings, 1997 edition — City Code 8-1-2(A)(1); Uniform Plumbing Code (UPC), 2017 edition, as adopted/amended by the State of Idaho / Idaho Building Code Board — City Code 8-1-2(A)(1). Note: plumbing PERMITTING and INSPECTION in Harrison is administered by Idaho DOPL (state), not the city — see census.note; Successive versions of the above codes as adopted by the Idaho Building Code Board become effective January 1 of the year following adoption (City Code 8-1-2(A)(2)). Source: Ord. 453 (2-4-2014); Harrison's own Building Permit application form lists the current applicable codes as: 2018 IBC, 2018 IRC (parts I, II, III, IX), 2020 Idaho Energy Conservation Code, 2018 International Existing Building Code, and 2009 ANSI A117.1 (Accessibility). Local amendments apply — see the Harrison overview page for the full list.

No. Harrison has no dedicated EV/EVSE permit or fee line item. Installing a home or business EV charger only requires a standard State of Idaho DOPL electrical permit (Harrison has no electrical-permit program of its own), priced under the general 'Other Installations' valuation-based formula. No City of Harrison structural building permit is required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Harrison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare ev charger / evse permit fees across Idaho

Look up this fee in a different city →

Embed this data card →

Related guides

Now live

Build your Harrison project checklist

Describe your project once and get every permit, document, and fee it triggers in Harrison — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →