Manufactured Home Building Permit in Kimberly, Idaho
Required for placement of a manufactured home in the City of Kimberly, whether on a permanent or temporary foundation, including attached garages, carports, or covered patios/porches/decks. Manufactured homes placed before June 15, 1976 must meet State Rehabilitation Standards and a State Certificate must be submitted.
Verified 2026-07-07 · Source
When you need this permit
- Manufactured Home Building Permit Application, completed and signed
- Copy of Deed and/or Title with legal description (not required if the home is sited in a mobile home park)
- 2 sets of plans to scale (not required for a temporary-set foundation with no attached structures), including site plan, floor plans, completed RES check or prescriptive energy compliance, elevations, footings and foundation, typical construction details, and truss/floor joist details for additions to manufactured homes
- Site plan must show all buildings, property boundaries, and easements, and be stamped by South Central Health District if located in its impact area
- Homes originally manufactured before June 15, 1976 must meet State Rehabilitation Standards and the owner must submit the State Certificate
- Construction Water Deposit Form required for new development
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Setback
Verify placement against required and stated setbacks
- 2
Footing
UFER ground option noted on the fee worksheet
- 3
Foundation
Required only for permanent-foundation placements
- 4
Frame
Framing inspection for any attached structures
- 5
Insulation
Insulation inspection for attached structures/additions
- 6
Drywall (shear/fire)
Shear wall/fire-rated assembly inspection where applicable
- 7
Final
Final inspection; all permits expire 180 days after issuance or last inspection
See the full Kimberly inspection guide — scheduling & re-inspection fees →
Tips
- All permits expire 180 days after issuance or last inspection.
- A temporary-set foundation with no attached structures does not require 2 sets of scaled plans or a site plan, simplifying the submittal.
- Manufactured homes built before June 15, 1976 must meet State Rehabilitation Standards, verified by a State Certificate submitted with the application.
- If the home site is within the South Central Health District's impact area, the site plan must be stamped by that district.
- A copy of the Deed/Title is waived if the home is being sited within a mobile home park.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kimberly building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kimberly
Compare manufactured home building permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Kimberly project checklist
Describe your project once and get every permit, document, and fee it triggers in Kimberly — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →