Malad City building permits
Department contacts, adopted codes, permit types, fees, and gotchas for Malad City, Idaho.
Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 59 Bannock Street, Malad, Idaho 83252
- Phone
- (208) 766-4160
- Office hours
- Website
- Official site
Inspection guide
See how inspections work in Malad City — sequence, scheduling & re-inspection fees.
Codes adopted
Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.
- 2018 International Building Code (IBC), as adopted by the State of Idaho / Idaho Building Code Board, with any amendments made through the negotiated rulemaking process
- 2020 Idaho Residential Code (based on the 2018 International Residential Code, amended by the Idaho Building Code Board)
- 2020 Idaho Energy Conservation Code (based on the 2018 International Energy Conservation Code, amended by the Idaho Building Code Board)
- 2018 Idaho Existing Building Code (based on the 2018 International Existing Building Code, amended by the Idaho Building Code Board)
- Malad City Ordinance No. 484 (adopted December 9, 2020) — the ordinance that formally adopts the above codes as the official building codes of the City of Malad
Permit types & fees
Residential Building Permit (New Construction / Addition / Accessory)
Required for new single-family residential construction, additions, and accessory structures within Malad City limits. Issued by the City of Malad under Ordinance No. 484, which adopts the 2018 IBC, 2020 Idaho Residential Code, 2020 Idaho Energy Conservation Code, and 2018 Idaho Existing Building Code as the City's official building codes. Architect and engineering drawings are required with every application.
Solar PV Permit
Required for installation of rooftop or ground-mounted solar photovoltaic systems within Malad City limits. The structural/racking scope is permitted by the City of Malad under Ordinance No. 484 (the same case-by-case-fee building permit process used for other residential/commercial construction); the electrical interconnection is separately permitted and inspected by the State of Idaho Division of Occupational and Professional Licenses (DOPL), since Malad City has not independently certified its own electrical program.
EV Charger / EVSE Permit
Installing a Level 1/Level 2 EV charging circuit in Malad City is purely electrical work. Because Malad City has not independently certified its own electrical program (the same situation documented in this file's solar-pv-permit entry), the electrical permit is issued directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City — no separate City permit applies unless the installation also involves structural/panel-enclosure work. No EV-charger-specific line item exists on DOPL's published fee worksheet; a charger circuit added to an existing home is billed under DOPL's general 'Existing Residence' branch-circuit fee.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- No data reported
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity
Tips & gotchas
- Malad City's Building Inspector Department is co-located with, and shares its inspector personnel with, Oneida County's Building Inspector Department (both offices operate out of/near Malad City, and Tory Richardson has been documented serving in a building-inspector capacity for both). Do not mistake this shared-personnel arrangement for county control — Malad City retains independent statutory authority via its own ordinance, budget, and application forms.
- Malad City requires architect and engineering drawings for every residential building permit application — this is a stricter documentation requirement than many similarly-sized Idaho cities.
- Both a Building Inspector and a City Superintendent sign-off are required on the face of every Malad City building permit, along with separate Water Approved and Sewer Approved sign-offs.
- Idaho state law (not the City) governs electrical and plumbing trade licensing and inspection statewide through DOPL; Malad City-issued building permits still coordinate with DOPL-assigned trade inspectors for those sub-trades.
- No published dollar-amount fee table exists on the City's own website; fees are set per-project. Call (208) 766-4160 to confirm cost before applying.
- Agricultural buildings are exempt from the City's adopted building codes (Ordinance 484, Section 3) but remain subject to zoning placement rules and zoning permits.