Skip to main content
PermitBase

Soda Springs building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Soda Springs, Idaho.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
9 West 2nd South, Soda Springs, ID 83276
Phone
(208) 547-2600
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Soda Springs — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC)
  • 2018 International Residential Code (IRC)
  • Idaho Manufactured Home Installation Standard (state) — for mobile/manufactured home installations

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
0units

0 buildings · $0 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • Soda Springs is the Caribou County seat and shares an address (159 S Main St / nearby City Hall at 9 West 2nd South) with county offices, which can make it look county-administered — but the city runs its own building permit program under City Code Title 15, its own adopted 2018 IBC/IRC with local amendments, and its own Council-adopted fee resolution.
  • Caribou County's Planning & Zoning office (Helen Barker, Administrator) handles permits for unincorporated Caribou County and county address assignments — it is a separate authority from the City of Soda Springs' own Planning & Zoning/Building Inspection department (Alan Skinner, Building Inspector).
  • Local structural design amendments are stricter than many nearby Idaho jurisdictions: 36-inch minimum footings, 60 PSF roof snow load, 115 MPH 3-second-gust wind, and Seismic Design Category D1 (Earthquake Zone D1).
  • No published day-count review-timeline SLA exists for Soda Springs' building permit process as of 2026-07-08 — confirm expected turnaround directly with the Building Inspector for time-sensitive projects.
  • Sidewalk, curb, and gutter construction is required along the street frontage of the lot before a certificate of occupancy is issued (City Code 12.08.040) — budget for this if your lot doesn't already have it.

Related guides

Comparable nearby cities

Caldwell
3 shared permit typesBoth on the 2018 International Building Code (IBC)
Compare fees →
Cascade
3 shared permit typesBoth on the 2018 International Building Code (IBC)
Compare fees →
Donnelly
3 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →