Kimberly building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Kimberly, Idaho.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
242 Highway 30 E, Kimberly, ID 83341
Phone
208-423-4151 Ext. 17
Office hours
Monday through Friday, 8:00 AM to 5:00 PM

Published scheduling rules

  • Inspections are scheduled through DOPL's own system and performed by a DOPL-assigned inspector (EV Charger / EVSE Permit)
  • All inspection requests require 24-hour advance notice, Monday through Thursday; inspections requested on Friday are normally performed the following Monday. (General)

Inspection sequence

Applies to: Building Permit (New Construction, Additions, Remodels, Repairs, Demolition, Re-Roof)

  1. 1

    Setback

    Verify building location against required and stated setbacks before further work

  2. 2

    Footing

    Before concrete pour; UFER ground option noted on the fee worksheet

  3. 3

    Foundation

    Foundation inspection prior to backfill

  4. 4

    Frame

    After framing and rough-in trades are complete, before insulation or wall cover

  5. 5

    Insulation

    Insulation inspection before drywall

  6. 6

    Drywall (shear/fire)

    Shear wall and fire-rated assembly inspection at drywall stage

  7. 7

    Final

    Final inspection by the Kimberly Building Official; cannot be scheduled until the State of Idaho electrical, plumbing, and HVAC inspectors have signed off. A separate Public Works final inspection of sidewalks, water meter vaults, and meters follows before a Certificate of Occupancy is issued.

Applies to: Manufactured Home Building Permit

  1. 1

    Setback

    Verify placement against required and stated setbacks

  2. 2

    Footing

    UFER ground option noted on the fee worksheet

  3. 3

    Foundation

    Required only for permanent-foundation placements

  4. 4

    Frame

    Framing inspection for any attached structures

  5. 5

    Insulation

    Insulation inspection for attached structures/additions

  6. 6

    Drywall (shear/fire)

    Shear wall/fire-rated assembly inspection where applicable

  7. 7

    Final

    Final inspection; all permits expire 180 days after issuance or last inspection

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Setback

    Verify solar array/racking location against required setbacks

  2. 2

    Final

    Structural attachment and completed installation verified per approved plans

Final inspection only: EV Charger / EVSE Permit

Kimberly building permits

Get alerts for Kimberly

We'll email you when Kimberly's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.