Residential Building Permit (New Construction / Addition) in Unincorporated Twin Falls County, Idaho
Required for new single-family dwellings, additions, garages, carports, covered decks/patios, and manufactured home placements in unincorporated Twin Falls County. Twin Falls County Community Development Services — Building Department reviews plans and issues permits under the 2018 IBC/IRC with Idaho Amendments. Applications may be submitted by email/upload or through the Citizens Connect permit portal.
Verified 2026-07-08 · Source
When you need this permit
- Building permit required for new residential construction, additions, garages/carports, covered decks/patios, and any deck with a walking surface more than 30 inches above grade
- Parcel number (obtained from the County Assessor's Office)
- Copy of the deed showing ownership, including legal description (obtained from the County Clerk's Office)
- Authorization Form signed by the property owner if the applicant is not the owner
- Two (2) sets of plans drawn to 1/4 inch = 1'0" scale (or computer-generated plans at not less than 1/8 inch = 1'0"), submitted as a PDF for digital submittal
- Site plan showing property lines, lot dimensions, survey corner stakes, easements, rights-of-way, well/septic locations, all existing structures, proposed structure with dimensions and setbacks, driveway, and surface drainage
- Two (2) site plans stamped approved by the South Central Public Health District
- Building plans: footing/foundation plan with reinforcement, floor plan, egress window/smoke/CO detector locations, floor framing, crawlspace venting, beam/header sizing, stair details, wall shear bracing, elevations (minimum 2), and a completed energy conservation certification (RESCheck or prescriptive)
- Highway District, Canal Company, and Fire District approval/comment letters
- FEMA Elevation Certificate required before permit issuance if the parcel is within 100 feet of a major waterway (and again before final inspection)
- Architect/engineer-stamped plans required only if the building is more than two stories or of unusual design requiring professional structural assistance
- Plan Review Fee (35% of the building permit fee, or $100, whichever is greater) is due at time of submittal and is non-refundable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing / Foundation
Setback verification requires property pins located and property lines clearly marked; request by phone 24/7 at 208-734-9490 ext. 1 — requests received by 9:00 AM are generally completed same day, after 9:00 AM scheduled for next workday
- 2
Framing
Requires all plumbing, electrical, gas, and mechanical rough-in inspections to be completed and signed off on the construction card by the State of Idaho (DOPL/Division of Building Safety) first
- 3
Final
Requires all plumbing, electrical, gas, mechanical, fireplace, and firewall/sprinkler final inspections signed off by the State of Idaho first. Certificate of Occupancy/Occupancy Approval issued only after all required inspections pass.
See the full Unincorporated Twin Falls County inspection guide — scheduling & re-inspection fees →
Tips
- The county's own handout states: 'The estimated time for a residential plan review is usually not more than seven business days,' contingent on submitting complete plans and all required supporting documents.
- Electrical and Plumbing permits are issued by the Idaho Division of Building Safety (state), not Twin Falls County — call 1-800-955-3044 or visit dbs.idaho.gov. Mechanical/HVAC permits, however, ARE issued directly by Twin Falls County.
- Building permits expire 180 days after issuance or the date of the last inspection — track your own inspection schedule to avoid expiration.
- A FEMA Elevation Certificate is required before permit issuance for any parcel within 100 feet of a major waterway, and a second certificate is required before final inspection.
- Canyon rim setback is 100 feet from the rim for any structure — this is stricter than the standard property-line setback.
- No structure may be placed within 6 feet of another structure or within a recorded easement — always check the plat map and legal description.
- Accessory structures under 200 square feet accessory to a residence do NOT require a building permit; carports, garages, and decks with a walking surface over 30 inches above grade DO require one.
- Inspection requests can be made 24/7 by phone; those received by 9:00 AM are generally completed the same day.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Twin Falls County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Twin Falls County
Residential Building Permit (New Construction / Addition) in other cities
Compare residential building permit (new construction / addition) fees across Idaho →
Look up this fee in a different city →