Skip to main content
PermitBase

Do I Need a Permit to Replace a Water Heater in Nevada?

Water heater replacement permit requirements. Yes, even for like-for-like swaps. What inspectors check and how to pass.

Yes — even for a like-for-like replacement.

Why a Simple Swap Needs a Permit

Most jurisdictions require a permit for all water heater replacements, even when you're installing the same type and size. The permit ensures proper venting, gas connections, temperature/pressure relief valve discharge, and seismic strapping. Improper water heater installations are a leading cause of residential CO poisoning and water damage.

What Inspectors Check

The inspector will verify: gas line connections and drip leg (sediment trap), proper venting (metal B-vent for standard, PVC for high-efficiency), T&P relief valve discharging to within 6 inches of the floor or exterior, seismic strapping (two straps — upper and lower third), and adequate combustion air supply.

Tankless Conversion

Converting from a tank to tankless water heater often requires additional work: a larger gas line (tankless units draw more BTUs), PVC venting (most tankless units are high-efficiency), and potentially an electrical outlet for the unit. This may trigger both plumbing and gas permits.

DIY vs. Hiring a Plumber

Many jurisdictions allow homeowners to replace their own water heater in their primary residence — confirm with your city. You still must pull the permit and pass inspection. Most homeowners hire a licensed plumber because the permit and inspection process is simpler when the contractor handles it.

Yes, you need a $40-$60 permit. It's a quick same-day approval and one final inspection. Don't skip it — it protects you and your home.

Permit fees by city in Nevada

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

CityPermit feeSource
Boulder City$40.00VerifiedPlumbing Permit
CarlinSee city page for the current Residential Building Permit (New Construction / Addition / Remodel) feeResidential Building Permit (New Construction / Addition / Remodel)
Carson CityVaries — valuation-based (1.5% of value, $65 min)VerifiedPlumbing Permit
Douglas County$89.93 (flat fee)VerifiedPlumbing Permit
Elko$40.00VerifiedPlumbing Permit
ElySee city page for the current Plumbing Permit feePlumbing Permit
FallonNot published — the UPC's standard Table 104.5 fee schedule was replaced by the City's own 'Table B' per City Code § 17.04.020(G)(1), but the substituted table's dollar amounts were not published in the Municode-hosted ordinance text or found elsewhere on the City's websiteVerifiedPlumbing Permit
Fernley$80VerifiedPlumbing Permit
Henderson$81VerifiedPlumbing Permit
Lander County (including Battle Mountain)Based on project valuation per 1997 UBC Table 1-A; no dollar-figure fee table publishedVerifiedPlumbing Permit
Las Vegas$22 inspection only (no plan check required)VerifiedPlumbing Permit
Lyon County$160.00 flatVerifiedPlumbing Permit (Water Lateral / Sewer Lateral / Septic)
MesquiteSquare footage × $0.045VerifiedPlumbing Permit
North Las Vegas$75 per permitVerifiedPlumbing Permit
Nye County (Unincorporated, incl. Pahrump)Not published as an itemized dollar table on the Nye County Building Department's public websiteVerifiedPlumbing Permit
Pershing County (includes Lovelock)$67.00 per square footVerifiedvia Building Permit (New Construction — Single/Multi-Family Dwelling)Building Permit (New Construction — Single/Multi-Family Dwelling)
Reno$45.00VerifiedPlumbing Permit
Sparks$20.00 base + $10.00 supplementalVerifiedPlumbing Permit
Storey County (includes Virginia City)$23.50Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Churchill CountyNot published — based on construction valuation; no dedicated plumbing fee table found on the County websiteVerifiedPlumbing Permit
Unincorporated Clark County$54.00VerifiedPlumbing Permit
Unincorporated Elko CountyValuation-based per Table 1-A: e.g., $44.00 minimum for valuation up to $1,300; scaling up to $4,955.00 for the first $1,000,000 of valuation plus $2.75 per additional $1,000Verifiedvia Residential Building Permit (1 & 2 Family Dwelling — New Construction)Residential Building Permit (1 & 2 Family Dwelling — New Construction)
Unincorporated Humboldt County$51.75VerifiedPlumbing Permit
Unincorporated Lincoln County$20.00Verifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction)
Unincorporated Washoe County$45.00VerifiedPlumbing Permit
Unincorporated White Pine CountyValuation/fee schedule not published on the county websiteVerifiedPlumbing Permit
West WendoverExample for a $200,000 valuation new single-family home: Building Permit Fee $1,553.75; Plan Check Fee $1,009.94; Water Impact Fee $3,715.58; Sewer Impact Fee $2,972.46; Total $9,251.73Verifiedvia Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)Residential Building Permit (Single-Family, Two-Family, Manufactured Home — New Construction)
WinnemuccaNot published as a standalone current fee scheduleVerifiedPlumbing Permit
Yerington$100.00 per inspectionVerifiedPlumbing Permit (Water Lateral / Sewer Lateral / Septic)

See the national overview for this permit →