EV Charging Station Permit (Electrical Permit) in Reno, Nevada
Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Reno city limits. The City publishes no dedicated EV charger/EVSE permit category or EZ Permit (its EZ Permit list covers items like Service Change, Meter Lockout, Water Heater, and HVAC replacement, but not EV chargers) — an EV charger circuit is expected to be billed under the City's standard flat-rate Electrical Permit fee schedule, the same one the electrical-permit entry documents.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the new/upgraded circuit and EVSE connection, per City of Reno permitting requirements
- Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City
- No dedicated EV/EVSE EZ Permit exists — the City's EZ Permit program (simplified, no-plan-review permits) is limited to items such as Service Change, Electrical Meter Lockout, Water Heater/Boiler replacement, and HVAC replacement
- Apply via the City's standard permit intake channels (Accela Citizen Access / Development Services Building Permits)
- If the charger install requires a panel/service upgrade, that scope is billed under the Rewire/Service Upgrade flat-rate category instead
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Reno FY27 Flat Rate Permit Types — Electrical Permit Types; Show full citationHide
City of Reno FY27 Flat Rate Permit Types — Electrical Permit Types; no dedicated EV/EVSE line item was located in the research, so the closest existing flat-rate category (a new circuit/receptacle installation) is cited rather than an invented figure. If the project instead involves a service/panel upgrade to support the charger, the 'Rewire / Service Upgrade — up to 3,000 sq ft' flat rate ($135.00) or 'Service Change — residential EZ permit' ($88.00) documented in the electrical-permit entry may apply instead.Review timeline
Inspection process
- 1
Electrical Final
EVSE breaker sizing, GFCI protection (where applicable), working clearances, and charger mounting verified against NEC Article 625
See the full Reno inspection guide — scheduling & re-inspection fees →
Tips
- Reno has no dedicated EV charger/EVSE permit category or EZ Permit — expect the standard flat-rate Electrical Permit process to apply, most likely under the Receptacles/Switch/Outlet/Fixtures flat-rate tier for a new dedicated circuit.
- If the installation requires a panel or service upgrade, budget for the higher Rewire/Service Upgrade flat-rate fee tier instead of the receptacle/circuit tier.
- Confirm the applicable fee category directly with Permit Services, 775-334-2063, since the City does not publish an EV-specific line item.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Online permit portal
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Reno building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Reno's permit history is searchable by address
11,274 permits on record for Reno, 2024–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Reno
EV Charging Station Permit (Electrical Permit) in other cities
Compare ev charging station permit (electrical permit) fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Reno project checklist
Describe your project once and get every permit, document, and fee it triggers in Reno — in one checklist. Free, for any city and any number of projects.
Get started →