EV Charger / EVSE Permit in Unincorporated Madison County, Idaho
Madison County has explicitly deleted the electrical provisions from its adopted 2018 IRC (Madison County Code Chapter 103, Article II, Sec. 2-2(B)) — electrical work in unincorporated Madison County is "regulated solely by the State of Idaho" per Idaho Code Title 54, Chapters 10 and 26, administered by the Idaho Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety), confirmed by the DOPL statewide Inspector List with Schedules (Madison County ZIP codes assigned to state electrical inspector Monte Kofoed). An EV charger/EVSE installation therefore requires a State of Idaho Electrical Permit through DOPL, not a county permit. DOPL publishes no distinct EV charger/EVSE fee line; a residential EVSE circuit added to an existing home is billed under the homeowner (or contractor) electrical permit fee structure — a base fee plus a per-branch-circuit charge for existing-residence work.
Reviewed 2026-07-20 · Source
When you need this permit
- State of Idaho Electrical Permit (DOPL) required for EV charger/EVSE circuit installation in unincorporated Madison County — apply online via the DOPL permit purchasing system, or by submitting the Homeowner or Contractor Electrical Permit Application
- Homeowners may self-perform EVSE wiring on their own primary or secondary residence and related outbuildings using a Homeowner Electrical Permit; work for others, or on commercial property, requires a licensed contractor Owner-builderContractor
- Installation must comply with the National Electrical Code edition adopted by the Idaho Electrical Board (Madison County references the 2017 NEC as regulated by the state)
- Schedule inspection through the DOPL electrical inspection request line/portal; Madison County is served by a state-assigned electrical inspector, not a county inspector
- No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform is published by DOPL
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
IDAPA 24.39.10 (Rules of the Idaho Electrical Board), Section 500.02.a.ii, effective 3-28-23: "Existing Dwelling Unit Permit: sixty-five dollars ($65) per inspection." Applies to an existing… Show full citationHide
IDAPA 24.39.10 (Rules of the Idaho Electrical Board), Section 500.02.a.ii, effective 3-28-23: "Existing Dwelling Unit Permit: sixty-five dollars ($65) per inspection." Applies to an existing residence, detached shop, or modular/manufactured/mobile home. Statewide fee set by DOPL, not by the county.DOPL Homeowner Electrical Permit Worksheet (Fee Schedule), Rev. Show full citationHide
DOPL Homeowner Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022, "Existing Residence / Modular, Manufactured or Mobile Homes / Detached Shop" row. One circuit is included in the $65.00, so a single EV charger circuit adds nothing under the worksheet either. The worksheet is the form applicants submit, but this figure is NOT in IDAPA 24.39.10 — see the confidence note on the base fee.IDAPA 24.39.10 Section 500.03: "Requested Inspection Permit. Show full citationHide
IDAPA 24.39.10 Section 500.03: "Requested Inspection Permit. A sixty-five dollar ($65) fee per inspection." Note DOPL's worksheet instead states "$65.00 per hr." for a Requested Inspection, and separately requires a $65/hour Plan Check for grid-connected renewable energy prior to purchasing the installation permit — so this is not optional for grid-tied solar or storage.Review timeline
Inspection process
- 1
Electrical Inspection
EVSE circuit, breaker, disconnect, and equipment mounting inspected by the DOPL-assigned state electrical inspector for Madison County
See the full Unincorporated Madison County inspection guide — scheduling & re-inspection fees →
Tips
- Madison County has no county-level electrical permit at all — its own code explicitly deletes electrical provisions and defers entirely to the State of Idaho, so EV charger/EVSE installations go through DOPL, not the county Building Department.
- Homeowners installing an EV charger on their own primary or secondary residence can self-permit for $65 per inspection, without hiring a licensed electrician, per DOPL's homeowner electrical permit program. Contractor
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Madison County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Madison County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Madison County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Madison County lands. Privacy.
Other permits in Unincorporated Madison County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Madison County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Madison County — in one checklist. Free, for any city and any number of projects.
Get started →