EV Charger / EVSE Permit in Unincorporated Clark County, Nevada
Required for installing a Level 2 or DC fast EV charger's dedicated circuit or new electrical service in unincorporated Clark County. Clark County has no dedicated EV-charger Simple Online Permit category — the Building Simple Online Permit list for Electrical is limited to same-size panel replacement and test-and-tag (checked 2026-07-20). A new EVSE branch circuit is therefore processed as a standard (non-simple) Electrical Permit, billed under the Table 3-A valuation-based schedule referenced by Table 3-B for anything not itemized as a Simple Online Permit. Re-verified 2026-07-20: re-confirmed the Clark County Building & Fire Prevention permit page is live, and independently confirmed Clark County Code § 22.02.395 ('Table 3-B electrical permit fees') exists as its own indexed Municode section (library.municode.com/nv/clark_county/codes/code_of_ordinances?nodeId=TIT22BUCO_CH22.02BUADCOCLCO_22.02.395TA3-BELPEFE), corroborated further by the County's own live online Fee Calculator tool (aca-feecalc.clarkcountynv.gov/feecalcUI). No EV-specific line item exists, but the $54.00 Permit Issuance Fee (Table 3-B) is a genuine, citable, currently-applicable governing figure per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for every EV charger installation involving a new circuit, new 240V outlet, or panel/service upgrade — required for both Level 2 (240V) and DC fast charger installs
- A panel upgrade needed to support the EV charger circuit may separately qualify as a Simple Online Permit (Same-Size Panel Replacement) if it is a same-size, same-amperage swap; a capacity/amperage upgrade is a non-simple electrical project billed under Table 3-A
- Contractor must hold a valid Nevada State Contractors Board electrical license, or the property owner may self-perform as a homeowner-builder on their own residence Owner-builder
- Installation must comply with the 2023 NEC as adopted by Clark County
- New residential and commercial construction in Clark County is separately subject to the County's 'EV-Capable' infrastructure ordinance (approved by the Board of County Commissioners), which requires dedicated electrical capacity and conduit for future EV charging in parking spaces — a distinct requirement from a retrofit EVSE circuit permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Service
New circuit wiring or service/panel work verified before closing walls, if applicable
- 2
Final
EVSE equipment connection, breaker sizing, and GFCI protection (where required) verified per 2023 NEC
See the full Unincorporated Clark County inspection guide — scheduling & re-inspection fees →
Tips
- Clark County has no EV-charger-specific Simple Online Permit — a new EVSE circuit must go through the standard Electrical Permit application, not the instant online panel-replacement/test-and-tag path.
- If the charger requires only a same-size panel swap (no amperage increase), that portion may qualify separately for the Simple Online Same-Size Panel Replacement permit ($61.88–$119.16 depending on amperage per Table 3-B); a capacity upgrade does not qualify and is billed under Table 3-A instead.
- Don't confuse this retrofit EV charger circuit permit with Clark County's separate 'EV-Capable' new-construction ordinance, which requires builders to rough in conduit/capacity for future EV charging in new parking spaces — that's a design mandate on new buildings, not a fee schedule for adding a charger to an existing home.
- Re-confirmed 2026-07-20: Clark County Code § 22.02.395 (Table 3-B) is independently indexed at Municode and corroborated by the County's own live fee calculator; the $54.00 base Permit Issuance Fee remains the governing figure for an EV charger circuit permit, with the balance billed per Table 3-A valuation since EV chargers are not a Simple Online Permit category.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Clark County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Clark County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Clark County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Clark County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →