Residential Building Permit (New Construction / Addition / Accessory Structure) in Unincorporated Madison County, Idaho
Required for detached one- and two-family dwellings and associated accessory structures in unincorporated Madison County — new construction, additions, basement finishes, remodels, garages, shops, decks, barns, and carports. Madison County Building Department has issued permits since 1976. Governed by the 2018 IRC as adopted and locally amended by Madison County Code Chapter 103. Each structure on a property requires a separate permit unless otherwise approved by the Building Official. Applications may be submitted via the county's iworq online Building Permit Portal or by physical/PDF submission.
Verified 2026-07-13 · Source
When you need this permit
- Building permit required for all new residential construction, additions, basement finishes, remodels, and accessory structures in unincorporated Madison County
- Septic Permit from Eastern Idaho Public Health required prior to Building Permit approval for new dwellings, or for remodels adding a bedroom/bathroom, or connecting to an existing septic system
- Recorded Warranty Deed (obtainable from the Madison County Clerk's Office); if applicant is not the legal owner, a notarized Affidavit of Legal Interest is required
- Site Plan showing setbacks, well, septic, property lines, and driveway(s)
- Copy of the Building Contractor's State of Idaho Registration, unless the project is owner-built
- One electronic copy (PDF) and/or one physical copy of plans, drawn to scale (minimum 1/8" = 1'-0"), formatted on 11"x17" paper, including: cross sections, elevations, full foundation drawing, window & door schedule, engineered truss design, engineered floor layout design
- Open spaces exceeding 900 sq ft require engineered plans per IRC Table R602.10.1.3 (seismic bracing), as determined by the Building Official
- Preliminary Elevation Certificate required before permit issuance if property is in a designated floodplain; Final Elevation Certificate required before Certificate of Occupancy
- Driveway Access Permit from the Madison County Road & Bridge Office
- Copy of subdivision covenants, if applicable
- Energy code compliance via prescriptive method (Prescriptive Path form in application) or REScheck analysis (Climate Zone 6B)
- Non-refundable Permit Fee Deposit due at submittal: $100 for accessory structures, $500 for non-accessory structures (including dwellings) — applied toward the total permit fee if approved
- Additional approvals may be required: Administrative Permit/ADU approval from Planning & Zoning (for more than one dwelling unit on a parcel), Fire Marshal review for properties with significant slopes, Army Corps of Engineers permits for wetlands, Road & Bridge/Corps approval for bridges
- Electrical and plumbing work requires a SEPARATE permit through the City of Rexburg Building Department (contracted electrical inspection authority per I.C. 54-1001) — NOT issued by Madison County
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Site plan and foundation verified per approved plans before concealment
- 2
Framing
After framing, sheathing, and rough-in trades complete, before insulation or wall cover
- 3
Final
All work complete per approved plans; permit number and site address must be posted and visible from the roadway prior to inspection or the inspection fails/is not carried out
See the full Unincorporated Madison County inspection guide — scheduling & re-inspection fees →
Tips
- Electrical and plumbing permits are NOT issued by Madison County — they are handled by the City of Rexburg Building Department under a county-city inspection contract (Idaho Code 54-1001). Apply via https://apply.rexburg.org/publicapp/.
- Any open space over 900 sq ft (e.g., great rooms, large garages, shops) triggers a requirement for engineered plans per IRC Table R602.10.1.3 seismic bracing provisions.
- The $500 (or $100 accessory) deposit is non-refundable but is credited toward your final permit fee if the permit is approved and issued.
- Occupying a structure before final inspection approval or written Building Official authorization can trigger a fine equal to the total building permit fee, and a Certificate of Occupancy will not issue until fines/fees are paid in full (2018 IRC Sections R110.1, R113.2, R113.4).
- Applications can be started through the county's online Building Permit Portal (iworq) with PDF plan uploads, separated by project type.
- The 10-working-day review clock begins only once the application is deemed complete — incomplete applications are not accepted into the queue.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Madison County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Madison County
Residential Building Permit (New Construction / Addition / Accessory Structure) in other cities
Look up this fee in a different city →
Now live
Build your Unincorporated Madison County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Madison County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →