Commercial Building Permit (New Construction, Additions & Tenant Improvements) in Great Falls, Montana
Required for new commercial construction, commercial additions, and multifamily buildings in Great Falls, using the City's own Commercial Building Permit Application; an interior tenant-improvement (TI) remodel of existing commercial space uses a separate Commercial Tenant Improvement Building Permit Application and checklist instead. Reviewed by the City of Great Falls Planning & Community Development Building Division under the 2021 IBC and 2021 IEBC as locally adopted. Great Falls is certified by the Montana Department of Labor & Industry's Building Codes Bureau to enforce its own local Building code within city limits, so the City itself -- not the state Building Codes Bureau -- reviews and issues this permit; unincorporated Cascade County outside city limits falls under direct State Building Codes Bureau enforcement instead. Commercial plan review is billed at 65% of the Building Permit Fee, versus 50% for residential, per the City's currently posted Building Fee Schedule. Fire suppression, fire alarm, and kitchen hood suppression systems are permitted separately from this building permit, through Great Falls Fire Rescue.
Verified 2026-08-26 · Source
When you need this permit
- Building permit and plan review required for new commercial construction, commercial additions, and multifamily buildings, per OCCGF Title 15 and 2021 IBC Section 107 as locally adopted
- Great Falls is a Montana DLI-certified local building program (Building, Plumbing including Medical Gas, Electrical, Mechanical, Swimming Pool, and Wildland-Urban Interface) within city limits -- projects outside city limits in unincorporated Cascade County fall under direct Montana DLI Building Codes Bureau enforcement instead of the City's
- Application must declare project type (New, Addition, or Multifamily), Construction Type, Occupancy Type, and whether the project includes a fire sprinkler system
- Address must be assigned by Mapping & Addressing (406-455-8437) prior to application submittal
- Complete construction documents stamped and signed by a Montana-licensed design professional: cover sheet, code analysis, and sheet index; civil, architectural, mechanical, plumbing, and electrical drawings with energy code analysis; site accessibility requirements; a photometric plan; a landscape plan; minimum paper size 11" x 17", marked "Building Permit Set"
- A project-specific geotechnical soils report, signed and stamped by a Montana-licensed design professional, is required for new commercial construction
- Fire suppression, fire alarm, and kitchen hood suppression systems require a separate application processed by Great Falls Fire Rescue -- they are not part of this building permit submittal, and plans for them may be deferred only with pre-approval from the Building Division
- An interior tenant-improvement (TI) remodel of existing commercial space uses a separate Commercial Tenant Improvement Building Permit Application and Building TI Permit Checklist, rather than the new-construction/addition application
- Depending on project scope, additional environmental submittals may be required: a stormwater management maintenance agreement, an Industrial Pretreatment Survey or permit, or Fats-Oils-and-Grease control plans for food service establishments, coffee shops, and kiosks
- Site-development projects also require engineering submittals stamped by a Montana-licensed Professional Engineer: civil plans and specifications, pavement/roadway design, a sanitary sewer design report, a water design report, and storm drainage plans and design report
- A Dust Control Plan is required for all projects except interior remodels; a Stormwater Pollution Prevention Plan (SWPPP) is required for projects disturbing 10,000 sq ft or more
- A written letter of authorization from the property owner is required if the applicant is not the owner
- The applicant is responsible for the plan review fee if the application is deemed abandoned after 180 days
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footings
Before concrete pour, per geotechnical report and structural plans (new construction and additions)
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, and mechanical rough-in before walls closed; separate trade permits required
- 4
Fire Suppression / Alarm Acceptance (if applicable)
Conducted by Great Falls Fire Rescue under the separate Fire Sprinkler/Alarm Permit, not this building permit
- 5
Final / Certificate of Occupancy
All work complete per approved plans; Certificate of Occupancy issued by the Building Official
See the full Great Falls inspection guide — scheduling & re-inspection fees →
Tips
- Great Falls' own Building Fee Schedule (effective 10/5/2023) bills commercial plan review at 65% of the Building Permit Fee, versus 50% for residential -- both administered by the City itself, since Great Falls is a Montana DLI-certified local building program for Building code enforcement within city limits.
- Fire suppression, fire alarm, and kitchen hood suppression permits are processed separately by Great Falls Fire Rescue (406-727-8070), not through this building permit -- see this jurisdiction's Fire Sprinkler/Alarm Permit for GFFR's own fee schedule and acceptance-testing process.
- An interior tenant-improvement (TI) remodel of existing commercial space uses a separate Commercial Tenant Improvement Building Permit Application and checklist, not the new-construction/addition application.
- The City has applied an automatic 2.5% annual increase to building permit fees each July 1 since 2011, paused only in years the Building Fund balance exceeds $600,000 as of June 30 -- use the currently posted fee schedule rather than an older cached figure.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Great Falls building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Great Falls.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Great Falls
Commercial Building Permit (New Construction, Additions & Tenant Improvements) in other cities
Look up this fee in a different city →
Now live
Build your Great Falls project checklist
Describe your project once and get every permit, document, and fee it triggers in Great Falls — in one checklist. Free, for any city and any number of projects.
Get started →