EV Charger Installation Permit (Trade Permit) in Whitefish, Montana
An electric vehicle charging station (Level 2 or DC fast charger) installation in Whitefish requires an Electrical Trade Permit for the circuit/interconnection work, issued directly by the City (Whitefish is DLI-certified for electrical (E) permitting), plus a Building Permit if a new canopy, carport, or structural mounting component is added — the same two-permit pattern already documented in this file's solar-pv-permit entry. No standalone EV-charger-specific application or fee schedule (of the kind some larger Montana cities publish) was found on the City of Whitefish's site.
Verified 2026-07-20 · Source
When you need this permit
- Trade Permit Application (electrical) required for the charger circuit, wiring, and interconnection, governed by the 2020 NEC as adopted by the City of Whitefish, since Whitefish is DLI-certified for electrical (E) permitting
- Building Permit Application (Residential or Commercial) additionally required if the installation includes a new canopy, carport, or other structural mounting component, per the City's standard building-permit process
- Application requires contractor information including State of Montana license number (Journeyman or Master) and city business license number, or homeowner self-install information where applicable
- Project valuation (cost for materials and labor) must be provided
- Applicant must certify no work will commence prior to permit issuance
- Submitted via the Citizen Portal (civicgov4.com/mt_whitefish/portal/) or by email to buildingdept@cityofwhitefish.gov
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring, box placement, and circuit/disconnect verified before walls are closed, where applicable
- 2
Final Electrical
Charger installed, connections verified; Final Electrical applies to services over 400 amp or any commercial installation per the Required Inspections List
See the full Whitefish inspection guide — scheduling & re-inspection fees →
Tips
- Because Whitefish is DLI-certified for electrical permitting, the EV-charger circuit permit is handled entirely by the City — no separate state Building Codes Bureau application is needed (unlike in a partially-certified city such as Havre).
- No standalone EV-charger-specific application, checklist, or fee schedule was found published on the City's site — use the same Trade Permit Application (electrical) process documented for this file's electrical-permit and solar-pv-permit entries.
- reviewTimelineDays is null (hard-unpublished): the City of Whitefish publishes no review turnaround for electrical trade permits (including EV-charger installs) on its Building Permits / Inspections page, Planning & Building page, FAQ, fee schedule, or Citizen Portal, and City Code 10-1-4/10-1-1 sets no review-day period. Because Whitefish is DLI-certified for Electrical (E), these permits are issued and reviewed by the City itself — they are NOT routed to the state DLI Building Codes Bureau in Helena, so the state's 'three weeks' plan-review figure (which applies only to state-administered permits) does not govern. Contact Planning & Building at (406) 863-2410 for current review timelines.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Whitefish building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Whitefish
EV Charger Installation Permit (Trade Permit) in other cities
Compare ev charger installation permit (trade permit) fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Whitefish project checklist
Describe your project once and get every permit, document, and fee it triggers in Whitefish — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →