Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Reno city limits. The City publishes no dedicated EV charger/EVSE permit category or EZ Permit (its EZ Permit list covers items like Service Change, Meter Lockout, Water Heater, and HVAC replacement, but not EV chargers) — an EV charger circuit is expected to be billed under the City's standard flat-rate Electrical Permit fee schedule, the same one this file's electrical-permit entry documents.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the new/upgraded circuit and EVSE connection, per City of Reno permitting requirements
  • Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City
  • No dedicated EV/EVSE EZ Permit exists — the City's EZ Permit program (simplified, no-plan-review permits) is limited to items such as Service Change, Electrical Meter Lockout, Water Heater/Boiler replacement, and HVAC replacement
  • Apply via the City's standard permit intake channels (Accela Citizen Access / Development Services Building Permits)
  • If the charger install requires a panel/service upgrade, that scope is billed under the Rewire/Service Upgrade flat-rate category instead

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Receptacles/Switch/Outlet/Fixtures — first 20 (flat rate) — closest published category for a new EV charger circuit/receptacleCity of Reno FY27 Flat Rate Permit Types — Electrical Permit Types; no dedicated EV/EVSE line item was located in this file's research, so the closest existing flat-rate category (a new circuit/receptacle installation) is cited rather than an invented figure. If the project instead involves a service/panel upgrade to support the charger, the 'Rewire / Service Upgrade — up to 3,000 sq ft' flat rate ($135.00) or 'Service Change — residential EZ permit' ($88.00) documented in this file's electrical-permit entry may apply instead.
$135.00 (includes application and permit issuance fees)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charging Station Permit (Electrical Permit) permit actually take in Reno?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Final

    EVSE breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625

See the full Reno inspection guide — scheduling & re-inspection fees →

Tips

  • Reno has no dedicated EV charger/EVSE permit category or EZ Permit — expect the standard flat-rate Electrical Permit process to apply, most likely under the Receptacles/Switch/Outlet/Fixtures flat-rate tier for a new dedicated circuit.
  • If the installation requires a panel or service upgrade, budget for the higher Rewire/Service Upgrade flat-rate fee tier instead of the receptacle/circuit tier.
  • Confirm the applicable fee category directly with Permit Services, 775-334-2063, since the City does not publish an EV-specific line item.

Frequently asked questions

Reno requires an ev charging station permit (electrical permit) for: Electrical permit required for the new/upgraded circuit and EVSE connection, per City of Reno permitting requirements; Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City; No dedicated EV/EVSE EZ Permit exists — the City's EZ Permit program (simplified, no-plan-review permits) is limited to items such as Service Change, Electrical Meter Lockout, Water Heater/Boiler replacement, and HVAC replacement; Apply via the City's standard permit intake channels (Accela Citizen Access / Development Services Building Permits); If the charger install requires a panel/service upgrade, that scope is billed under the Rewire/Service Upgrade flat-rate category instead. If your project isn't listed, confirm with City of Reno Development Services — Building and Safety Division at (775) 334-2063 before starting work.

In Reno, the published Receptacles/Switch/Outlet/Fixtures — first 20 (flat rate) — closest published category for a new EV charger circuit/receptacle is: $135.00 (includes application and permit issuance fees). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Reno does not publish a plan-review timeline for this permit. Contact City of Reno Development Services — Building and Safety Division at (775) 334-2063 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Reno requires 1 inspection(s) for an ev charging station permit (electrical permit), in order: Electrical Final. Schedule each through City of Reno Development Services — Building and Safety Division ((775) 334-2063).

Apply through City of Reno Development Services — Building and Safety Division at 1 E. 1st Street, Reno, NV 89505. Phone: (775) 334-2063, email: permits@reno.gov. Office hours: Mon–Fri (contact department for current hours). Official information: https://www.reno.gov/business-development/development-services/building-permits.php.

Reno, Nevada has adopted: 2024 International Building Code (IBC) — with 2024 Northern Nevada ICC Amendments (NNICC); effective July 1, 2025; 2024 International Residential Code (IRC) — with 2024 Northern Nevada ICC Amendments; effective July 1, 2025; 2024 International Existing Building Code (IEBC) — with 2024 Northern Nevada ICC Amendments; 2024 International Energy Conservation Code (IECC) — with 2024 Northern Nevada ICC Amendments; 2024 International Fuel Gas Code (IFGC) — with 2024 Northern Nevada ICC Amendments; 2024 International Mechanical Code (IMC) — with 2024 Northern Nevada ICC Amendments (commercial/multi-family); 2024 Uniform Mechanical Code (UMC) — with 2024 Northern Nevada ICC Amendments (residential single-family); 2024 Uniform Plumbing Code (UPC) — with 2024 Northern Nevada ICC Amendments (NOTE: Reno uses UPC, not IPC); 2023 National Electrical Code (NEC) — with 2024 Northern Nevada ICC Amendments; effective July 1, 2025; Nevada Blue Book (2020) — statewide construction industry reference, incorporates NRS/NAC provisions. Local amendments apply — see the Reno overview page for the full list.

Yes, an Electrical Permit. Reno has no dedicated EV charger/EVSE fee category or EZ Permit — the closest published flat-rate category is Receptacles/Switch/Outlet/Fixtures ($135.00) for a new dedicated circuit, or the Rewire/Service Upgrade tier if a panel/service upgrade is also needed.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Reno building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.