EV Charger / EVSE Permit — Malad City, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://dopl.idaho.gov/wp-content/uploads/2023/11/ELE-Home-Owner-Electrical-Permit-Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Malad City, Idaho
Installing a Level 1/Level 2 EV charging circuit in Malad City is purely electrical work. Because Malad City has not independently certified its own electrical program (the same situation documented in the solar-pv-permit entry), the electrical permit is issued directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City — no separate City permit applies unless the installation also involves structural/panel-enclosure work. No EV-charger-specific line item exists on DOPL's published fee worksheet; a charger circuit added to an existing home is billed under DOPL's general 'Existing Residence' branch-circuit fee.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required from the State of Idaho DOPL for the EV charger circuit/panel work — obtained via dbs.idaho.gov (all permits purchased online as of January 1, 2023)
- Homeowners performing their own work on a primary/secondary residence may use DOPL's Homeowner Permit process; otherwise a licensed electrical contractor must pull the permit
- No City of Malad building permit applies to a stand-alone EV charger circuit with no structural scope; if the installation is part of a larger project involving new construction or an addition, the City's residential-building-permit process under Ordinance No. 484 would also apply to that structural scope
- All work must be inspected by DOPL's assigned state trade inspector for the Malad City area
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection (State of Idaho)
Circuit wiring, breaker/panel sizing, and disconnect placement inspected by DOPL's assigned state trade inspector for the Malad City/Oneida County area
See the full Malad City inspection guide — scheduling & re-inspection fees →
Tips
- There is no City of Malad EV-charger permit — a stand-alone charger circuit is handled entirely through the State of Idaho DOPL electrical permit process, the same agency that handles the electrical/interconnection scope of solar installations in Malad.
- Use DOPL's 'Existing Residence' fee category — $65 base plus $10 per additional branch circuit — for a typical retrofit charger install.
- All DOPL permits must be purchased online at dbs.idaho.gov.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Malad City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Malad City's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Malad City yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Malad City lands. Privacy.
Other permits in Malad City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →