Solar Photovoltaic (PV) Permit in Hardin, Montana
Required for installation of rooftop or ground-mount solar photovoltaic systems within Hardin city limits. For a RESIDENTIAL installation: a City Building Permit (structural/racking, issued by the City's Building Inspectors) plus a State of Montana Electrical Permit (wiring/interconnection) -- Hardin is city-certified for residential Building permits only. For a COMMERCIAL installation: BOTH the building permit and the electrical permit are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, since Hardin's local certification does not extend to commercial building work or to any electrical/plumbing/mechanical permits of any project type.
Verified 2026-07-20 · Source
When you need this permit
- Residential solar: City Building Permit Application (structural/racking scope) submitted to City Building Inspectors Joe Connelly or Nathan McConnell
- Residential solar electrical scope: State of Montana Application for Residential Contractor Electrical Permit -- Hardin is not certified for electrical permitting of any project type
- Commercial solar: BOTH the building permit and electrical permit are issued directly by the Montana Building Codes Bureau, not the City, per Hardin's certification (residential building only)
- Licensed electrical contractors select 'Solar' as the Alternative Energy Source on the state electrical application and specify Micro Inverter/AC Module System or PV String System, and whether the system produces 90 or more volts
- Non-electrician installers submit the state's Alternate Energy Permit instead of the standard contractor electrical permit, per Montana Building Codes Bureau Alternative Energy Information guidance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Performed by the Montana Building Codes Bureau's regional electrical inspector; wiring, disconnect placement, and interconnection point verified before energizing
- 2
City Final Inspection (Building, residential only)
Racking/roof-penetration attachment and structural compliance verified by a City Building Inspector for residential projects
Tips
- Hardin splits solar permitting depending on whether the project is residential or commercial: residential building permits are issued by the City, but ALL electrical permits (residential and commercial) and ALL commercial building permits are issued directly by the State of Montana Building Codes Bureau, not the City.
- On the state electrical permit application, check 'Yes' to the Alternative Energy Source question and specify Solar plus your system type -- this determines how the application is processed.
- The City's own residential building-permit fee schedule is not published in any document found online as of this review -- get a written quote directly from the Building Department before budgeting.
- You can apply for the state electrical or commercial building permit online at ebiz.mt.gov/bcb rather than mailing a paper form, or contact the regional state building inspector to review plans onsite for a faster commercial-building turnaround than the 2-3 week Helena mail-in review.
- Re-chase pass (2026-07-20): downloaded and read the current (Rev 6/24) Application for Residential Contractor Electrical Permit and Application for Commercial Electrical Permit PDFs directly from bsd.dli.mt.gov — both are live today and match this entry's figures exactly (line K 'Alternative Energy' = $45 flat on the residential form; the $45/$75/$255/$455 tiered commercial schedule verbatim, including the $60 renewal/request-inspection fees). Cross-checked against ARM 24.301.461(1)(o), the codified administrative rule, which lists a separate $65 flat fee for 'Renewable energy system: net metering system or off-grid electrical generating system (photovoltaic (PV) system, wind generator, hydro turbine, etc.)' -- this figure differs from the application forms and was not found reflected on either current PDF, so the live application-form figures (what an applicant actually submits and pays against) are treated as the controlling, currently-charged fee; the ARM figure is noted here for a future re-chase in case DLI updates its forms to match the rule text.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hardin building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hardin
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Hardin project checklist
Describe your project once and get every permit, document, and fee it triggers in Hardin — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →