EV Charger / EVSE Permit in Soda Springs, Idaho
The City of Soda Springs has no separate electric-vehicle-charging-station permit, checkbox, or fee line. Unlike solar (which has its own dedicated 'Solar System Install' checkbox and City Code chapter, 13.24), an EV charger installation is not called out anywhere on the City's Building Permit Application form or Master Fee Schedule (Resolution No. 2026-2). As electrical work altering a structure's electrical system, it is billed under the same general valuation-based Building Permit Fee Schedule used for all other construction, with fees computed from the project's stated valuation (e.g., cost of the charger unit, panel upgrade, and installation labor).
Verified 2026-07-20 · Source
When you need this permit
- Submit the City's standard Building Permit Application to City Hall, 9 West 2nd South — no dedicated EV/EVSE checkbox exists on the form, unlike the dedicated 'Solar System Install' box
- Dig Line (1-800-342-1585) utility locate required prior to any excavation for conduit runs
- Plans must meet the City's adopted 2018 IBC/IRC and local amendments
- Fee computed from the general valuation-based Building Permit Fee Schedule based on the stated project valuation (charger unit, any panel upgrade, and installation cost)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Soda Springs inspection guide — scheduling & re-inspection fees →
Tips
- Unlike solar, which has its own dedicated 'Solar System Install' checkbox and City Code chapter (13.24), Soda Springs has no distinct EV charger category on its Building Permit Application — it is filed as ordinary electrical/construction work under the general valuation-based fee table.
- Budget the permit fee off your project's stated valuation (charger equipment plus any panel upgrade and labor cost) using the City's tiered Building Permit Fee Schedule ($25 flat up to $500 valuation, then $25 + $2/additional $100 up to $2,000, then $48.50 + $10/additional $1,000 up to $25,000) — not a flat EV-specific fee, since there isn't one published.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Soda Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Soda Springs
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Soda Springs project checklist
Describe your project once and get every permit, document, and fee it triggers in Soda Springs — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →