Sign Permit in Las Cruces, New Mexico

Required for installation, alteration, or reconstruction of most signs within Las Cruces city limits, under Land Development Code Chapter 36 (Signs), unless the specific sign type is exempted under LDC Sec. 36-9(b). Fee is based on sign type (attached, pole, monument, multi-sign site plan, or billboard) rather than project valuation; an additional electrical permit is required separately for illuminated signs.

Verified 2026-07-22 · Source

When you need this permit

  • A sign permit is required for all signs in the city unless specifically exempted under LDC Sec. 36-9(b) — exempt categories include accessory use signs, real estate signs and construction/renovation signs not exceeding 16 sq ft, model complex signs not exceeding 16 sq ft, directional signs, political signs other than billboards, government signs, house/building nameplates, and several other listed categories
  • All signs must conform to the structural design requirements of the International Building Code (IBC) and companion documents (LDC Sec. 36-6(a))
  • Freestanding sign permit applications for signs exceeding 20 feet in height (measured from ground level) must be accompanied by an engineer's design drawing showing structural calculations, stamped by a New Mexico-licensed engineer (LDC Sec. 36-6(b))
  • Illuminated signs require a separate electrical permit in addition to the sign permit
  • Rebuilding a nonconforming billboard to meet current size/height/configuration/support requirements still requires a sign permit (LDC Sec. 36-8(d))
  • No sign may be placed on any property without the written consent of the owner or the owner's authorized agent (LDC Sec. 36-11(h))
  • Apply online through the City of Las Cruces Citizen Portal (Accela)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Attached Sign — New or AlterationCity of Las Cruces 2023 Schedule of Fees, Sign Permit Fee section
$50.00
Attached Sign — Face Change (existing sign cabinet)City of Las Cruces 2023 Schedule of Fees
$0.00
Pole Sign — New or AlterationCity of Las Cruces 2023 Schedule of Fees
$80.00
Pole Sign — Face ChangeCity of Las Cruces 2023 Schedule of Fees
$0.00
Monument Sign — New or AlterationCity of Las Cruces 2023 Schedule of Fees
$110.00
Monument Sign — Face ChangeCity of Las Cruces 2023 Schedule of Fees
$0.00
Site Plan with Multiple SignsCity of Las Cruces 2023 Schedule of Fees
$270.00
Billboards — New or AlterationCity of Las Cruces 2023 Schedule of Fees
$280.00
Real Estate or Construction SignsCity of Las Cruces 2023 Schedule of Fees; consistent with the LDC Sec. 36-9(b) exemption for real estate signs and construction/renovation signs not exceeding 16 sq ft, which do not require a permit at all
$0.00
Electrical Permit for Illuminated Signs (Commercial Electrical Permit Fees, Miscellaneous Inspection Work — Signs)City of Las Cruces 2023 Schedule of Fees, Electrical Permit Fees section; billed as a separate electrical permit in addition to the sign permit fee for any illuminated sign
$75.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Las Cruces building department
~0–8 business days

How long did your Sign Permit permit actually take in Las Cruces?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing / Foundation

    Required only for pole and monument (freestanding) signs; verifies footing depth and reinforcement before concrete is placed

  2. 2

    Final

    Verifies the completed sign matches the approved permit plans; a separate electrical final inspection is required for illuminated signs

See the full Las Cruces inspection guide — scheduling & re-inspection fees →

Tips

  • Real estate signs and construction/renovation signs not exceeding 16 sq ft are exempt from both the permit requirement (LDC Sec. 36-9(b)) and the fee ($0.00 per the Schedule of Fees) — the code and fee schedule agree on this exemption.
  • Face/copy changes on an already-permitted sign cabinet are free ($0.00) across attached, pole, and monument sign types — only new installs or structural alterations carry a fee.
  • Freestanding signs over 20 feet in height require a New Mexico-licensed engineer's stamped structural drawing — budget extra time and cost for tall pole signs and billboards.
  • Illuminated signs need a second, separate electrical permit ($75.00) in addition to the sign permit itself.

Frequently asked questions

No. Real estate signs not exceeding 16 sq ft, garage sale signs, and political signs (other than billboards) are exempt from the sign permit requirement under LDC Sec. 36-9(b), and the Schedule of Fees lists a $0.00 fee for 'Real Estate or Construction Signs.'

$50.00 for an attached sign, $80.00 for a pole sign, $110.00 for a monument sign, $270.00 for a site plan with multiple signs, and $280.00 for a billboard (new installation or alteration). Face/copy changes on an existing sign cabinet are free. Illuminated signs require an additional $75.00 electrical permit. Source: City of Las Cruces 2023 Schedule of Fees.

Plan review for a sign permit in Las Cruces typically runs 0–8 business days. This is an estimate, not a published figure — confirm current review times with City of Las Cruces Community Development Department — Building and Development Services (One Stop Shop) at 575-528-3222.

You'll need: Sign Permit Application; Site Plan. Depending on your project, Las Cruces may also ask for: Engineer-Stamped Structural Drawing; Electrical Permit Application. See the required-documents checklist on this page for details on each.

Las Cruces requires 2 inspection(s) for a sign permit, in order: Footing / Foundation, Final. Schedule each through City of Las Cruces Community Development Department — Building and Development Services (One Stop Shop) (575-528-3222).

Apply through City of Las Cruces Community Development Department — Building and Development Services (One Stop Shop) at 700 N. Main St., Suite 1100, P.O. Box 20000, Las Cruces, NM 88001. Phone: 575-528-3222, email: inspectionrequest@lascruces.gov. Office hours: Monday, Tuesday, Thursday, Friday 7:30 AM - 5:00 PM; Wednesday 8:00 AM - 2:00 PM (afternoon closed for admin/training); online access 24 hours. Official information: https://lascruces.gov/property/remodeling-and-construction/.

Las Cruces, New Mexico has adopted: New Mexico is a statewide-minimum-code state under the Construction Industries Licensing Act (NMSA 1978 § 60-13-44(E)): 'All political subdivisions of the state are subject to the provisions of codes adopted and approved under the Construction Industries Licensing Act. Such codes constitute a minimum requirement for the codes of political subdivisions.' A county or municipality may become its own code-enforcement authority (operate independently of the state Construction Industries Division field offices) if it employs a certified building official and has adopted at least the current state minimum code standards (NMSA 1978 § 60-13-41(D)-(F)). The City of Las Cruces operates its own Building and Development Services / Community Development Department with its own building official and inspection staff (rather than routing permits through the state CID field office model used in unincorporated areas), enforcing the state-adopted codes as the applicable minimum within city limits.; 2021 New Mexico Commercial & Residential Building Code (based on the 2021 IBC / 2021 IRC), per NM Construction Industries Division (CID) current adoption; 2021 International Building Code (IBC), as adopted/amended by CID; 2021 International Residential Code (IRC), as adopted/amended by CID; 2021 New Mexico Energy Conservation Code (based on the International Energy Conservation Code, IECC) — addresses the New Mexico climate zone for energy conservation; applies to new and renovated residential and commercial buildings; 2021 New Mexico Plumbing and Mechanical Code, incorporating the 2021 Uniform Mechanical Code (IAPMO) and 2021 Uniform Plumbing Code (IAPMO); 2020 New Mexico Electrical Code / 2020 National Electrical Code (NEC), adopted by reference at 14.10.4 NMAC, effective March 28, 2023 (permits issued only under this rule after September 28, 2023) — this is the current, in-force edition; it supersedes any references to a 2023 NEC edition found on third-party aggregator sites; 2012 Solar Energy Code (IAPMO), as adopted by CID; 2017 ICC/ANSI A117.1 (Accessible and Usable Buildings and Facilities), as adopted by CID; 2012 Uniform Swimming Pool, Spa and Hot Tub Code, as adopted by CID; Las Cruces Land Development Code, Chapter 30 (Buildings and Building Regulations) and Chapter 38 (Zoning) — local building-permit administration, fee schedule, and zoning provisions. Local amendments apply — see the Las Cruces overview page for the full list.

Most do. LDC Sec. 36-9(a) requires a sign permit for all signs unless the specific sign type is listed as exempt in Sec. 36-9(b) — for example, real estate signs and construction/renovation signs not exceeding 16 sq ft, directional signs, political signs other than billboards, and government signs.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Las Cruces building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.