Skip to main content
PermitBase

Do I Need a Permit to Replace a Water Heater in Nevada?

Water heater replacement permit requirements. Yes, even for like-for-like swaps. What inspectors check and how to pass.

Yes — even for a like-for-like replacement.

Why a Simple Swap Needs a Permit

Most jurisdictions require a permit for all water heater replacements, even when you're installing the same type and size. The permit ensures proper venting, gas connections, temperature/pressure relief valve discharge, and seismic strapping. Improper water heater installations are a leading cause of residential CO poisoning and water damage.

What Inspectors Check

The inspector will verify: gas line connections and drip leg (sediment trap), proper venting (metal B-vent for standard, PVC for high-efficiency), T&P relief valve discharging to within 6 inches of the floor or exterior, seismic strapping (two straps — upper and lower third), and adequate combustion air supply.

Tankless Conversion

Converting from a tank to tankless water heater often requires additional work: a larger gas line (tankless units draw more BTUs), PVC venting (most tankless units are high-efficiency), and potentially an electrical outlet for the unit. This may trigger both plumbing and gas permits.

DIY vs. Hiring a Plumber

Many jurisdictions allow homeowners to replace their own water heater in their primary residence — confirm with your city. You still must pull the permit and pass inspection. Most homeowners hire a licensed plumber because the permit and inspection process is simpler when the contractor handles it.

Yes, you need a $40-$60 permit. It's a quick same-day approval and one final inspection. Don't skip it — it protects you and your home.

Permit fees by city in Nevada

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

29 rows

Permit fees by city in Nevada
Permit feeSource
Boulder City$40.00VerifiedPlumbing Permit →
CarlinSee city page for the current Residential Building Permit (New Construction / Addition / Remodel) feeResidential Building Permit (New Construction / Addition / Remodel) →
Carson CityVaries — valuation-based (1.5% of value, $65 min)VerifiedPlumbing Permit →
Douglas County$89.93 (flat fee)VerifiedPlumbing Permit →
Elko$40.00VerifiedPlumbing Permit →
ElySee city page for the current Plumbing Permit feePlumbing Permit →
FallonNot published — the UPC's standard Table 104.5 fee schedule was replaced by the City's own 'Table B' per City Code § 17.04.020(G)(1), but the substituted table's dollar amounts were not published in the Municode-hosted ordinance text or found elsewhere on the City's websiteVerifiedPlumbing Permit →
Fernley$80VerifiedPlumbing Permit →
Henderson$81VerifiedPlumbing Permit →
Lander County (including Battle Mountain)Based on project valuation per 1997 UBC Table 1-A; no dollar-figure fee table publishedVerifiedPlumbing Permit →
Las Vegas$22 inspection only (no plan check required)VerifiedPlumbing Permit →
Lyon County$160.00 flatVerifiedPlumbing Permit (Water Lateral / Sewer Lateral / Septic) →
MesquiteSquare footage × $0.045VerifiedPlumbing Permit →
North Las Vegas$75 per permitVerifiedPlumbing Permit →
Nye County (Unincorporated, incl. Pahrump)Not published as an itemized dollar table on the Nye County Building Department's public websiteVerifiedPlumbing Permit →
Pershing County (includes Lovelock)$67.00 per square footVerifiedvia Building Permit (New Construction — Single/Multi-Family Dwelling)Building Permit (New Construction — Single/Multi-Family Dwelling) →
Reno$45.00VerifiedPlumbing Permit →
Sparks$20.00 base + $10.00 supplementalVerifiedPlumbing Permit →
Storey County (includes Virginia City)$23.50Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction) →
Unincorporated Churchill CountyNot published — based on construction valuation; no dedicated plumbing fee table found on the County websiteVerifiedPlumbing Permit →
Unincorporated Clark County$54.00VerifiedPlumbing Permit →
Unincorporated Elko CountyValuation-based per Table 1-A: e.g., $44.00 minimum for valuation up to $1,300; scaling up to $4,955.00 for the first $1,000,000 of valuation plus $2.75 per additional $1,000Verifiedvia Residential Building Permit (1 & 2 Family Dwelling — New Construction)Residential Building Permit (1 & 2 Family Dwelling — New Construction) →
Unincorporated Humboldt County$51.75VerifiedPlumbing Permit →
Unincorporated Lincoln County$20.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction) →
Unincorporated Washoe County$45.00VerifiedPlumbing Permit →
Unincorporated White Pine CountyValuation/fee schedule not published on the county websiteVerifiedPlumbing Permit →
West WendoverExample for a $200,000 valuation new single-family home: Building Permit Fee $1,553.75; Plan Check Fee $1,009.94; Water Impact Fee $3,715.58; Sewer Impact Fee $2,972.46; Total $9,251.73Verifiedvia Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction) →
WinnemuccaNot published as a standalone current fee scheduleVerifiedPlumbing Permit →
Yerington$100.00 per inspectionVerifiedPlumbing Permit (Water Lateral / Sewer Lateral / Septic) →

See the national overview for this permit →