Reno building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Reno, Nevada.
Verified 2026-06-30 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 1 E. 1st Street, Reno, NV 89505
- Phone
- (775) 334-2063
- permits@reno.gov
- Office hours
- Mon–Fri (contact department for current hours)
- Website
- Official site
Published scheduling rules
- Download the Reno Building Inspections app to schedule inspections via smartphone. (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation / Footings
Before concrete pour — footings must extend below 24-inch frost line (SDC D2 Reno)
- 2
Framing / Shearwall
After framing complete, before insulation or wall cover — structural connections, anchor bolts, shearwall sheathing
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed
- 4
Insulation / Energy
Insulation and energy compliance verification before drywall
- 5
Final
All work complete, smoke/CO detectors, address posted, ready for Certificate of Occupancy
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Footings and foundation before concrete pour — 24-inch frost depth minimum
- 2
Framing
Structural framing, egress windows, fire separation (if attached)
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed; separate trade permits
- 4
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
Applies to: Commercial Tenant Improvement Permit
- 1
Framing / Structural
After framing complete before walls covered — structural connections and fire separation assemblies
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in before walls closed
- 3
Fire Inspection
Fire alarm, sprinkler, and suppression system inspections by Reno Fire Department
- 4
Final / Certificate of Occupancy
All work complete, life safety systems functional, ready for new tenant occupancy
Applies to: Residential Addition / Remodel Permit
- 1
Footing / Foundation (if new footings)
Before concrete pour — footings below 24-inch frost depth
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, mechanical rough-in before walls closed
- 4
Final
All work complete per approved plans
Applies to: Swimming Pool and Spa Permit
- 1
Pre-Gunite / Shell
Steel/rebar placement and plumbing rough-in before shell is poured or set
- 2
Electrical Rough-In
Bonding, GFCI circuits, conduit runs before equipment set
- 3
Barrier / Fencing
Pool barrier and fence verification — height, self-closing/latching gates, compliant openings per 2024 IRC R326
- 4
Final
Pool filled, all equipment operational, barriers complete, electrical verified
Applies to: Fire Alarm Permit
- 1
Rough-In
Wiring and device placement before wall/ceiling cover
- 2
Battery / Standby Power Test
Verify installed batteries against the RFD battery calculation worksheet (24-hour standby, 5-minute alarm, or 15-minute alarm for voice systems)
- 3
Final / RFD Acceptance Test
Full system test; device identifiers verified against line diagram and battery calculations; RFD sign-off obtained
Applies to: Fire Sprinkler Permit
- 1
Underground / Rough-In
Piping, hangers, and riser installation before concealment
- 2
Fire Flow / Acceptance Test
System flow test witnessed by Reno Fire Department; verify against approved hydraulic calculations
- 3
Final
All work complete per approved plans, RFD sign-off obtained
Applies to: Mechanical / HVAC Permit
- 1
Gas Piping Pressure Test
Required before concealing gas piping — 11–15 inches water column held for 15 minutes minimum (NNICC manometer test requirement for Reno)
- 2
Rough-In / Equipment
Equipment installation and ductwork before walls closed — verify clearances and venting
- 3
Final
Equipment operational, combustion air verified, venting correct
Applies to: Plumbing Permit
- 1
Underground / Under-slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed before walls closed — pressure test
- 3
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement — before walls or ceiling cover
- 2
Final — Structural / Racking
Panel mounting, racking attachment, roof penetration sealing verified
- 3
Final — Electrical
All connections, inverter, and interconnection point verified; licensed contractor/journeyman must be on site
Applies to: Block / Screen Wall and Fence Permit
- 1
Footing
Before concrete pour for retaining walls and structural walls — depth and reinforcing
- 2
Final
Fence or wall constructed per approved plans — height, materials, location, gates, vision triangle compliance
Applies to: Demolition Permit
- 1
Pre-Demolition Utilities Verification
Verification that gas, electric, water, and sewer are disconnected before demolition begins
- 2
Final
Site cleared and graded, all debris removed, utilities properly capped
Applies to: Electrical Permit
- 1
Rough-In
Wiring and conduit installed before walls closed — conductor sizing, box placement, service connections
- 2
Final
All devices installed, panel labeled, GFCI/AFCI protection verified, system energized
Final inspection only: Certificate of Occupancy, EV Charging Station Permit (Electrical Permit), Roofing Permit (Reroof), Sign Permit
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Reno building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.