Solar Photovoltaic (PV) Permit — Kimberly, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://cityofkimberly.org/488/Applications-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Photovoltaic (PV) Permit in Kimberly, Idaho
Required for rooftop or ground-mounted solar photovoltaic installations within the City of Kimberly. The City's own Residential-Commercial Application for Building Permit has no dedicated 'Solar' Class of Work checkbox (its listed categories are New Development, Accessory Structure, Alteration/Remodel, Addition, Repair, Demolish, Re-Roof, Sign, Fence, and Tenant Improvement) — a solar installation's structural/mounting portion is submitted under the closest applicable category (typically Addition or Alteration/Remodel) on that same combined form, valued at the City's published per-square-foot building valuation rate. No separate flat or per-panel solar fee line was located.
Verified 2026-07-20 · Source
When you need this permit
- Building permit required for the structural/mounting portion of a solar PV installation, submitted on the City's Residential-Commercial Application for Building Permit with the closest applicable Class of Work checked (Addition or Alteration/Remodel), since no dedicated Solar checkbox exists
- Two (2) complete hard copy sets of building plans (minimum size 11" x 17") delivered to City Hall, plus a digital copy emailed to ceckles@cityofkimberly.org and jtaylor@cityofkimberly.org (effective 02-09-2026 policy)
- Site plan and construction details showing panel/array layout, mounting/racking attachment, and structural connection sufficient for building-valuation and plan-review purposes
- State Contractor Registration number (or Idaho Registration Exempt status) for the installer Contractor
- Electrical, plumbing and mechanical trade permitting is not itemized as a City of Kimberly permit type in any published form. Electrical interconnection work is issued and inspected by the State of Idaho (Division of Occupational and Professional Licenses / Idaho Building Safety, 1-800-955-3044, dbs.idaho.gov) rather than the City — consistent with the absence of any electrical permit on the City's own Applications/Permits page (cityofkimberly.org/488/Applications-Permits), which lists Building, Manufactured Home, Sign, Special Use, Variance and Demolition permits only.
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
IDAPA 24.39.10 (Rules of the Idaho Electrical Board), Rule 500.02.b, current administrative rule as amended through 4-4-25 (adminrules.idaho.gov/rules/current/24/243910.pdf). Show full citationHide
IDAPA 24.39.10 (Rules of the Idaho Electrical Board), Rule 500.02.b, current administrative rule as amended through 4-4-25 (adminrules.idaho.gov/rules/current/24/243910.pdf). Kimberly's own Applications/Permits page (cityofkimberly.org/488/Applications-Permits) lists Building, Manufactured Home, Sign, Special Use, Variance, and Demolition permits but no electrical permit of any kind, so electrical trade work is not separately permitted by the City and falls to the statewide DOPL framework.Review timeline
Inspection process
- 1
Setback
Verify solar array/racking location against required setbacks
- 2
Final
Structural attachment and completed installation verified per approved plans
See the full Kimberly inspection guide — scheduling & re-inspection fees →
Tips
- Kimberly's permit application has no dedicated 'Solar' checkbox — confirm with City Hall which Class of Work category (Addition vs. Alteration/Remodel) they want a solar project filed under before submitting.
- No solar-specific valuation rate is published; the closest applicable per-square-foot rate (e.g., U-1 utility/accessory at $36.00/sq ft) would likely apply to the panel/array footprint, but this was not independently confirmed by the City for solar specifically — call ahead to confirm.
- Electrical, plumbing and mechanical trade permits are not itemized anywhere in Kimberly's own published permit materials. The electrical interconnection is most likely a State of Idaho DOPL permit rather than a City permit, but that is not confirmed in writing for Kimberly — check directly with City Hall (208-423-4151) before assuming.
- The electrical-interconnection portion of a Kimberly solar project falls under Idaho DOPL's statewide "Other Installation (Including Industrial and Commercial)" fee schedule (IDAPA 24.39.10, Rule 500.02.b): $60 plus 2% of wiring cost up to $10,000, scaling from there — confirmed by the absence of any City electrical permit on Kimberly's Applications/Permits page.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kimberly building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kimberly's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Kimberly yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Kimberly lands. Privacy.
Other permits in Kimberly
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Idaho →
Look up this fee in a different city →