Solar Photovoltaic (PV) Permit in Spirit Lake, Idaho
Required for installing a rooftop or ground-mount photovoltaic system within Spirit Lake city limits. TWO separate permits apply: a City of Spirit Lake Building Permit for the structural/roof-mount work (valuation-based, no dedicated solar line item) and a State of Idaho DOPL Electrical Permit for the PV electrical installation, since electrical work in Spirit Lake is NOT permitted by the City at all — it is administered statewide by DOPL, which maintains a dedicated rotating inspector roster for the Spirit Lake zip code (83869).
Verified 2026-07-20 · Source
When you need this permit
- City of Spirit Lake Building Permit required for the structural/roof-mount or ground-mount component, reviewed under the City's general valuation-based fee schedule (Resolution No. 2024-06-11, Attachment 5) — no solar-specific fee line exists
- State of Idaho DOPL Electrical Permit required separately for the PV system's electrical installation — purchased online at dbs.idaho.gov (redirects to dopl.idaho.gov); electrical work is NOT permitted by the City at all
- Solar/Renewable Energy box must be checked on the DOPL Electrical Permit Worksheet, with total system cost entered as the Job Value Amount
- Grid-Connected Renewable Energy systems require a plan-check permit number from DOPL FIRST (1-800-955-3044) before the installation permit can be purchased
- Plan Check Deposit due at plan submittal for the City building permit ($150.00 for single-family residential)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
City Building Inspection
Structural/roof-mount racking or ground-mount foundation compliance
- 2
DOPL Electrical Rough-In/Final
State-inspected via DOPL's dedicated rotating inspector roster for the Spirit Lake zip code; project valuation verified against actual cost at Final
See the full Spirit Lake inspection guide — scheduling & re-inspection fees →
Tips
- Spirit Lake is unusual even among the other small Idaho towns in this corpus: the City does not permit ANY electrical work, not just some categories — every electrical permit, including for solar, is a State of Idaho DOPL permit from end to end.
- Solar in Spirit Lake requires TWO separate permits from TWO separate agencies: a City Building Permit for the structural component (no solar-specific fee line) and a State of Idaho DOPL Electrical Permit for the PV electrical work (which DOES have a dedicated Solar/Renewable Energy fee formula).
- A grid-connected system needs a DOPL plan-check permit number BEFORE you can purchase the state electrical installation permit — budget extra lead time for this step.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Spirit Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Spirit Lake
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Spirit Lake project checklist
Describe your project once and get every permit, document, and fee it triggers in Spirit Lake — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →