Residential Building Permit (New Construction / Addition / Accessory) — Malad City, Idaho · Requirements sheet
Reviewed 2026-07-08 · Source: https://www.maladidaho.org/wp-content/uploads/2025/03/Building-permit-Application-Residential-Malad-City-1.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction / Addition / Accessory) in Malad City, Idaho
Required for new single-family residential construction, additions, and accessory structures within Malad City limits. Issued by the City of Malad under Ordinance No. 484, which adopts the 2018 IBC, 2020 Idaho Residential Code, 2020 Idaho Energy Conservation Code, and 2018 Idaho Existing Building Code as the City's official building codes. Architect and engineering drawings are required with every application.
Reviewed 2026-07-08 · Source
When you need this permit
- Architect & engineering drawings are required for all residential permit applications (stated on the application form itself)
- Applicant must state Idaho Contractor's Number or claim an exemption per Idaho Code 54-5209 / 54-5205
- Class of work must be identified: New, Addition, or Accessory
- Type of structure (masonry, wood frame, log, metal) and square footage by floor/area must be itemized on the application
- Wood stove/fireplace installation must be disclosed on the application
- Water and sewer approval are required sign-offs on the same permit form before final approval
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
No standalone published valuation-based fee table (e.g., a Table 1-A) exists on the City of Malad website, in Malad City Council budget documents, in Ordinance 484, or in Oneida County's published… Show full citationHide
No standalone published valuation-based fee table (e.g., a Table 1-A) exists on the City of Malad website, in Malad City Council budget documents, in Ordinance 484, or in Oneida County's published Planning & Zoning fee schedule (which covers only P&Z land-use fees, not building permits). The City's FY2023-24 budget shows a dedicated "Licenses & Permits" General Fund revenue line ($13,500 projected) and a dedicated "Building Inspector" expense line ($35,000 projected), confirming the City independently budgets for and collects building permit revenue, but does not itemize a per-project fee table. Idaho DOPL's fee tables apply only to jurisdictions where the state administers permitting by default (i.e., where no local government has opted in) — Malad has opted in via Ordinance 484, so the state fee table is not the applicable schedule here. The gap holds across every other published avenue: the City's Documents & Forms and Licenses & Permits pages carry no additional fee PDFs, the Services and City Government pages have no fee-schedule link, ten months of City Council agendas/minutes (Aug. 2025-Jun. 2026, including the Aug. 13, 2025 and Sept. 3, 2025 FY2025-26 budget-adoption meetings) mention no fee resolution or building-permit-fee line item, Malad's code is not hosted on Sterling Codifiers, Municode, or American Legal Publishing (no codified fee appendix exists to check), and the only archived snapshot of the Licenses & Permits page (Dec. 11, 2023) matches current content with no fee table. Applicants should confirm the exact fee with the City at (208) 766-4160 before applying.Review timeline
Inspection process
- 1
Foundation / Footings
Before concrete pour, per standard IBC/IRC practice adopted by Ordinance 484
- 2
Framing
After framing and rough-in trades, before insulation or wall cover
- 3
Water Approval
Water service/connection sign-off required on the permit form prior to final approval
- 4
Sewer Approval
Sewer service/connection sign-off required on the permit form prior to final approval
- 5
Final
Final sign-off by the Building Inspector and City Superintendent on the permit application
See the full Malad City inspection guide — scheduling & re-inspection fees →
Tips
- Architect and engineering drawings are explicitly required with every residential permit application — this is stated in bold on the City's own application form, unlike many small-city forms that only require them for larger projects.
- The permit becomes null and void if work does not commence within 180 days of issuance; the completion time limit is 12 months, with a 6-month extension available through the Commission for a Council-set fee.
- The application requires disclosure of a wood stove or fireplace installation as a yes/no line item.
- Both a Building Inspector sign-off AND a City Superintendent sign-off are required on the face of the permit — plan for both approvals, not just an inspector review.
- Water Approved and Sewer Approved are both required sign-off lines on the same building permit application — coordinate with Malad City's utility billing/public works function before final approval.
- The City's building inspection service is shared with Oneida County (same inspector, Tory Richardson, serves both the City's Building Inspector role and the County's Building Inspector Department, which is physically headquartered at 30 North 100 West Suite 2, Malad City) — but the City pays for and budgets its own building inspection expense line separately from the County, and issues its own permits under its own ordinance.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Malad City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Malad City's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Malad City yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Malad City lands. Privacy.
Other permits in Malad City
Residential Building Permit (New Construction / Addition / Accessory) in other cities
Compare residential building permit (new construction / addition / accessory) fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Malad City project checklist
Describe your project once and get every permit, document, and fee it triggers in Malad City — in one checklist. Free, for any city and any number of projects.
Get started →